TAC:07982
From kanterella
(Redirected from TAC:7982)
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers | |
| From | |
MONTHYEARA810020, Responds to 801222 Request for Addl Info Re Control of Heavy Loads.Interim Actions Described in Encl 2 to NRC Ltr Were Implemented Prior to 810315.Diagrams Encl1981-06-30030 June 1981
[table view]Responds to 801222 Request for Addl Info Re Control of Heavy Loads.Interim Actions Described in Encl 2 to NRC Ltr Were Implemented Prior to 810315.Diagrams Encl ML20052J0011982-02-12012 February 1982 To IF-300 Redundant Yoke,NUREG-0612 Evaluation ML20067C6231982-12-0303 December 1982 Provides Addl Info in Response to 811005 Draft Technical Evaluation Rept Re Guideline 4 of NUREG-0612 on Special Lifting Devices ML20072A1581982-12-30030 December 1982 Control of Heavy Loads (C-10),Nebraska Public Power District,Cooper Nuclear Station, Draft Technical Evaluation Rept ML20077F4121983-07-25025 July 1983 Forwards Addl Info Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Phase 1 Issues,In Response to 830526 Request.Signalman Will Direct Crane Operator Along Load Paths on Refueling Floor ML20077M1001983-09-0808 September 1983 Control of Heavy Loads (C-10),Cooper Nuclear Station, Technical Evaluation Rept ML20078C1551983-09-16016 September 1983 Responds to 830901 Telcon Request for Addl Info Re Util Initial Heavy Loads Submittal.All Special Lifting Devices Overload Tested to at Least 125%.Dryer/separator Plug Strongback Upgraded & Retested to at Least 125% 1982-02-12 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:07982&oldid=3510967"