Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML20067C6233 December 1982Nebraska Public Power District
Pilant J
Provides Addl Info in Response to 811005 Draft Technical Evaluation Rept Re Guideline 4 of NUREG-0612 on Special Lifting DevicesDraft Other
ML20072A15830 December 1982Vosbury F
FRANKLIN INSTITUTE
Vito D
Sargent I
Control of Heavy Loads (C-10),Nebraska Public Power District,Cooper Nuclear Station, Draft Technical Evaluation ReptDraft Other
ML20077F41225 July 1983Nebraska Public Power District
Kuncl L
Forwards Addl Info Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Phase 1 Issues,In Response to 830526 Request.Signalman Will Direct Crane Operator Along Load Paths on Refueling FloorOther
ML20077M1008 September 1983FRANKLIN INSTITUTE
Bomberger C
Control of Heavy Loads (C-10),Cooper Nuclear Station, Technical Evaluation ReptOther
ML20078C15516 September 1983Nebraska Public Power District
Pilant J
Responds to 830901 Telcon Request for Addl Info Re Util Initial Heavy Loads Submittal.All Special Lifting Devices Overload Tested to at Least 125%.Dryer/separator Plug Strongback Upgraded & Retested to at Least 125%Request