Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20067C623 | 3 December 1982 | Nebraska Public Power District Pilant J | Provides Addl Info in Response to 811005 Draft Technical Evaluation Rept Re Guideline 4 of NUREG-0612 on Special Lifting Devices | Draft Other |
ML20072A158 | 30 December 1982 | Vosbury F FRANKLIN INSTITUTE Vito D Sargent I | Control of Heavy Loads (C-10),Nebraska Public Power District,Cooper Nuclear Station, Draft Technical Evaluation Rept | Draft Other |
ML20077F412 | 25 July 1983 | Nebraska Public Power District Kuncl L | Forwards Addl Info Re NUREG-0612, Control of Heavy Loads at Nuclear Power Plants, Phase 1 Issues,In Response to 830526 Request.Signalman Will Direct Crane Operator Along Load Paths on Refueling Floor | Other |
ML20077M100 | 8 September 1983 | FRANKLIN INSTITUTE Bomberger C | Control of Heavy Loads (C-10),Cooper Nuclear Station, Technical Evaluation Rept | Other |
ML20078C155 | 16 September 1983 | Nebraska Public Power District Pilant J | Responds to 830901 Telcon Request for Addl Info Re Util Initial Heavy Loads Submittal.All Special Lifting Devices Overload Tested to at Least 125%.Dryer/separator Plug Strongback Upgraded & Retested to at Least 125% | Request |