Request for: Approved, Closed | |
Initiation
Questions Answers | |
From | |
MONTHYEARML20235B2351987-09-16016 September 1987
[table view]Requests Relief from Tech Spec 3.1.1.5 Re Inoperability of DHR Sys & RCS During Special Test Procedure STP.961, Loss of Offsite Power Test. Test Needed to Verify Independence within Electrical Distribution Sys.Related Info Encl ML20236J1451987-10-30030 October 1987 Advises That No Tech Spec Relief Necessary to Conduct Tests on New Emergency Diesel Generators & Associated Electrical Distribution Sys.Proposed Test Should Be Conducted Under Provisions of 10CFR50.59 W/O Changing Existing Tech Spec ML20236Q2381987-11-10010 November 1987 Forwards Safety Evaluation Supporting Plant Electrical Distribution Sys Design (Ref Tdi Diesel Generators).Approval of Design Required Before Performance of Loss of Offsite Power Test 1987-11-10 |