TAC:64779
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
| From | |
MONTHYEARML20211H0811987-02-13013 February 1987
[table view]Proposed Tech Specs,Revising Scram Time Testing to Achieve Consistency W/Ge Transient Analysis Methodology & to Allow Insertion of Four Lead Test Assemblies Into Unit 1 Reactor ML20211H0181987-02-13013 February 1987 Application for Amend to Licenses DPR-57 & NPF-5,revising Tech Specs to Achieve Consistency W/Ge Transient Analysis Methodology Re Scram Time Testing.Documents Supporting Proposed Change Withheld (Ref 10CFR2.790).Fee Paid ML20214K5181987-05-18018 May 1987 Proposed Tech Spec,Adding Formula for Calculating Statistical Scram Speed Limit to Bases Section ML20214K4961987-05-18018 May 1987 Forwards Revised Tech Specs Page 3.11-4a Re Scram Time Measurement,Adding Formula for Calculating Statistical Scram Limit to Bases Section ML20214T6041987-06-0101 June 1987 Amends 139 & 76 to Licenses DPR-57 & NPF-5,respectively, Changing Tech Specs Re Scram Speed Limit,Definition of Design Power,Lead Test Fuel Assemblies & Min Critical Power Ratio Limit ML20236H3501987-07-31031 July 1987 Advises That GE 1987 Hatch 1 Lead Test Assembly Description, Encl W/Util 870213 Application,Will Be Withheld,Per 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954 1987-05-18 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:64779&oldid=3224302"