TAC:43380
From kanterella
(Redirected from TAC:47355)
Request for: Approved, Closed | |
Initiation
Results Other: A01155, Forwards Nonproprietary & Proprietary Versions of Test Rept, Hydraulic Flow Test of Model C Prototype Fuel Assembly. Application & Affidavit for Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790), A01183, Submits Info Re Justification of Measurement Uncertainty Values for Axial Shape Index,Pressure,Temp,Flow & Power,In Response to NRC 801006 Request, A01184, Submits Resolution of Cycle 4 Startup Commitments,Re Effect of Predicted Bundle Deformation on Heat Transfer from Fuel Rods During Reflooding Stage of LOCA, A01848, Advises That Licensee Will Not Propose License Amend to Tech Specs,Section 5 to Include Guide Tube Sleeving Requirements for Fuel Assemblies Located Under Control Element Assemblies.Current Fixes Adequate, B10342, Part 21 Rept Re Resistance Temp Detectors (RTD) & Associated Signal Processing Equipment Scheduled for Installation During Refueling Outage in Early 1983.Steps Taken to Ensure Reliable RTD Operation in Interim Listed, B10408, Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 820212, B10425, Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes, B10427, Advises That Evaluations of Clad Collapse & Fission Gas Pressure Have Been Performed for C-E Fuel to Be Utilized During Cycle 5, B10433, Submits Addl Info Supporting 820204 Cycle 5 non-LOCA Transient Analyses Results for Addl Plugged Steam Generator Tubes,Per Request.Increasing Number of Tubes Do Not Require Tech Spec Mods, ML19290E339, ML19312E212, ML19330B446, ML19350A511, ML20002D299, ML20031C479, ML20040A520, ML20041C396, ML20042C153, ML20042C157 | |
| From | |
MONTHYEARML19290E3391980-03-0606 March 1980
[table view]Forwards Basic Safety Rept, in Support of Cycle 4 Reload. Affidavit Encl.Rept Withheld (Ref 10CFR2.790) & Available in Central Files Only B10002, Forwards Proprietary Version of Basic Safety Rept Addendum, Nuclear Uncertainties, Supplementing Rept Section 4.0. Describes Power Peaking Factor Uncertainty Analysis Used in Reload Fuel Design.Rept Withheld (Ref 10CFR2.790)1980-05-28028 May 1980 Forwards Proprietary Version of Basic Safety Rept Addendum, Nuclear Uncertainties, Supplementing Rept Section 4.0. Describes Power Peaking Factor Uncertainty Analysis Used in Reload Fuel Design.Rept Withheld (Ref 10CFR2.790) ML19312E2121980-05-31031 May 1980 Addendum to Basic Safety Rept Re Nuclear Uncertainties, Nonproprietary Version ML19326D8271980-06-20020 June 1980 Requests Response to Encl Questions Re Fuel Design & Physics Calculations to Complete Review of Basic Safety Rept Supporting Cycle 4 Reload.Requests That Addl Info Be Provided by 800630 to Meet Review Schedule ML19330B4461980-07-22022 July 1980 Forwards Addl Response to Questions on Cycle 4 Basic Safety Rept,In Response to .Info in 800707 Submittal Is Not Proprietary to Westinghouse or C-E A01183, Submits Info Re Justification of Measurement Uncertainty Values for Axial Shape Index,Pressure,Temp,Flow & Power,In Response to NRC 801006 Request1981-01-0808 January 1981 Submits Info Re Justification of Measurement Uncertainty Values for Axial Shape Index,Pressure,Temp,Flow & Power,In Response to NRC 801006 Request ML20002D2991981-01-16016 January 1981 Requests Review of Util Basic Safety Rept So That Potential for 10CFR50.59 Reload for Cycle 5 Can Be Realized at Facility.Request Originally Made on 800306.NRC 801006 Response Did Not Accept Rept as Ref Document A01155, Forwards Nonproprietary & Proprietary Versions of Test Rept, Hydraulic Flow Test of Model C Prototype Fuel Assembly. Application & Affidavit for Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790)1981-03-0606 March 1981 Forwards Nonproprietary & Proprietary Versions of Test Rept, Hydraulic Flow Test of Model C Prototype Fuel Assembly. Application & Affidavit for Withholding Encl.Proprietary Rept Withheld (Ref 10CFR2.790) ML19350A5111981-03-31031 March 1981 Nonproprietary Version of Hydraulic Flow Test of Model C Prototype Fuel Assembly A01184, Submits Resolution of Cycle 4 Startup Commitments,Re Effect of Predicted Bundle Deformation on Heat Transfer from Fuel Rods During Reflooding Stage of LOCA1981-06-0808 June 1981 Submits Resolution of Cycle 4 Startup Commitments,Re Effect of Predicted Bundle Deformation on Heat Transfer from Fuel Rods During Reflooding Stage of LOCA ML20005A9571981-06-12012 June 1981 Safety Evaluation Supporting Ref of Basic Safety Rept as Fuel Assembly & Safety Analysis Rept ML20005A9541981-06-22022 June 1981 Submits Physics Review of 800306 Basic Safety Rept.Rept Intended to Serve as Ref Fuel Assembly & Safety Analysis Rept.Rept Acceptable for Ref in Licensing Actions.Review Will Be Completed by 810901 A01848, Advises That Licensee Will Not Propose License Amend to Tech Specs,Section 5 to Include Guide Tube Sleeving Requirements for Fuel Assemblies Located Under Control Element Assemblies.Current Fixes Adequate1981-09-11011 September 1981 Advises That Licensee Will Not Propose License Amend to Tech Specs,Section 5 to Include Guide Tube Sleeving Requirements for Fuel Assemblies Located Under Control Element Assemblies.Current Fixes Adequate ML20031A8141981-09-18018 September 1981 Forwards Request for Addl Info Re Westinghouse Basic Safety Rept Re Cycle 5 Reload ML20031C4791981-09-28028 September 1981 Provides Info Re Guide Tube Wear Experienced in Sleeved C-E, Sleeved Westinghouse,Low Flow C-E & Inset Westinghouse Fuels,Per 801006 Commitment,In Support of Continued Operation W/Modified Guide Tubes in Cycle 5 ML20031G3521981-10-15015 October 1981 Forwards Supplementary Steam Generator Insp Program - Cycle 5 Reload,Per Amend 61 to License DPR-65 ML20031G3561981-10-31031 October 1981 Supplementary Steam Generator Insp Program - Cycle 5 Reload B10348, Application to Amend Tech Specs for License DPR-56,revising Section 3/4.9.8 Re Shutdown Cooling & Coolant Circulation During Refueling Operations to Increase Flexibility During Leak Testing1981-12-0202 December 1981 Application to Amend Tech Specs for License DPR-56,revising Section 3/4.9.8 Re Shutdown Cooling & Coolant Circulation During Refueling Operations to Increase Flexibility During Leak Testing B10342, Part 21 Rept Re Resistance Temp Detectors (RTD) & Associated Signal Processing Equipment Scheduled for Installation During Refueling Outage in Early 1983.Steps Taken to Ensure Reliable RTD Operation in Interim Listed1981-12-0808 December 1981 Part 21 Rept Re Resistance Temp Detectors (RTD) & Associated Signal Processing Equipment Scheduled for Installation During Refueling Outage in Early 1983.Steps Taken to Ensure Reliable RTD Operation in Interim Listed ML20040A3471981-12-24024 December 1981 Forwards Request for Addl Info Necessary to Complete Review of Reload Safety Analysis for Cycle 5 Operation.Info Should Be Submitted by 820111 ML20040E2041982-01-12012 January 1982 Forwards Safety Evaluation of Westinghouse Basic Safety Rept.Transient Analysis for Startup of Inactive Reactor Coolant Pump,Excess Load & Loss of Normal Feedwater Acceptable B10382, Application to Amend License DPR-65,revising Tech Spec Section 3/4.1.1 Re Shutdown Margin Required in Modes 1-41982-01-14014 January 1982 Application to Amend License DPR-65,revising Tech Spec Section 3/4.1.1 Re Shutdown Margin Required in Modes 1-4 ML20040A5201982-01-30030 January 1982 Proposed Revision to Tech Spec Section 3/4.1.1,changing Limiting Condition for Operation,Surveillance Requirements & Bases for Shutdown Margin Required in Modes 1-4 B10408, Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 8202121982-02-0404 February 1982 Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 820212 ML20041E1141982-02-18018 February 1982 Forwards Safety Evaluation Re Reactor Fuels & Thermal Hydraulic Sections of Basic Safety Rept (Bsr).Reactor Fuel Design & Thermohydraulic Characteristics Including Transient & Accident Analyses Addressed in Bsr Acceptable A02239, Forwards Requested Addl Info Re Response to TMI Action Item I.A.1.1., Shift Technical Advisor.Info Consists of Name,Nuclear Experience,College Courses Completed & Training for Each Nondegreed Shift Technical Advisor1982-02-19019 February 1982 Forwards Requested Addl Info Re Response to TMI Action Item I.A.1.1., Shift Technical Advisor.Info Consists of Name,Nuclear Experience,College Courses Completed & Training for Each Nondegreed Shift Technical Advisor B10425, Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes1982-02-19019 February 1982 Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes B10433, Submits Addl Info Supporting 820204 Cycle 5 non-LOCA Transient Analyses Results for Addl Plugged Steam Generator Tubes,Per Request.Increasing Number of Tubes Do Not Require Tech Spec Mods1982-02-23023 February 1982 Submits Addl Info Supporting 820204 Cycle 5 non-LOCA Transient Analyses Results for Addl Plugged Steam Generator Tubes,Per Request.Increasing Number of Tubes Do Not Require Tech Spec Mods B10427, Advises That Evaluations of Clad Collapse & Fission Gas Pressure Have Been Performed for C-E Fuel to Be Utilized During Cycle 51982-02-23023 February 1982 Advises That Evaluations of Clad Collapse & Fission Gas Pressure Have Been Performed for C-E Fuel to Be Utilized During Cycle 5 ML20041C3961982-02-28028 February 1982 Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes ML20042C1531982-03-0505 March 1982 Amend 74 to License DPR-65,authorizing Cycle 5 Operation & Amending App a Tech Specs ML20042C1571982-03-0505 March 1982 Notice of Issuance & Availability of Amend 74 to License DPR-65 ML20042C1561982-03-0505 March 1982 Safety Evaluation Supporting Amend 74 to License DPR-65 1981-06-12 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:43380&oldid=5533414"