TAC:44222
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Initiation
Questions Answers Results
Other: ML20009A501, ML20023D329, ML20027C268, ML20071E998, ML20074A401, ML20079Q695 | |
| From | |
MONTHYEARML20009A5011981-07-0101 July 1981
[table view]Forwards Design Description & Operating Guidelines for Proposed RCS Vents,In Response to NRC .Operating Procedures Will Be Available at Site.Hot Leg & Pressurizer Vents Installation Scheduled for Fall 1981 Refueling Outage ML20027C2681982-10-12012 October 1982 Requests Exemption from 10CFR50.44(c)(3)(iii) Requiring Reactor Vessel Head High Point Vent.Alternative Methods for Vent Performance Provided in Util 810130 Submittal,In Response to NUREG-0737,Item II.B.1 ML17345A9621983-02-22022 February 1983 Notification of 830307 Meeting W/Utils & NUS Corp in Bethesda,Md to Discuss Proposed Rev to 10CFR40.36 (Tech Specs) ML20071E9981983-03-0909 March 1983 Advises That Info Per Re Exemption from 10CFR50.44(c)(3)(iii), Installation of Reactor Vessel Head Vent, Requirements Will Be Submitted by 830513 ML20079Q6951983-03-14014 March 1983 Selected Operating Reactor Issues Program Ii:Rcs Vents (NUREG-0737,Item II.B.1), Final Technical Evaluation Rept ML20023D3291983-04-29029 April 1983 Submits Response to NRC Re Exemption from 10CFR50.44(c)(3)(iii), Reactor Vessel Head Heat. Interim Exemption Extending Implementation Deadline Requested Prior to Restart from Refueling Outage Scheduled for 830709 ML20074A4011983-05-0606 May 1983 Notifies of Preliminary Plan to Implement 820104 Amend to Regulation Re Hydrogen Recombiner Requirement Scheduled for Spring 1985 Refueling Outage.External Recombiner Must Be safety-grade to Ensure Accident Survivability 1983-03-14 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:44222&oldid=5503114"