ML19263A926

From kanterella
Jump to navigation Jump to search
Util Will Develop Detailed Design of Steam Generator Dual Level Setpoint for Auxiliary Feedwater Control by 790221. Will Submit Proposed Schedule & Safety Evaluation to Determine If Change Requires License Amend
ML19263A926
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/28/1978
From: Roe L
TOLEDO EDISON CO.
To: Reid R
Office of Nuclear Reactor Regulation
References
476, TAC-11050, NUDOCS 7901030231
Download: ML19263A926 (1)


Text

F .

TOLEDO

%mm EDISON LOWELL E. ROE TELECOPIED y,,, p,,u,,

Facet 4es Developwnt (4191 259-524?

Docket No. 50-346 License No. hTF-3 Serial No. 476 December 28, 1978 Director of Nuclear Reactor Regulation

/ttention: Mr. Robert W. Reid, Chief Operating Reactors Branch No. 4 Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Mr. Reid:

This letter is in response to a request made by Mr. B. Grimes during a conference telephone call on December 23, 1978, between personnel from NRR, Region III and Toledo Edison, that we confirm certain com-nitments made during the telephone call.

We committed to develop the detailed engineering design of a steam generator dual levei setpoint for auxiliary feedwater control and to submit this design to you by February 21, 1979. We also committed to develop and submit, by this same date, a proposed schedule to implement this facility change and a written safety evaluation in accordance with 10 CFR 50.59, indicating our determination as to whether the proposed facility change would require a license amend-ment to Facility Operating License No. NPF-3.

Yours very truly, C

LER:CRD.r Copy: Mr. James G. Keppler Regional Director, Region III 0

0\

TOLEDO, OHIO 43652

\ 9V THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE

~ ~

7901'O3023(