Pages that link to "SP-907A"
← SP-907A
Jump to navigation
Jump to search
The following pages link to SP-907A:
Displayed 20 items.
- 05000302/LER-2004-002 (← links)
- ML093270145 (← links)
- IR 05000302/2009004 (← links)
- ML092890642 (← links)
- IR 05000302/2008003 (← links)
- IR 05000302/2007002 (← links)
- IR 05000302/2003003 (← links)
- ML20137T046 (← links)
- ML20138J409 (← links)
- ML20138G315 (← links)
- ML20129H731 (← links)
- ML20126F215 (← links)
- ML20199G686 (← links)
- 3F0897-22, Application for Amend to License DPR-72,TS Change Request Notice 215,extending Frequency of EDG Surveillances During Period of Time CR-3 EDGs Are Being Modified (← links)
- 3F0193-07, Responds to NRC Re Violations Noted in Insp Rept 50-302/92-27.Corrective Actions:Applicable Procedural Guidance Will Be Improved by Providing Addl Barriers to Preclude Incorrect Valve Manipulation (← links)
- 3F0495-17, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-07.Corrective Actions:Counselled Maint Crew Members Conducting Procedure Re Event (← links)
- 3F0195-08, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/94-25.Corrective Actions:On 941114,upper Door to Control Complex Was Found Blocked Open W/No Temporary Seal & W/No Communications Established W/Cr (← links)
- ML20210T576 (← links)
- 05000302/LER-1995-002, :on 950207,EDG Lops Signal Generated,Stripping Emergency Safeguards Bus a & Opening & Locking Out Supply Breaker (Brkr 3211).Caused by Personnel Error.Shop Personnel Counseled & Event Reviewed (← links)
- 05000302/LER-1994-008, :on 941011,inattention to Detail Caused Incompleted Surveillance Test within Designated Time Period & Resulted in Violation of Ts.Conducted Presentation on Attention to Detail,Communication & Teamwork (← links)