- PNO-I-96-085, on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference (← links)
- PNO-I-97-014, on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl (← links)
- PNO-I-96-080, on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination (← links)
- PNO-I-80-041, on 800313,radiological Surveys of Site Grounds Uncovered Three Small Patches of Contaminated Soil Outside Controlled Area.Approx Three Tablespoons Soil Removed.Survey Continuing to Determine If Other Areas Contaminated (← links)
- PNO-I-86-021, on 860226,fuel Element Dropped 3 Ft After Being Lifted W/Upper Guide Structure Out of Reactor Vessel for Refueling.Insp in Progress.Recovery Will Be Attempted on 860227 (← links)
- ML20151Y350 (← links)
- PNO-I-97-049, on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated (← links)
- PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations (← links)
- PNO-I-86-050, on 860711,plant Shut Down Due to Repairs on Charging Pump a Not Completed within 72 H Limit.Delay Caused by Galling of Rotating Element Locking Nut.Further Delays Expected Due to Tube Cracking Problems (← links)
- PNO-I-86-055, on 860723,worker Accumulated High Quarterly Radiation Exposure While Changing Video Camera Position for Witnessing Hydrostatic Test in Steam Generator.Caused by Health Physics Technician Monitoring Error (← links)
- ML20249A021 (← links)
- ML20248L292 (← links)
- ML20248J903 (← links)
- ML20248H944 (← links)
- ML20248H781 (← links)
- PNO-I-89-078, notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan (← links)
- PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee (← links)
- ML20236P504 (← links)
- PNO-I-89-013, on 890224,licensee Identified Unmonitored Release Path from Uncontrolled Spent Fuel Bldg Drain Through Switchyard Drain Sys.Caused by Radwaste Water Being Erroneously Discharged Into Floor Drain.Drain Plugged (← links)
- PNO-I-87-056, on 870620,security Guard Found in Possession of half-smoked Marijuana Cigarette.Guard Escorted Offsite & & Site Access Terminated.State of CN Police Notified. Addl Drug Screening of Personnel Under Consideration (← links)
- PNO-I-86-096, on 861130,reactor Tripped from Full Power Due to Low Water Level & Steam/Feed Mismatch in Steam Generator 3.Caused by Technician Shorting Out Control Power.Cracked Check Valve Replaced (← links)
- PNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting (← links)
- PNO-I-86-050A, on 860715,plant Taken to Cold Shutdown. Preparations for Tube Plugging of Approx 70 Steam Generator Tubes w/50% or Greater through-wall Indications in Top Inch of Rolled Area of Tubes Continuing (← links)
- PNO-I-97-073A, on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites (← links)
- PNO-I-97-073, survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 971130 (← links)