Pages that link to "ML20216K097"
Jump to navigation
Jump to search
The following pages link to ML20216K097:
Displayed 13 items.
- PNO-III-86-012, on 860211,unidentified Primary Sys Leakage Slightly Above Tech Spec Limit.Leakage Associated W/Leakage Past Valve Seats in Portions of Reactor Depressurization Sys.Maint Outage Planned for 860215 to Correct Leakage (← links)
- PNO-III-97-055, on 970611,decision to Permanently Shut Down Plant Three Yrs Before Expiration of Operating License in Yr 2000.Capacity of 67 Megawatts & Future Needed Improvements Would Be Too Expensive.State of Mi Will Be Informed (← links)
- PNO-III-97-012, on 970224,licensee Notified NRC Resident Inspector Ofc That Loose Radioactive Surface Contamination Spread Throughout Turbine Bldg,During Transfer of Radwaste Processing Filters from Temporary Storage Barrel (← links)
- PNO-III-96-064, on 961023,shutdown for Evaluation of Environ Qualification Data Made.Licensee Performed Preliminary Assessment of Effect of Higher than Anticipated Temp Profile on safety-related Electrical Equipment Located (← links)
- PNO-III-88-008, on 880207,rising Dirty Water Sump Levels Observed & Reactor Shut Down to Identify & Repair Source of Leak.Caused by Leakage from Recirculation Pump Seal HXs (← links)
- PNO-III-83-108, security Guards at Big Rock Point Voted to Authorize Strike & Could Walk Out as Early as 12:01 Am on 831102.Guards,members of United Plant Guard Workers of America,Voted on 831029 to Strike Employer,Burns Intl (← links)
- PNO-III-90-051, on 900718,licensee Began Controlled Shutdown to Repair Leak in Gland Seal on Main Turbine Exhaust Sys. Cause of Failure Under Investigation.State of Mi Notified (← links)
- PNO-III-94-039, on 940517,two Persons,Russian Visitor & Interpreter Were Killed in Traffic Accident Near Charlevoix,Mi.Cause of Accident Under Investigation (← links)
- PNO-III-92-044, on 920830,licensee Began to Shut Down Reactor Because of Unidentified Primary Cooling Sys Leak Greater than TS Limit of 1 Gpm.Licensee Investigating Cause of Leak & Plans to Replace Hx.Replacement Will Take 2 Days (← links)
- PNO-III-87-114, on 871120,licensee Elected to Shutdown from Full Power to Cold Shutdown Conditions to Perform Top Assembly Replacement of Reactor Depressurization Sys Valves Exhibiting Excessive Polot Valve Leakage Since 871114 (← links)
- PNO-III-87-086, on 870623,licensee Declared Alert When Smoke Was Discovered in Outside Containment Cable Penetration Area.Although Outside Assistance Was Not Required,Fire Dept Was Placed on Standby During Event (← links)
- PNO-III-89-015, on 890224,senior Reactor Operator Site Access Suspended After Urine Test Showed Evidence of Marijuana. Licensee Reviewing Individual Work Activities to Determine If Review of Prior Activities Warranted (← links)
- ML20216J905 (← links)