MONTHYEAR05000416/LER-1982-072, Forwards LER 82-072/01T-01982-10-0707 October 1982 Forwards LER 82-072/01T-0 AECM-82-490, Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl1982-10-18018 October 1982 Submits Addl Info Re Design & Testing of Automatic Depressurization Sys Air Sys,Including Response to NUREG-0737,Item II.K.3.28,air Sys Testing & Air Sys Makeup Provisions.Revision to FSAR Subsection 18.1.30.12 Encl AECM-82-510, Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed1982-10-26026 October 1982 Outlines Commitments Made During 821025 Telcon Re Design & Testing of Automatic Depressurization Air Sys.Integrated Leak Test on Sys Will Be Performed Every 18 Months. Justification for Interim Operation Listed AECM-82-528, Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage1982-11-0909 November 1982 Forwards Addl Info Re Instrument Air Quality,In Support of NRC Review of Util Response to NUREG-0737,Item II.K.3.28. Proposed Tech Specs & Design Details Will Be Provided 4 Months Prior to Startup Following First Refueling Outage ML20070H2091982-12-20020 December 1982 Discusses Util Responses to Recently Discussed Unresolved NRC Concerns Re Automatic Depressurization Sys Air Sys AECM-83-0179, Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 211983-03-15015 March 1983 Interim Deficiency Rept Re Installation of Noncorrosion Resistant Matl for Instrument Air Pipe Penetrations. Initially Reported on 830315.Design Change Will Be Implemented.Also Reported Per Part 21 AECM-82-581, Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated Surveillance1983-10-0707 October 1983 Confirms Installation of Mechanical Pressure Gauge on Automatic Depressurization Sys Air Makeup Line & Performance of Associated Surveillance AECM-83-0672, Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated1983-10-24024 October 1983 Provides Addl Info Re Qualification of Automatic Depressurization Sys (ADS) Accumulator & Related Air Sys,In Response to .Ads Leak Test Frequency of 18 Months Anticipated AECM-83-0759, Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 8405311983-11-18018 November 1983 Final Part 21 Rept PRD-83/16 for Unit 1 & Interim Part 21 Rept for Unit 2 Re Failure of Internal Coating of Automatic Depressurization Sys,Main Steam Safety Relief Valve & MSIV Accumulators.Final Rept Expected by 840531 AECM-85-0030, Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg1985-01-30030 January 1985 Forwards Addl Info Requested During 841206 Telcon Re Design & Operation of Automatic Depressurization Sys (ADS) Accumulators & Related Air sys.Long-term ADS Pneumatic Supply Makeup Connection Located in Auxiliary Bldg AECM-85-0245, Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A3161985-08-15015 August 1985 Responds to 850615 Request for Addl Info Re long-term Automatic Depressurization Sys Air Supply Makeup Connection, Per NUREG-0737,Item II.K.3.28.Access to Air Supply Connection Will Be Through Exterior Door 1A316 1983-10-24
[table view] |