Pages that link to "ML20082L244"
Jump to navigation
Jump to search
The following pages link to ML20082L244:
Displayed 17 items.
- ML20039C038 (← links)
- ML20087P713 (← links)
- ML20076K323 (← links)
- ML20073M288 (← links)
- ML20073M276 (← links)
- ML20073M245 (← links)
- ML20072Q703 (← links)
- TAC:49798 (← links)
- B11096, Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria (← links)
- B10944, Forwards Suppl to Reload Safety Analyses for Cycle 6 Operation. Cycle 6 Reload Design Does Not Result in Previously Acceptable Safety Limits for Any Incident to Be Exceeded.Startup Scheduled for 831230 (← links)
- A03323, Forwards Addl Info Re Methodology Utilized in Performing Safety Analysis Supporting Cycle 6 Operation,In Response to Question 400.5 in (← links)
- B10788, Discusses Re Proposed Revs to Tech Specs for Cycle 6 Reload.Current Tech Spec Limits Provide Acceptable Margin of Safety (← links)
- B10688, Application for Amend to License DPR-65,revising Tech Specs to Reflect Changes in Cycle 6 Reload Operating Characteristics (← links)
- ML20149E021 (← links)
- 05000336/LER-1983-007-01, /01T-0:on 830318,nonconservative Safety Analysis Assumption Discovered in Steam Generator Tube Rupture Analysis.Caused by Failure of Analysis to Consider Impact of Automatic Valves.Analyses Will Be Docketed Shortly (← links)
- B10353, Application to Amend License DPR-65 Incorporating Revisions to Tech Specs to Support Cycle 5.Completion of Revisions & Reanalysis Required for Item II.K.3.30 of NUREG-0737 Scheduled for 820701 (← links)
- A03413, Submits Addl Info Re Steam Generator Tube Rupture Event Analyzed in Support of Cycle 6 Operation,Per 830725 Request. Current Steam Generator Tube Rupture Analysis Adequate to Support Cycle 6 Operation (← links)