Pages that link to "ML20054F221"
Jump to navigation
Jump to search
The following pages link to ML20054F221:
Displayed 23 items.
- ML20054C168 (← links)
- ML20049J152 (← links)
- ML20041C396 (← links)
- ML20040C965 (← links)
- ML20040A557 (← links)
- ML20040A554 (← links)
- ML20040A550 (← links)
- ML20072H501 (← links)
- B10724, Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp (← links)
- B10712, Application for Amend to License DPR-65,changing Tech Spec 3.4.6.2.b to Extend Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit (← links)
- B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage (← links)
- B10672, Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 Listed (← links)
- A02357, Ro:On 820629,primary to Secondary Leakage Rate Increased. Caused by Erosion & Thermal Cycling.Prompt Corrective Action Initiated for Leakage in Excess of 0.5 Gpm Per Steam Generator (← links)
- ML20069F712 (← links)
- B10448, Application for Amend to License DPR-65,providing Daily Sampling for Gross Activity in Each Steam Generator During Cycle 5 Operation to Assure Prompt Detection & Monitoring of Primary to Secondary Leakage (← links)
- ML20042C042 (← links)
- ML20042C038 (← links)
- ML20042C036 (← links)
- B10425, Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes (← links)
- ML20041B610 (← links)
- B10420, Forwards Addl Info Supporting Amend to Ol,To Limit Steam Generator Inservice Insps During Cycle 5 Refueling Outage (← links)
- B10384, Forwards Addl Info in Support of Util 820112 Application to Amend OL to Limit Steam Generator Tube Inservice Insps Conducted During Cycle 5 Refueling Outage.Revised Tube Maps of Defects Found During Eddy Current Exams Encl (← links)
- B10408, Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 820212 (← links)