Pages that link to "ML18066A258"
Jump to navigation
Jump to search
The following pages link to ML18066A258:
Displayed 27 items.
- IR 05000409/2005006 (← links)
- ML18068A474 (← links)
- ML18067A689 (← links)
- ML18067A593 (← links)
- PNO-III-97-008, on 970205,radioactive Waste Handler Fell Off Ladder About 12 Feet Into Area Called Cask Washdown Pit,Used for Decontamination of Large Items.Individual Surveyed Upon Arrival at Hosp & No Contamination Found on Individual Skin (← links)
- PNO-III-97-081, on 970929,licensee Commenced Orderly Shutdown Due to Increased Unidentified Primary Coolant Sys Leakage. Source of Leak Determined to Be Cracked Weld on bleed-off Line for Pump Seal of Primary Coolant Pump (← links)
- ML18065B127 (← links)
- PNO-III-96-003, on 960116,2,400 Volt Power Sys Automatically Transferred from Normal Source to Backup Power Source. Licensee Commenced Plant Shutdown on 960117 & Plans to Make Repairs to Power Cable (← links)
- PNO-III-95-045, on 950825,contract Valve Technician Injured While Troubleshooting Valve Problem in Moisture Separator Reheater Sys in Turbine Bldg.Worker Taken by Ambulance to Hosp for Treatment (← links)
- PNO-III-94-057, on 940802,util Announced Plan to Unload Sf Storage Cask Due to Minor Defects in Welding Indentified During Review of Radiographs.State of Mi Informed (← links)
- PNO-III-89-052, on 890808,FBI Notified Plant of Bomb Threat Received Against Unspecified Nuclear Plant in State of Mi. Grand Rapids,Mi Police Apprehended Suspect Who Admitted Making Threat (← links)
- PNO-III-88-101, on 881207,util & Bechtel Announced Signing of Agreements for Jointly Owned Company to Acquire Facility & to Resolve Outstanding Claims Associated W/Midland Nuclear Plant Const Project.State of Mi Will Be Informed (← links)
- PNO-III-88-097, on 881205,tube Leak Identified in Steam Generator B.Unit Shut Down.Outage Planned to Repair Leak & Perform Other Maint,Including Replacement of Primary Coolant Pump Seal & Repair of Primary Safety Valve Leak (← links)
- PNO-III-88-070, on 880808,disparity Developed Between Chemistry Analyses & Radiation Monitor Estimates of Leak Rate.Faulty Sample Apparatus Identified & Repaired.Refueling Outage Scheduled for 880903 (← links)
- PNO-III-88-043, on 880427,control Rod Assembly Dropped from Full Out Position to Full in Position.Caused by Possible Problem W/Control Rod Clutch Assembly.On 880428,reactor Protection Sys Clutch Power Supply Trip Breakers Failed (← links)
- PNO-III-81-063, on 810711,plant Was Shut Down for Approx 10 Days to Replace Shaft Seals on Reactor Coolant Pumps & Five Control Rod Drive Mechanisms Seals.Caused by Deteriorating Second Stage Reactor Coolant Pump Shaft Seal (← links)
- PNO-III-81-059, on 810626,during Testing,Both Sequencers Failed to Cycle Properly & One Emergency Generator Failed to Pick Up & Load.Oxidation of Left Sequencer Contacts Cleaned.Governor Potentiometer Motor Replaced on Generator (← links)
- PNO-III-80-184, on 801009,reactor Tripped from 97% Power. Caused by Loss of Load Trip on Main Generator Due to Maint Work in Switchyard.Control Cables Inadvertently Severed Resulting in Faulty Protective Signal (← links)
- PNO-III-80-197, on 801023,unplanned Gaseous Release Occurred While Sluicing Fuel Pool Demineralizer Resins to Spent Resin Storage Tank.Caused by Overpressurization of Dirty Equipment Drain Tank (← links)
- PNO-III-80-100, on 800524,plant Achieved Criticality After Shutdown of More than Eight Months.During Shutdown,Extensive Const & Mod Work Was Completed Including TMI Mods,Seismic Restraint Mods & Replacement of Boric Acid Heat Tracing (← links)
- PNO-III-80-150, on 800812,unplanned Gaseous Release of 2 to 4 Minutes Occurred While Transferring Quench Tank Cover Gas to Gaseous Waste Holdup Sys.Release Was within Tech Spec Limits.Licensee Is Investigating Source of Release (← links)
- PNO-III-80-155, on 800819,licensee Reported That Surveillance Test Had Been Performed During Power Operation Which Should Have Been Performed Only While in Cold Shutdown (← links)
- PNO-III-80-162, on 800831,labor Contract Expires.Negotiations for New Contract Are Continuing.Possibility Exists That Strike Might Be Called 800901 or Later.Strike Would Involve Operations,Maint & Const Personnel (← links)
- PNO-III-80-159, on 800826,while Operating at 88% Power,Plant Was Manually Tripped Because of Loss of Condensate & Feedwater Pumps.Recovery Took 2.5-h to Regain Onscale Readings of Steam Generator Levels (← links)
- PNO-III-80-175, on 800912,wildcat Strike Was Initiated. Pickets at Main Gate Are Being Honored by Operations, Maint & Const Personnel.Plant Will Continue to Operate Staffed by Mgt Personnel (← links)
- PNO-III-80-140A, licensee Analysis Indicates That All ECCS Pumps on Affected Line Would Have Been Subj to Air Binding Because Containment Sump Valve Cv 3030 Had Been Improperly Positioned to Open Position (← links)
- PNO-III-80-128, on 800702,weld in Generator Seal Oil Filter Failed Causing Gross Leak of Oil Into Turbine Bldg.Turbine Generator Manually Tripped Causing Reactor Trip.Safety Sys Appeared to Have Functioned W/O Challenge to Emergency Sys (← links)