Pages that link to "L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control"
Jump to navigation
Jump to search
The following pages link to L-2019-164, Response to Request for Additional Information Regarding License Amendment Request to Relocate the MOV Thermal Overload Protection Bypass Devices Requirements to Licensee Control:
Displayed 50 items.
- ML15356A185 (← links)
- ML15356A184 (← links)
- ML15219A184 (← links)
- ML18114A120 (← links)
- ML18110A141 (← links)
- ML18108A607 (← links)
- ML18098A070 (← links)
- ML18127B128 (← links)
- ML18127A500 (← links)
- L-2015-259, ANP-3440NP, Revision 1, Response to NRC Questions SRXB-RAI-1 and Snpb RAI-2 Thru Snpb RAI-20. (← links)
- L-2018-205, Response to Request for Additional Information Regarding License Amendment Request to Reduce the Number of Control Element Assemblies (← links)
- L-77-245, Letter Forwarding Additional Information Regarding Neutron Shielding in the Reactor Vessel Cavity (← links)
- L-76-326, Response to Letter of 8/13/1976 to Evaluate Reactor Coolant System Design and Provide Certain Information Regarding Susceptibility to Overpressurization Events, FP&L Will Report the Results by 10/15/1976 (← links)
- L-76-381, Response to Request of 9/30/1976 for Information on Operating Experience with Loose-Parts and Loose-Parts Monitoring System (← links)
- L-76-416, Response to Letter of 11/5/1976, Forwards Requested Additional Appendix I Information (← links)
- L-77-111, 04/08/1977 Response to Request for Additional Information Steam Generator Operating History (← links)
- L-78-175, Forwards Responses to Questions from NRC Regarding Cycle 2 Reload Safety Evaluation (← links)
- L-78-180, Response to Nrc'S 5/17/1978 Letter, Fp&L'S Commitment to Complete Testing Concerning Resistance Temperature Detector Response Times by 12/1/1978 (← links)
- L-78-177, Response to Letter of 5/8/1978 Requesting Certain Information to Complete Review of Application to Restart St. Lucie Unit 1 Following Refueling. FP&L Will Provide Schedule to Responses by 6/8/1978 (← links)
- L-78-199, Forwards Response to Two Staff Positions on Diesel Generator Lockout Enclosed in 5/8/1978 Letter (← links)
- L-78-207, Forwards Diesel Generator Information in Response to 12/15/1977 Letter (← links)
- L-76-361, Forwards Reactor Vessel Overpressurization Issue Progress Report (← links)
- L-75-600, Response to 11/26/75 Letter Furnishing Information on Reactor Vessel Support Program (← links)
- L-75-371, Letter Responding to the June 27, 1975 Letter Requesting Additional Information Concerning Stalled Hurricanes and Advising That It Will Not Be Possible to Submit the Information Before August 8, 1975 (← links)
- L-2017-159, Response to Request for Additional Information Regarding Inservice Inspection Plan, Fifth Ten-Year Interval Unit 1 Relief Request No. 3, Revision 0 (← links)
- L-2016-220, License Amendment Request EDG Day Tank Fuel Volume Change (← links)
- L-2016-096, Inservice Inspection Plan, RAI Reply for Fourth Ten-Year Interval Relief Request No. 10, Revision 0 (← links)
- NL-16-014, Response to Request for Additional Information Regarding IP2-ISI-RR-19 for Relief from System Test Requirements for Large Bore(≫ 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (Rcpb), Process, Drain, Test, And.. (← links)
- L-2015-279, RAI Response Clarification for SRXB-RAI-1 and Snpb RAI-2 Thru RAI-20 for the Technical Specification LAR and Exemption Request Regarding the Transitioning to Areva Fuel (← links)
- L-2015-270, Request for Additional Information Reply Fourth Ten-Year Inservice Inspection Interval License Amendment Request Changes to Snubber Surveillance Requirements (← links)
- L-2015-258, Request for Additional Reply for License Renewal Condensate Storage Tank Cross-Connect Buried Piping Inspection Commitment (← links)
- L-2015-179, Response to Request for Additional Information Regarding the Spring 2014 Steam Generator Tube Inspections (← links)
- L-77-291, Attachment a to L-77-291 Response to NRC Questions of May 24, 1977 (← links)
- L-2019-056, Inservice Inspection Plan RAI Reply, Fifth Ten-Year Interval Unit 1 Relief Request (← links)
- L-2018-153, Supplemental Information for License Amendment Request to Reduce the Number of Control Element Assemblies (← links)
- L-2018-040, Response to Request for Additional Information Regarding License Amendment Request to Add New Required Actions for an Inoperable Auxiliary Feedwater Pump Steam Supply (← links)
- L-2018-006, Third Response to Request for Additional Information Regarding License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 1, Provide Risk-Risk Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- L-2017-210, Updated Final Response to NRC Generic Letter 2004-02 (← links)
- L-2017-209, Response to Request for Additional Information Regarding Fifth 10-Year Inservice Testing (IST) Program Interval Relief Request PR-01 (← links)
- L-17-222, (NEI) 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- L-2017-116, Response to Request for Additional Information Regarding License Amendment Request to Revise the Technical Specifications (TS) for the Reactor Protection System (RPS) Power Rate-of-Change Instrumentation and Add New TS 3.0.5 (← links)
- L-2016-153, Response to Request for Additional Information Regarding License Amendment Request for Biological Opinion License Changes (← links)
- L-2016-135, Second Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B (← links)
- L-2016-143, Response to Request for Additional Information for the Proposed Technical Specification Change to Remove the 10 Year Sediment Cleaning of the Fuel Oil Storage Tank and Relocate to Licensee-Controlled Documents (← links)
- L-2016-114, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-505, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 48. (← links)
- L-2016-104, RAI Reply - Application for Technical Specification Change Regarding Moderator Temperature Coefficient (Mtc) Surveillance Test Elimination at the End of Cycle (← links)
- L-2016-102, RAI Reply - License Amendment Request, Containment Vacuum Gothic Analyses and Conforming Changes (← links)
- L-2016-084, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-422, Revision 2, Change in Technical Specifications End States. (← links)
- L-2016-018, Response to Request for Additional Information Fourth Ten-Year Inservice Inspection Interval License - Amendment Request Changes to Snubber Surveillance Requirements (← links)
- L-2015-304, RAI Reply for the Application for Technical Specifications Changes to Remove Communications and Manipulator Crane Requirements and Relocate to Licensee-Controlled Documents (← links)