Pages that link to "CP-86-22"
← CP-86-22
Jump to navigation
Jump to search
The following pages link to CP-86-22:
Displayed 13 items.
- ML20149N065 (← links)
- ML20207C553 (← links)
- ML20236H464 (← links)
- ML20215D795 (← links)
- ML20211J452 (← links)
- TXX-6865, Interim Deficiency Rept CP-86-22 Re Safeguards Area Fan Coolers.Initially Reported on 870708.Evaluation of Startup Test Procedure & Review Matrix Identifying Contractors to Review Procedures Completed.Next Rept No Later than 880422 (← links)
- TXX-6551, Interim Deficiency Rept CP-86-22 Re Capacity of Fan Cooler Design in Safeguards Area to Adequately Handle Heat Load in Several Rooms.Initially Reported on 860402.Project Procedures Under Evaluation.Next Rept Expected by 871021 (← links)
- TXX-6459, Interim Deficiency Rept CP-86-22 Re Capacity of Present Fan Cooler Design in Safeguards Area to Adequately Handle Heat Load in Several Rooms.Initially Reported on 860402. Evaluation Continuing.Next Rept Expected by 870708 (← links)
- TXX-6158, Interim Deficiency Rept CP-86-22 Re Capacity of Present Fan Cooler Design in Safeguards Area to Adequately Handle Heat Load.Initially Reported on 860402.Engineering Evaluation Determined That Fans Adequately Sized.Next Rept by 870520 (← links)
- TXX-5008, Interim Deficiency Rept CP-86-22 Re Adequacy of Safeguards Area Fan Coolers.Initially Reported on 860402.Ebasco Review of HVAC Design Will Include Resolution of Issue & Reportability Per 10CFR50.55(e).Next Rept by 861212 (← links)
- TXX-4780, Interim Significant Deficiency Rept CP-86-22 Re Adequacy of Fan Cooler Design in Safeguards Area.Initially Reported on 860402.Ebasco Svcs,Inc Performing Evaluation.Next Rept Will Be Submitted by 860714 (← links)
- TXX-4894, Interim Deficiency Rept CP-86-22 Re Incapacity of American Air Filter Fan Coolers to Handle Heat Load in Several Safeguards Area Rooms.Initially Reported on 860402. Evaluation Continuing.Next Rept by 860912 (← links)
- TXX-8844, Final & Supplemental Deficiency Rept CP-86-22 Re Capacity of Fan Cooler Design in Safeguards Area.Initially Reported on 870708.Chilled Water Rebalancing & Engineering Review of Startup Test Procedure Will Be Completed Before Refuel (← links)