Pages that link to "CH-MOV-292B"
Jump to navigation
Jump to search
The following pages link to CH-MOV-292B:
Displayed 11 items.
- ML20134E326 (← links)
- ML20127D748 (← links)
- ML20154S633 (← links)
- ML20206J999 (← links)
- IR 05000213/1989010 (← links)
- B12219, Requests Extension of 860428 Single Failure Exemption to Respond to Small Break Locas.Plant Mods Cannot Be Completed Until End of Cycle 15 Outage.Probabilistic Safety Study for Permanent Small Break LOCA Response Measures Encl.Fee Paid (← links)
- B12343, Forwards Rev 2 to Environ Qualification Electrical Equipment Master List.Changes Made Based on Equipment Replacement & Clarification of Equipment/Component Certification Data (← links)
- B12382, Forwards Addl Info Supporting 861217 Proposed Amend to License DPR-61,revising Tech Specs to Permit Repositioning & Blocking of Flow Control Valve to Ensure Adequate Cooling in Event of Postulated Pipe Break in Core Deluge Piping (← links)
- B12476, Suppls 860930 & 1224 Requests for Extension of Single Failure Exemption.Description of Good Faith Efforts,Eccs Mods Resulting from Small & Medium LOCA Concerns & Single Failure Analysis of Core Deluge Piping Sys Encl (← links)
- B12022, Forwards Results of Equipment Qualification Reverification Walkdown Program,Per IE Info Notices 86-002 & 86-003. Discrepancies Will Be Corrected Prior to Startup from Current Outage (← links)
- B14366, Responds to NRC Re Violations Noted in Insp Rept 50-213/92-81.Corrective Actions:Licensee Issued MOV Program Manual on 921218 That Provides Specific Guidance Re Testing of MOVs & Will Be Implemented Through Individual Projects (← links)