Category:ANNUAL OPERATING REPORT
MONTHYEARML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20205R3531999-04-30030 April 1999 Addendum 4 to Annual Rept, CY-99-027, Annual Rept for 10CFR50.59, for Jan-Dec 1998.With1998-12-31031 December 1998 Annual Rept for 10CFR50.59, for Jan-Dec 1998.With B17820, Annual Rept for Jan- Dec 1998. with1998-12-31031 December 1998 Annual Rept for Jan- Dec 1998. with B17769, CFR50.59 Annual Rept for 980101-1231. with1998-12-31031 December 1998 CFR50.59 Annual Rept for 980101-1231. with B17685, Annual Rept. with1998-12-31031 December 1998 Annual Rept. with ML20196K2021998-12-31031 December 1998 10CFR50.59 Annual Rept for Period Jan-Dec 1998 ML20198B0871998-12-11011 December 1998 Addendum 2 to Mnps Unit 2 Annual Rept, ML20154P4061998-10-14014 October 1998 Addendum 1 to Millstone Nuclear Power Station,Unit 2,annual Rept ML20236S3171998-06-30030 June 1998 Addendum 6 to Millstone Unit 1 Annual Rept, ML20236L9161998-06-30030 June 1998 Addendum to Mnps,Unit 3 Annual Rept ML20217Q9041998-03-31031 March 1998 Addendum 5 to Mnps Unit 2 Annual Rept ML20217N5751998-03-31031 March 1998 Addendum 8 to Mnps Unit 3 Annual Rept, ML20216J9431998-02-28028 February 1998 Addendum 7 to Mnps,Unit 3 Annual Rept, B17082, Annual Rept Jan-Dec 19971997-12-31031 December 1997 Annual Rept Jan-Dec 1997 B17081, Annual Rept Jan-Dec 19971997-12-31031 December 1997 Annual Rept Jan-Dec 1997 CY-98-010, Annual Rept for 10CFR50.59,Jan-Dec,19971997-12-31031 December 1997 Annual Rept for 10CFR50.59,Jan-Dec,1997 B17243, CFR50.59 Annual Rept for 970101-12311997-12-31031 December 1997 CFR50.59 Annual Rept for 970101-1231 B17347, CFR50.59 Annual Rept for Jan-Dec 19971997-12-31031 December 1997 CFR50.59 Annual Rept for Jan-Dec 1997 ML20217P1211997-12-31031 December 1997 Annual Rept for Jan-Dec 1997 ML20236K1561997-12-31031 December 1997 CFR50.59 Annual Rept for Jan-Dec 1997 ML20202H2481997-11-21021 November 1997 Addendum 3 to Millstone Nuclear Power Station,Unit 2 Annual Rept ML20203H0331997-11-21021 November 1997 Addendum 5 to Mnps,Unit 3 Annual Rept ML20206N1311997-08-28028 August 1997 Addendum 3 to Millstone Nuclear Power Station Unit 3 Annual Rept, Including Changes Not Provided in B16240, Annual Repts for 10CFR50.59 PORV & SV Challenges Primary Coolant Specific Activity Analysis Occupational Radiation Exposure for 19961996-12-31031 December 1996 Annual Repts for 10CFR50.59 PORV & SV Challenges Primary Coolant Specific Activity Analysis Occupational Radiation Exposure for 1996 B16517, CFR50.59 Annual Rept,960101-12311996-12-31031 December 1996 CFR50.59 Annual Rept,960101-1231 B16293, Annual Rept Jan-Dec 19961996-12-31031 December 1996 Annual Rept Jan-Dec 1996 B16297, Annual Rept,Jan-Dec 19961996-12-31031 December 1996 Annual Rept,Jan-Dec 1996 B16270, Annual Operating Rept for 19961996-12-31031 December 1996 Annual Operating Rept for 1996 ML20115F7481995-12-31031 December 1995 Addendum to Mnps,Units 1,2 & 3 Annual Rept Millstone Unit 3 Section B15772, Addendum to Mnps,Units 1,2 & 3 Annual Rept for 1995 Millstone Unit 2 Section1995-12-31031 December 1995 Addendum to Mnps,Units 1,2 & 3 Annual Rept for 1995 Millstone Unit 2 Section B14392, & Millstone Station,Units 1,2 & 3 Annual Rept,Jan-Dec 19921992-12-31031 December 1992 & Millstone Station,Units 1,2 & 3 Annual Rept,Jan-Dec 1992 ML18094B3211990-02-28028 February 1990 Annual Operating Repts for 1989 for Salem & Hope Creek Generating Stations B13515, Annual Reporting of Changes to & Errors in ECCS Models or Applications for 881017-8912311989-12-31031 December 1989 Annual Reporting of Changes to & Errors in ECCS Models or Applications for 881017-891231 B13451, & Millstone Station Units 1,2 & 3 Annual Rept for 19891989-12-31031 December 1989 & Millstone Station Units 1,2 & 3 Annual Rept for 1989 B13145, & Millstone Station Units 1,2 & 3,Annual Rept for 19881988-12-31031 December 1988 & Millstone Station Units 1,2 & 3,Annual Rept for 1988 B12822, Annual Rept for 19871987-12-31031 December 1987 Annual Rept for 1987 ML20138C5521985-12-31031 December 1985 1985 Annual Rept ML20154S6331985-12-31031 December 1985 Units 1 & 2 Annual Rept,1985 ML20199F2111985-12-31031 December 1985 Suppl to 1985 Annual Rept ML20199F2241985-12-31031 December 1985 Suppl to 1985 Annual Rept L-84-224, Rept of Changes,Tests & Experiments Made W/O Prior Commission Approval,Jul 1983 - June 19841984-06-30030 June 1984 Rept of Changes,Tests & Experiments Made W/O Prior Commission Approval,Jul 1983 - June 1984 L-83-479, Annual Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval from Jul 1982 - June 19831983-06-30030 June 1983 Annual Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval from Jul 1982 - June 1983 ML20041F3041982-03-0101 March 1982 Annual Rept for Jan-Dec 1981 ML20003D7571981-03-0606 March 1981 Corrected Reg Guide 1.16 Repts for Annual Operating Rept, 1980, Originally Submitted on 810227 ML19341D4871981-02-27027 February 1981 Annual Rept, 1980 ML19341C4661981-02-18018 February 1981 Annual Operating Rept,1980 ML19323A8591980-04-28028 April 1980 Revised Review Sheet for Plant Design Change 320 to Annual Operating Rept of Facility Changes,Tests & Experiments, 1979 ML19309E8161980-04-0101 April 1980 Annual Rept of Changes,Tests & Experiments 1979 ML20050N8451977-10-24024 October 1977 Univ of Mo Research Reactor (MURR) Annual Rept,Jul 1979 - June 1980 1999-06-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P5391999-10-25025 October 1999 Rev 0,Change 1 to Millstone Unit 1 Northeast Utils QA Program ML20217K3301999-10-19019 October 1999 Safety Evaluation Supporting Amend 195 to License DPR-61 05000336/LER-1999-012, :on 990917,unrecoverable CEA Misalignment Entry Into TS 3.0.3 Was Noted.Caused by Grounded Coil Wire for Lower Gripper Assembly.Leads Leading to Lower Gripper Coil Were Insulated1999-10-15015 October 1999
- on 990917,unrecoverable CEA Misalignment Entry Into TS 3.0.3 Was Noted.Caused by Grounded Coil Wire for Lower Gripper Assembly.Leads Leading to Lower Gripper Coil Were Insulated
ML20217C8721999-10-0606 October 1999 Rev 21,change 3 to MP-02-OST-BAP01, Nuqap Topical Rept, App F & G Only B17898, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 3.With B17894, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 2.With B17896, Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With1999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Millstone Nuclear Power Station,Unit 1.With ML20216J4341999-09-24024 September 1999 Mnps Unit 3 ISI Summary Rept,Cycle 6 05000336/LER-1999-011, :on 990823,thermal Reactor Power Limit Was Exceeded.Caused by Lack of Conservatism in Procedures & Alarm Setpoints Used to Limit Reactor Power.Revised Operating Procedures1999-09-20020 September 1999
- on 990823,thermal Reactor Power Limit Was Exceeded.Caused by Lack of Conservatism in Procedures & Alarm Setpoints Used to Limit Reactor Power.Revised Operating Procedures
ML20212A7381999-09-10010 September 1999 Safety Evaluation Supporting Amend 174 to License NPF-49 05000245/LER-1999-001-02, :on 990810,discovered That Stack Flow Monitor Four H LCO Action Statement Had Not Been Met.Caused by Personnel Error.Frequency of LCO Action Was Increased & Personnel Involved Received Coaching.With1999-09-0808 September 1999
- on 990810,discovered That Stack Flow Monitor Four H LCO Action Statement Had Not Been Met.Caused by Personnel Error.Frequency of LCO Action Was Increased & Personnel Involved Received Coaching.With
05000336/LER-1999-010, :on 990804,noted Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve.Caused by Inadequate man-machine Interface. Planning Personnel Will Be Briefed on QC Program Indicators1999-09-0202 September 1999
- on 990804,noted Failure to Perform ASME Section XI IST on Pressurizer Relief Line Flow Control Sample Valve.Caused by Inadequate man-machine Interface. Planning Personnel Will Be Briefed on QC Program Indicators
ML20211N8401999-09-0202 September 1999 Rev 21,change 1 to Northeast Utils QA TR, Including Changes Incorporated Into Rev 20,changes 9 & 10 ML20216F5141999-08-31031 August 1999 Rept on Status of Public Petitions Under 10CFR2.206 B17879, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 2.With B17874, Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Millstone Nuclear Power Station,Unit 3.With B17878, Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With1999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Mnps,Unit 1.With ML20211G9631999-08-30030 August 1999 SER Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20210U0881999-08-13013 August 1999 Safety Evaluation Supporting Amends 239 & 173 to Licenses DPR-65 & NPF-49,respectively ML20210Q1401999-08-12012 August 1999 Safety Evaluation Supporting Amend 238 to License DPR-65 B17858, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 3.With B17856, Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With1999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 1.With ML20211A6561999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Millstone Nuclear Power Station,Unit 2 ML20210J0311999-07-21021 July 1999 Rev 20,Change 10 to QAP 1.0, Organization ML20210E5931999-07-19019 July 1999 Revised Page 16 of 21,to App F of Northeast Util QA Program Plan ML20210A0411999-07-15015 July 1999 Rev 20,change 10 to Northeast Util QA Program Tr ML20210C5911999-07-15015 July 1999 Revised Rev 20,change 10 to Northeast Util QA Program TR, Replacing Summary of Changes ML20209G3061999-07-13013 July 1999 Safety Evaluation Supporting Amend 237 to License DPR-65 B17814, Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start1999-07-12012 July 1999 Special Rept:On 990612 B Train EDG Failed to Restart within 5 Minutes Following Completion of 18 Month 24 H Endurance Run Required by TS 4.8.1.1.2.g.7.Caused by Procedural inadequacy.Re-performed Hot Restart Via Manual Start ML20209D6581999-07-0202 July 1999 Safety Evaluation Supporting Amend 172 to License NPF-49 ML20209D1881999-07-0101 July 1999 Rev 20,change 9 to Northeast Util QA Program Tr ML20209J0541999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Unit 2 B17833, Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Power Station,Unit 1.With B17830, Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With1999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 3.With ML20196J1821999-06-30030 June 1999 Rev 21,Change 0 to Northeast Utilities QAP (Nuqap) Tr ML20196J2191999-06-30030 June 1999 SER Concluding That Licensee USI A-46 Implementation Program,In General,Met Purpose & Intent of Criteria in GIP-2 & Staff Sser 2 for Resolution of USI A-46 ML20196K1791999-06-30030 June 1999 Addendum 6 to Millstone Unit 2 Annual Rept, ML20211A6751999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level & Operating Data Rept ML20196A8451999-06-30030 June 1999 Post Shutdown Decommissioning Activities Rept ML20196H1621999-06-29029 June 1999 Safety Evaluation Supporting Amend 236 to License DPR-65 05000423/LER-1999-007-01, :on 990518,discharge Filter Associated with Crss Cubicle Sump Pump 3DAS-8A,was Determined to Be Contaminated.Caused by Back Leakage from Contaminated Drains Feeding Into ECCS Pump.Lines Modified.With1999-06-17017 June 1999
- on 990518,discharge Filter Associated with Crss Cubicle Sump Pump 3DAS-8A,was Determined to Be Contaminated.Caused by Back Leakage from Contaminated Drains Feeding Into ECCS Pump.Lines Modified.With
05000423/LER-1999-006-01, :on 990516,both Reactor Plant Aerated Drains SR Air Driven Sump Pumps Failed During TRM Surveillance.Caused by Inadequate Preventive Maint Program Design.Surveillance Procedure Sp 3635B.2 Will Be Conducted Monthly1999-06-15015 June 1999
- on 990516,both Reactor Plant Aerated Drains SR Air Driven Sump Pumps Failed During TRM Surveillance.Caused by Inadequate Preventive Maint Program Design.Surveillance Procedure Sp 3635B.2 Will Be Conducted Monthly
05000423/LER-1999-004-01, :on 990516,ESFA of Numerous Plant Components on Restoration of a Train Sequencer Occurred.Caused by Inadequate Procedure Direction.Issued Brief to Operations Describing Inadvertent Sequencer LOP Event.With1999-06-14014 June 1999
- on 990516,ESFA of Numerous Plant Components on Restoration of a Train Sequencer Occurred.Caused by Inadequate Procedure Direction.Issued Brief to Operations Describing Inadvertent Sequencer LOP Event.With
ML20195H1011999-06-11011 June 1999 Rev 20,change 8 to Northeast Utilities QAP (Nuqap) TR 05000423/LER-1999-005-01, :on 990510,failure to Perform Surveillance on RCS Pressurizer Heater Penetration Breakers Was Noted.Caused by Lack of Mgt Support.Required Surveillance of Identified Ten Breakers Was Completed1999-06-0808 June 1999
- on 990510,failure to Perform Surveillance on RCS Pressurizer Heater Penetration Breakers Was Noted.Caused by Lack of Mgt Support.Required Surveillance of Identified Ten Breakers Was Completed
05000423/LER-1999-003-01, :on 990505,identified That 18 Month EDG Surveillance Test for LOP with ESF Start Did Not Initiate Test.Caused by Inadequate Understanding of Regulatory Guidance. a & B EDG Returned to Status.With1999-06-0404 June 1999
- on 990505,identified That 18 Month EDG Surveillance Test for LOP with ESF Start Did Not Initiate Test.Caused by Inadequate Understanding of Regulatory Guidance. a & B EDG Returned to Status.With
ML20207G6411999-06-0303 June 1999 Safety Evaluation Supporting Amends 105,235 & 171 to Licenses DPR-21,DPR-65 & NPF-49,respectively ML20209J0661999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Unit 2 ML20211A6631999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Millstone Nuclear Power Station,Unit 2,providing Revised Average Daily Unit Power Level,Operating Data Rept & Unit Shutdowns & Power Reductions ML20211B7351999-05-31031 May 1999 Cycle 7 Colr 1999-09-08
[Table view] |