Pages that link to "B & W Owners Group"
Jump to navigation
Jump to search
The following pages link to B & W Owners Group:
Displayed 50 items.
- ML12193A488 (← links)
- ML102780486 (← links)
- ML051580191 (← links)
- ML050210284 (← links)
- ML031550720 (← links)
- ML003683085 (← links)
- TSTF-06-08, Technical Specification Task Force Request for NRC Reconsideration of January 31, 2003 Letter Regarding Collection of Review Fees for Generic Standard Technical Specifications Improvements (← links)
- TSTF-05-14, Writer'S Guide for Plant-Specific Improved Technical Specifications, TSTF-GG-05-01 (← links)
- TSTF-05-22, Response to the Nrc'S August 15, 2005 and September 19, 2005 Letters Regarding Fee Exemption Requests for Traveler Reviews (← links)
- TSTF-05-13, Technical Specification Task Force (TSTF) Response to May 25, 2005 Notice of Opportunity to Comment on Model Safety Evaluation on Technical Specification Improvement Re Revision to the Completion Time in STS 3.6.1.3, Primary Containment I (← links)
- TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements. (← links)
- TSTF-11-22, Comment (2) of the TSTF on Notice of Opportunity for Public Comment on the Proposed Model Safety Evaluation for Plant Specific Adoption of Technical Specifications Task Force Traveler TSTF-505 (← links)
- TSTF-10-20, Response to NRC Request for Additional Information Regarding TSTF-432, Revision 0, Change in Technical Specifications End States (WCAP-16294). (← links)
- TSTF-10-18, Response to NRC Request for Additional Information on TSTF-508, Revision 1, Revise Control Room Habitability Actions to Address Lessons Learned from TSTF-448 Implementation (← links)
- TSTF-10-17, Response to NRC Comments and Submittal of Revision 2 of TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection (← links)
- TSTF-10-12, Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A) (← links)
- TSTF-10-14, Submittal of TSTF-513, Revision 3 and TSTF-514, Revision 2 (← links)
- TSTF-09-10, Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.5 (← links)
- TSTF-09-01, Transmittal of TSTF-515, Revision 0, Revise Post-Accident Monitoring Instrumentation Based on Reg. Guide 1.97, Rev. 4 and NEDO-33349. (← links)
- TSTF-08-17, Request for Fee Exemption for TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26. (← links)
- TSTF-06-19, TSTF-477, Revision 2, Add Action for Two Inoperable Control Room AC Subsystems (← links)
- TSTF-06-06, TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems. (← links)
- TSTF-06-02, TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation (← links)
- TSTF-06-05, TSTF-427, Revision 1, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability (← links)
- TSTF-04-08, TSTF-425, Revision 0, Relocate Surveillance Frequencies to Licensee Control. (← links)
- TSTF-04-15, TSTF-479, Revision 0, Changes to Reflect Revision of 10 CFR 50.55a. (← links)
- TSTF-05-19, TSTF-492, Rev. 0, Modify RHR - High Water Level Bases to Address Decay Heat Removal with Upper Internals Installed. (← links)
- TSTF-05-12, TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability. (← links)
- TSTF-05-06, TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities. (← links)
- TSTF-05-21, TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications. (← links)
- TSTF-05-20, TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 0 (← links)
- TSTF-05-15, TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046) (← links)
- TSTF-05-18, Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications. (← links)
- TSTF-05-08, Submittal and Request for Fee Waiver for Review of TSTF-485, Revision 0, Correct Example 1.4-1. (← links)
- TSTF-05-03, Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC Consideration (← links)
- TSTF-04-10, TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091) (← links)
- TSTF-04-09, TSTF-426, Revision 0, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c (← links)
- TSTF-04-11, TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems (← links)
- TSTF-03-07, Traveler - September 17, 2003, Transmitts TSTF-459, Eliminate RHR Shutdown Cooling System TSTF-460, Control Rod Scram Time Testing; TSTF-465, Addition of Time Performance Surveillance Requirement Note to Source Range Monitor (Srm). (← links)
- TSTF-03-02, Traveler - August 12, 2003 Transmits TSTF-423, Technical Specifications End States, NEDC-32988-A. (← links)
- ML052560447 (← links)
- ML051820209 (← links)
- ML051600236 (← links)
- ML051320232 (← links)
- ML050760281 (← links)
- ML050560034 (← links)
- ML050540438 (← links)
- ML050530168 (← links)
- ML050210131 (← links)
- ML050070159 (← links)