Pages that link to "46P-2B"
← 46P-2B
Jump to navigation
Jump to search
The following pages link to 46P-2B:
Displayed 41 items.
- ENS 49982 (← links)
- 05000333/LER-2014-001 (← links)
- IR 05000333/2013007 (← links)
- ML17219A123 (← links)
- ML16085A249 (← links)
- ML16081A201 (← links)
- ML15007A150 (← links)
- ML122750409 (← links)
- ML122710026 (← links)
- ML12116A290 (← links)
- ML12072A351 (← links)
- ML18044A993 (← links)
- ML101750146 (← links)
- ML101750137 (← links)
- ML101740486 (← links)
- ML101740446 (← links)
- ML091550723 (← links)
- ML091550348 (← links)
- ML081370267 (← links)
- ML072910422 (← links)
- ML062160557 (← links)
- JAFP-07-0092, Response to Request for Additional Information Regarding Proposed Relief Requests for the James A. FitzPatrick Nuclear Power Plant Fourth Interval In-Service Testing Program (← links)
- JAFP-07-0050, Proposed Relief Requests for the James A. FitzPatrick Power Plant Fourth Interval In-Service Testing Program (← links)
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- JAFP-15-0047, 2015 Updated Final Safety Analysis Report, Technical Specification Bases and Technical Requirements Manual Changes Transmittal (← links)
- JAFP-09-0072, Response to Request for Additional Information Regarding: Emergency License Amendment Request Application for Technical Specification 3.8.1 Required Action B.4 Completion Time (← links)
- JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves (← links)
- ML20045E885 (← links)
- ML20045D095 (← links)
- ML032461261 (← links)
- ML032390350 (← links)
- JPN-02-001, Submittal of James A. FitzPatrick Owner'S Activity Report, JAF-RPT-MULTI-04331, Rev. 0 Which Contains Inservice Inspection Results & Repair/Replacement Activities Performed During 1st Period of Third 10-Year ISI Interval (← links)
- ML20069L017 (← links)
- ML20097J669 (← links)
- ML20094J242 (← links)
- ML20195K421 (← links)
- ML20155E783 (← links)
- ML20202J089 (← links)
- JPN-88-036, Responds to NRC Bulletin 88-004, Potential Safety-Related Pump Loss. Summary Rept of Review of safety-related Sys Encl.Commits to Submitting Detailed Calculations for RHR Pumps by 881028 & for Sizing of Min Lines by 890128 (← links)
- JPN-92-071, Forwards Section 8, Safe Shutdown Scenario & Timetable, Inadvertently Omitted from Rept, Safe Shutdown Capability Reassessment,10CFR50,App R,Sept 1992. Personnel on engineering-on-shift Position Trained to Be STA (← links)
- JPN-90-055, Forwards Comments on Installation of Hardened Wetwell Vent at Plant,Per 891027 Response to Generic Ltr 89-16.Concludes That Hardened Vent Not Cost Beneficial & Consideration of Mods Be Deferred Until Individual Plant Evaluation Complete (← links)