Pages that link to "3F1288-02, Requests That Comment Period Be Extended from 60 Days to 120 Days on Proposed Rule 10CFR50 Re Maint in Nuclear Power Plants"
Jump to navigation
Jump to search
The following pages link to 3F1288-02, Requests That Comment Period Be Extended from 60 Days to 120 Days on Proposed Rule 10CFR50 Re Maint in Nuclear Power Plants:
Displayed 21 items.
- ML19324B870 (← links)
- ML20024H428 (← links)
- ML20056G983 (← links)
- ML20064G149 (← links)
- ML20067C149 (← links)
- ML20083N461 (← links)
- ML20077M679 (← links)
- ML20098B280 (← links)
- ML20094E114 (← links)
- ML20091S053 (← links)
- ML20196D332 (redirect page) (← links)
- ML20199E082 (← links)
- ML20204G652 (← links)
- 3F1287-24, Comment on Proposed Rules 10CFR4,11,25,30,31,32,34,35,40,50, 60,61,70,71,73,74,75,95 & 110 Re Retention Period for Records.Formal Tech Spec Amends Should Not Be Required to Implement Changes & No 10CFR170 Fees Should Be Incurred (← links)
- 3F0289-18, Comment on Proposed Rule 10CFR50 Re Ensuring Effectiveness of Maint Programs for Nuclear Power Plants.Industry Actions in Maint Area Effective W/Continuing Improvement Across Industry.Balance of Plant Equipment Inappropriate (← links)
- 3F1298-06, Comment Supporting Proposed Rule 10CFR50.65 Re Monitoring Effectiveness of Maint at Npps.Expresses Concern Re Absence of Definition of risk-significant Configurations & Unacceptable Level for Safety Function Degradation (← links)
- 3F1288-02 (redirect page) (← links)
- 3F1098-09, Comment Re Integrated Review of Assessment Process for Commercial Npps.Recommends That Assessment Process Be Reviewed with Consideration of Enforcement Process,Insp Process & Reporting Process (← links)
- 3F0492-15, Comment Concurring W/Comments Offered by NUMARC on Sections 7 & 8 of Draft NUREG-1449, Shutdown & Low-Power Operation at Commercial Nuclear Power Plants in Us. Urges NRC to Consider Comments Carefully (← links)
- NL-95-0061, Comment on Draft GL Re Testing of safety-related Circuits. Util Primary Concern W/Requested Actions of Proposed GL Is Schedule (← links)
- NL-95-0053, Comment on Review of NRC Insp Rept Content,Format & Style. Insp Repts Frequently Not Appropriately Focused on Safety Issues (← links)