Pages that link to "2VCC-2B"
← 2VCC-2B
Jump to navigation
Jump to search
The following pages link to 2VCC-2B:
Displayed 15 items.
- IR 05000313/2012005 (← links)
- IR 05000313/2004004 (← links)
- ML12265A191 (← links)
- 2CAN111201, Arkansas, Unit 2, Attachment 1 - Engineering Report CALC-ANO2-CS-12-00001, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, and Attach. 2, List of Regulatory Commitments, Cover (← links)
- 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) (← links)
- 2CAN030502, Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 (← links)
- ML20003E761 (← links)
- 2CAN010403, (Ano), Unit 2 - Inservice Inspection (ISI) Summary Report (← links)
- ML20217N864 (← links)
- ML20217E967 (← links)
- 2CAN109801, Forwards Addl Info in Support of risk-informed Inservice Insp Pilot Application Submitted in Licensee 970930 & s.Pilot Plant Application Is to Be Used as Alternative, Per 10CFR50.55(a)(3)(i),to Certain ASME Requirements (← links)
- 0CAN109205, Responds to Generic Ltr 89-13, Svc Water Problems Affecting Safety-Related Equipment for Arkansas Nuclear One,Units 1 & 2.Provides Program for Initial & Reset Methods of Frequencies of Svc Water HXs (← links)
- 2CAN028402, Notifies of 840120 Svc Water Leak in Containment Cooling Coil 2VCC-2B,identified During IE Bulletin 80-24 Insp. Leakage to Containment Sump Indicated Approx 0.3 Gpm.Blanks Installed to Isolate Leaking Coils (← links)
- 05000368/LER-1989-026-01, :on 891112,gaps in Piping Supports on Supply & Return Piping for Containment Coolers Identified.Caused by Inadequate Design Technique Used in Original Support Design. Shims Added Before Restart from Outage (← links)
- 0CAN058114, Responds to IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). No Evidence of Plugging or Fouling by Corbicula Found (← links)