Pages that link to "2E-24A"
← 2E-24A
Jump to navigation
Jump to search
The following pages link to 2E-24A:
Displayed 37 items.
- IR 05000313/2017007 (← links)
- ML15265A313 (← links)
- ML15264A681 (← links)
- ML14237A215 (← links)
- ML12342A052 (← links)
- ML12269A491 (← links)
- 2CAN111201, Arkansas, Unit 2, Attachment 1 - Engineering Report CALC-ANO2-CS-12-00001, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, and Attach. 2, List of Regulatory Commitments, Cover (← links)
- 1CAN091703, Inservice Inspection, Pressure Test and Containment Inservice Inspection Program Plans for the Fifth 10-Year Interval (← links)
- 2CAN081406, Inservice Inspection Summary Report for the Twenty-Third Refueling Outage (2R23) (← links)
- 2CAN120901, Inservice Inspection Summary Report for the Twentieth Refueling Outage (2R20) (← links)
- ML17080A187 (← links)
- 2CAN070501, Inservice Inspection (ISI) Summary Report (← links)
- 2CAN030502, Inservice Inspection (ISI) Summary Report Arkansas Nuclear One - Unit 2 Docket No. 50-368 License No. NPF-6 (← links)
- ML20012G444 (← links)
- ML20052B748 (← links)
- ML20045C349 (← links)
- ML20070G861 (← links)
- ML20117K170 (← links)
- ENS 55028 (← links)
- 2CAN112005, Unit 2 - Inservice Testing Plan for the Fifth 10-Year Interval (← links)
- ML20246F950 (← links)
- ML20217F092 (← links)
- ML20217F007 (← links)
- ML20217E967 (← links)
- ML20217E929 (← links)
- 2CAN088913, Forwards Complete Results of Steam Generator Tubing Inservice Insp Conducted During Period of 880216-22.All Eddy Current Insp Data Analyzed by Independent Group in Parallel W/Inservice Insp Contractor (← links)
- 2CAN109801, Forwards Addl Info in Support of risk-informed Inservice Insp Pilot Application Submitted in Licensee 970930 & s.Pilot Plant Application Is to Be Used as Alternative, Per 10CFR50.55(a)(3)(i),to Certain ASME Requirements (← links)
- 2CAN109205, Forwards Rept of Number of Plugged or Sleeved SG Tubes Accomplished During Inservice Insps on 921002.Complete Results of SG Tube Inservice Insp Will Be Provided in Annual Rept by 930301 (← links)
- 0CAN099208, Application for Amends to Licenses DRP-51 & NPF-6,changing TS to Add LCO & SR for Main Steam Line Radiation Monitors, Per GL 83-37 (← links)
- 2CAN059202, Advises That 29 Tubes Were Plugged & 392 Tubes Were Sleeved in 2E-24A Sg.In 2E-24B,11 Tubes Were Plugged & 56 Tubes Were Sleeved.Subj Tubes Plugged or Sleeved During Forced Outage. Tables Re Tubes That Were Plugged/Sleeved Encl (← links)
- 2CAN109104, Forwards Annual Rept of Steam Generator Tube Insps for 1991. No Defective Tubes & Less than 5% of Total Tubes Inspected in Steam Generator a Exhibited Any Degradation (← links)
- 2CAN029503, Provides 1994 Annual Rept of SG Tubing Inservice Insp (← links)
- 2CAN049108, Submits Rept of Inservice Insps of Steam Generator Tubes Completed on 910403,consisting of Number of Steam Generator Tubes Plugged During Eighth Refueling Outage.Tabulation of Location of Plugged Tubes Encl (← links)
- 2CAN119302, Forwards Addl Info Re First 10-yr ISI Relief Request B-B/3.1 Submitted Via ,In Response to NRC 921230 Safety Evaluation.Util Will Conduct Appropriate Insp for Denied Relief Requests B-J/B4.5 & C-E-1/C2.5 During 2R10 Outage (← links)
- 2CAN089006, Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info (← links)
- 2CAN068203, Forwards Corrections to 820416 Response to IE Bulletin 80-06 Re Two Components Inadvertently Listed Incorrectly. Components Are Radiation Elements 2RE-8231-1 & 2RE-8271-2 (← links)
- ML21134A241 (← links)