Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210A332 + (Vols 1 & 2 to Seabrook Environ Studies,1984: Characterization of Baseline Conditions in Hampton-Seabrook Area,1975-1984,Preoperational Study for Seabrook Station, Technical Rept XVI-II)
- L-93-113, Vols 1 & 2 to St Lucie,Unit 2 Annual Environ Operating Rept,1992, Consisting of Info Re Sea Turtle Refuge.W/ + (Vols 1 & 2 to St Lucie,Unit 2 Annual Environ Operating Rept,1992, Consisting of Info Re Sea Turtle Refuge.W/)
- ML20080G875 + (Vols 1 & 2 to Supplemental Info:Alternative Shutdown Capability Assessment & Proposed Mods,10CFR50 App R Iii.G. Vol 2 w/30 Oversize Figures.Aperture Cards Are Available in PDR)
- ML20095L413 + (Vols 1 & 2 to Topical Rept NEDC-3232OD, Enrico Fermi 2 Matl & Fuels Evaluation Final Rept, Rev 1)
- ML20046D686 + (Vols 1 & 2 to USEC-01, Application for NRC Certification for Paducah Gaseous Diffusion Plant)
- ML20148E709 + (Vols 1 & 2 to Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Ors,Usi A-46, Per GL 87-02)
- ML20202F838 + (Vols 1 & 2, Environ Impact Analysis of Central Interstate Compact Proposed Low-Level Radwaste Disposal Facility License Application)
- ML20202F808 + (Vols 1 & 2, Safety Evaluation Rept of Central Interstate Compact Proposed Low-Level Radwaste Disposal Facility License Application)
- ML20059J817 + (Vols 1 & 2,Apps A-F & G-K to Integrated Plant Assessment Process Demonstration)
- ML20042D674 + (Vols 1,2 & 3 of Environ Monitoring Rept,Dec 1989 - Jan 1990)
- ML17291A584 + (Vols 1,2 & 3 of ISI Program Plan Interval - 2. W/Oversized Drawings)
- ML18058B428 + (Vols 1,2 & 3 of Palisades Nuclear Plant Ipe)
- ML18011A404 + (Vols 1,2 & 3 of Radiological Environ Operating Rept 1993)
- ML20094L953 + (Vols 1,2 & 3 of Testimony of Rl Mccarthy,Ca Rau,Ch Wells, Hf Wachob,D Johnson,Rk Taylor,Ck Seaman,Ej Youngling, CS Mathews,Mh Lowrey,Jf Wallace & Mh Schuster on Suffolk County Contention Re Cylinder Blocks.Related Correspondence)
- ML20113A095 + (Vols 1,2 & 3 to Design Review of Brown & Root Engineering Work for South Texas Project)
- ML20217D164 + (Vols 1,2 & 3 to Rev 24 to USEC-01, Application for Us NRC Certification,Paducah Gaseous Diffusion Plant)
- ML17262B227 + (Vols 1-3 of Rev 1 to McGuire Nuclear Station Unit 1 Probabilistic Risk Assessment)
- ML17308A521 + (Vols 1-3 of St Lucie Simulator Initial Certification)
- ML13322A022 + (Vols 1-3 of, San Onofre Unit 1 Crdr Rept)
- ML20073J548 + (Vols 1-3 to Arkansas Nuclear One Units 1 & 2 Response to Suppl 1 to NUREG-0737 Requirements for Emergency Response Capability,Generic Ltr 82-33)
- ML20058E478 + (Vols 1-3 to IPE for Severe Accident Vulnerabilities)
- ML20141A538 + (Vols 1-3 to Preoperational Assessment of Water Quality & Biological Resources of Guntersville Reservoir in Vicinity of Bellefonte Nuclear Plant,1974-1984)
- ML20211F006 + (Vols 1-3 to Rept on Pilot Project on External Regulation of DOE Facilities at Radiochemical Engineering Development Ctr (Redc) Ornl)
- ML20199E842 + (Vols 1-4 of NEDO-32686-A, Util Resolution Guidance for ECCS Suction Strainer Blockage)
- ML13311A412 + (Vols 1-4 of Rev 1 to Tdi Diesel Generator Design Review & Quality Revalidation Rept)
- ML20028H184 + (Vols 1-4 of Spook,Wy Draft Completion Rept)
- ML18018B852 + (Vols 1-4 of Tdi Diesel Generator Design Review & Quality Revalidation Rept)
- ML20069F000 + (Vols 1-4 to Shoreham Decommissioning Project Termination Survey Final Rept)
- ML20113H632 + (Vols 1-4 to Tdi Diesel Generator Design Review & Quality Revalidation Rept)
- ML18036A328 + (Vols 1-5 of Browns Ferry Nuclear Plant Unit 2,Cycle 5 ISI Summary Rept.W/Nine Oversize Drawings)
- ML20235H993 + (Vols 1-5 to NIS-1/90-Day Inservice Insp Rept,Unit 1 Cycle 3)
- ML20203B444 + (Vols 1-5 to Seismic Qualification of Safety-Related Equipment,Vogtle Electric Generating Plant Unit 1)
- ML20154G251 + (Vols 1-5 to Seismic Qualification of Safety-Related Equipment Vogtle Electric Generating Station Unit 2)
- ML20248B011 + (Vols 3 & 4 to CEN-355, C-E Owners Group Restructured STS: Bases)
- ML20044A850 + (Vols 3 & 4 to Connecticut Yankee Simulator Certification Submittal:Connecticut Yankee Simulator Performance Test Rept)
- ML20024A685 + (Vols 3 & 4 to Environ Qualification of Class IE Equipment)
- ML20058E122 + (Vols 3 & 4 to Millstone Unit 3 Simulator Certification Submittal:Performance Test Rept)
- ML20134L881 + (Vols 3 & 4 to Technical Proposal in Response to RFP RS-ORM-85-312 Re Data Base Mgt Sys)
- ML18096A679 + (Vols A-D of Salem Generating Station Unit 2 Inservice Insp Program (Second Insp Interval) Long-Term Plan)
- ML20082G444 + (Vols I & II 20th Yr Physical Surveillance of TMI-1 Containment Bldg)
- ML20045H686 + (Vols I & II Book II Monitored Retrievable Storage (MRS) Facility Annotated Outline for Preparation of License Application,)
- ML20092M707 + (Vols I & II In-Vessel Coolability & Retention of Core Melt)
- ML20077B909 + (Vols I & II of Activation Analysis)
- ML20035G996 + (Vols I & II of Cajun Electric Power Cooperative,Inc, Comments,Petition for Leave to Intervene & Request for Hearing & Conditions on Application for Approval of Transfer of Ownership)
- ML20214J896 + (Vols I & II of Comanche Peak Response Team Results Repts)
- ML20236C924 + (Vols I & II of Condensation Heat Transfer Modelling for Containment Environ Response Calculations - Reappraisal for SRP, Technical Rept)
- ML18022A995 + (Vols I & II of Eddy Current Exam Rept for Sept 1995)
- ML20235V687 + (Vols I & II of Fall 1988 NDEs of Selected Class 1 & 2 Components of Salem Generating Station,Unit 2)
- ML20127E044 + (Vols I & II of Fes for Stds for Control of Byproduct Matls from U Ore Processing (40CFR192))
- ML18022B050 + (Vols I & II of IR-ISI-164, Steam Generator Eddy Current Exam Rept, for Shearon Harris Npp,Unit 1.Page 39 in Analysis Guidance Portion of Incoming Submittal Not Included)
- ML13330A649 + (Vols I & II of Inadequate Core Cooling Instrumentation, Response to Generic Ltr 82-28)