Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ND-18-0666, Vogtie, Units 3 and 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.01.11b (Index Number 118) + (Vogtie, Units 3 and 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.2.01.11b (Index Number 118))
- ND-18-0874, Vogtie, Units 3 and 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.07c.i.b (Index Number 796) + (Vogtie, Units 3 and 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 3.3.00.07c.i.b (Index Number 796))
- ND-18-1100, Vogtie, Units 3 and 4, Resubmittal Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.01.11a.i (Index Number 114) + (Vogtie, Units 3 and 4, Resubmittal Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.2.01.11a.i (Index Number 114))
- ND-18-1103, Vogtie, Units 3 and 4, Resubmittal Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.02.11a.i (Index Number 309) + (Vogtie, Units 3 and 4, Resubmittal Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Item 2.3.02.11a.i (Index Number 309))
- ML18194A696 + (Vogtie, Units 3 and 4, Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load)
- ND-19-0861, Vogtie, Units 3 and Unit 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.01.14 (Index Number 700) + (Vogtie, Units 3 and Unit 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load Item 2.7.01.14 (Index Number 700))
- ML18032A759 + (Vogtle 3 2016301 Final Exam Package)
- NL-16-0998, Vogtle Electric Generating Plant - Quality Assurance Topical Report + (Vogtle Electric Generating Plant - Quality Assurance Topical Report)
- NL-13-2418, Vogtle Electric Generating Plant - Quality Assurance Topical Report + (Vogtle Electric Generating Plant - Quality Assurance Topical Report)
- NL-15-0606, Vogtle Electric Generating Plant - Units 1 and 2 - Registration of Spent Fuel Cask Use + (Vogtle Electric Generating Plant - Units 1 and 2 - Registration of Spent Fuel Cask Use)
- NL-03-0437, Vogtle Electric Generating Plant Fitness for Duty Performance Data for July-December 2002 + (Vogtle Electric Generating Plant Fitness for Duty Performance Data for July-December 2002)
- ML18191B337 + (Vogtle Electric Generating Plant Unit 3 and Unit 4 - Resubmittal of Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load)
- IR 05000424/2012201 + (Vogtle Electric Generating Plant Units 1 and 2 Cover Letter)
- NL-15-1569, Vogtle Electric Generating Plant Units 1 & 2, Changes to Emergency Plan and ERDS Data Point Library + (Vogtle Electric Generating Plant Units 1 & 2, Changes to Emergency Plan and ERDS Data Point Library)
- NL-15-1569, Vogtle Electric Generating Plant Units 1 & 2, Revision 65 to Emergency Plan. Appendices + (Vogtle Electric Generating Plant Units 1 & 2, Revision 65 to Emergency Plan. Appendices)
- ML18179A227 + (Vogtle Electric Generating Plant Units 3 and 4 - Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal)
- EPID:L-2018-LLA-0237 + (Vogtle Electric Generating Plant Units 3 and 4 - Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal)
- ML18087A375 + (Vogtle Electric Generating Plant Units 3 and 4, Notice of Uncompleted ITAAC 225-days Prior to Initial Fuel Load)
- NL-09-0430, Vogtle Electric Generating Plant, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1) + (Vogtle Electric Generating Plant, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors (10 CFR 50.75(f)(1))
- NL-05-1442, Vogtle Electric Generating Plant, Fitness for Duty Performance Data + (Vogtle Electric Generating Plant, Fitness for Duty Performance Data)
- NL-07-1079, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization + (Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization)
- NL-11-1435, Vogtle Electric Generating Plant, Quality Assurance Topical Report + (Vogtle Electric Generating Plant, Quality Assurance Topical Report)
- NL-03-0596, Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10 + (Vogtle Electric Generating Plant, Response to RIS 2003-01 and Request for Technical Alternative to ASME Section Xl, Appendix Viii, Supplement 10)
- NL-04-2012, Vogtle Electric Generating Plant, Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections. + (Vogtle Electric Generating Plant, Response to NRC Generic Letter 2004-01, Requirements for Steam Generator Tube Inspections.)
- NL-05-1207, Vogtle Electric Generating Plant, Response to a Request for Additional Information on NRC Bulletin 03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors - Revision 1 + (Vogtle Electric Generating Plant, Response to a Request for Additional Information on NRC Bulletin 03-001, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized Water Reactors - Revision 1)
- NL-04-1628, Vogtle Electric Generating Plant, SNC Security Plan + (Vogtle Electric Generating Plant, SNC Security Plan)
- NL-05-1264, Vogtle Electric Generating Plant, September 2005 Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (Vogtle Electric Generating Plant, September 2005 Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors.)
- NL-10-0166, Vogtle Electric Generating Plant, Unit 1 - Supplement to 1R14 Steam Generator Inspection Report - Tube Pull Examination Results + (Vogtle Electric Generating Plant, Unit 1 - Supplement to 1R14 Steam Generator Inspection Report - Tube Pull Examination Results)
- NL-09-1510, Vogtle Electric Generating Plant, Unit 2 - Submittal of ISI Plan for Class 1, 2 and 3 Components for Third Inspection Interval, Volume 1, Version 3.0 + (Vogtle Electric Generating Plant, Unit 2 - Submittal of ISI Plan for Class 1, 2 and 3 Components for Third Inspection Interval, Volume 1, Version 3.0)
- ML20237F487 + (Vogtle Electric Generating Plant, Units 3 and 4 Issuance of Amendments Technical Specification 3.3.13 for Main Control Room Emergency Habitability System (Ves) Instrumentation Applicability Change and Include Undervoltage Actuation LAR 20-0)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-41 Through 3D-65 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-41 Through 3D-65)
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Third 10-Year Interval ISI Plan + (Vogtle Electric Generating Plant, Units 1 and 2 - Third 10-Year Interval ISI Plan)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figure 6.2.1-15 (Sheet 15 of 65) Through Figure 6.2.1-21 (Sheet 74 of 74) + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figure 6.2.1-15 (Sheet 15 of 65) Through Figure 6.2.1-21 (Sheet 74 of 74))
- NL-09-1510, Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0 + (Vogtle Electric Generating Plant, Units 1 and 2 - Inservice Inspection Plan Third Inspection Interval Volume 1, Version 3.0)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Section 15.2 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Section 15.2)
- ML18218A475 + (Vogtle Electric Generating Plant, Units 3 and 4 - Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2 - Resubmittal of Revision 20 to the Updated Final Safety Analysis Report Cd Roms + (Vogtle Electric Generating Plant, Units 1 & 2 - Resubmittal of Revision 20 to the Updated Final Safety Analysis Report Cd Roms)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-18 Through 3D-40 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-18 Through 3D-40)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 7 of 11, Redacted)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Section 10.3 Through Section 15.1 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Section 10.3 Through Section 15.1)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 10 of 11, Redacted)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Table 4.3-1 (Sheet 1 of 3) Through Figure 6-2.1-15 (Sheet 14 of 65) + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Table 4.3-1 (Sheet 1 of 3) Through Figure 6-2.1-15 (Sheet 14 of 65))
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 11 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 2 of 11)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 9 of 11, Redacted)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 6 of 11, Redacted)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-93 Through 3D-136 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-93 Through 3D-136)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Bases for Improved Technical Specifications + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Bases for Improved Technical Specifications)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 4 of 11, Redacted)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 11 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Reference Drawings, Part 3 of 11)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3.7.B.2-27 Through 3D-17 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3.7.B.2-27 Through 3D-17)
- ML16330A429 + (Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figure 8.3.1-1 (Sheet 25 of 34) Through Figure 10.2.2-2b)