A Southern Nuclear JUL 11 2018 Docket Nos.:
52-025 52-026 Michael J. Vox Regulatory Affairs Director Vogtie 3 & 4 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtie Electric Generating Plant Unit 3 and Unit 4 Resubmittal of Notice of Uncompleted ITAAC 225-davs Prior to Initial Fuel Load Ladies and Gentlemen; Pursuant to 10 CFR 52.99(c)(3), Southern NuclearOperating Company hereby notifies the NRC that as of June 7, 2018, Vogtie Electric Generating Plant (VEGP) Unit 3 and Unit 4 Uncompleted Inspections, Tests, Analyses, and Acceptance Criteria (ITAAC) forthe following itemshave not been completed greater than 225-days prior to initial fuel load:
ITAAC 3.3.00.07d.ii.b [Index Number 801]
ITAAC 3.3.00.07d.iii.b [Index Number 804]
ITAAC 3.3.00.07d.iv.b [Index Number 807]
ITAAC 3.3.00.07d.v.b [Index Number 810]
The Enclosures describe the plan for completing these ITAAC. Southern Nuclear Operating Companywill, at a laterdate, provide additional notifications for ITAAC that have not been completed 225-days prior to initial fuel load.
Southern Nuclear Operating Company (SNC) previously submitted Notice of Uncompleted ITAAC 225-days Priorto Initial Fuel Loadfor Items 3.3.00.07d.ii.b; iii.b; iv.b; v.b; [Index Numbers 801, 804, 807, 810] ND-18-0500 [ML18107A130, ML18107A131, ML18107A132, ML18107A133], dated April 10, 2018. This resubmittal supersedes ND-18-0500 in its entirety.
This notification is informed by the guidance described in NEI 08-01, IndustryGuideline for the ITAAC Closure Process Under 10 CFR Part 52, which was endorsed by the NRC in Regulatory Guide 1.215. In accordance with NEI 08-01, this notification includes ITAAC for which required inspections, tests, oranalyses have not been performed or have been only partially completed.
All ITAAC will be fully completed and all Section 52.99(c)(1) ITAAC Closure Notifications will be submitted to NRC to support the Commission finding that all acceptance criteria are met prior to plant operation, as required by 10 CFR 52.103(g).
This letter contains no new NRC regulatory commitments.
If there are any questions, please contact Tom Petrak at 706-848-1575.
7825 River Road Waynesboro, GA 30830 706-848-6459 tei 410-474-8587 ceii myox @southernco.com ND-18-0814 10CFR 52.99(c)(3)
U.S. Nuclear Regulatory Commission ND-18-0814 Page 2 of 4 Respectfully submitted, Michael J. Yo)l Regulatory Affairs Difector Vogtle 3 &4 :
Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit4 Docket No.;52-025 & 52-026 Completion Plan for Uncompleted ITAAC 3.3.00.07d.ii.b [Index Number 801] :
Vogtle Electric Generating Plant (VEGP) Unit3 and Unit 4 Docket No.: 52-025 & 52-026 Completion Plan for Uncompleted ITAAC 3.3.00.07d.iii.b[Index Number 804] :
Vogtle Electric Generating Plant (VEGP) Unit3 and Unit4 Docket No.: 52-025 & 52-026 Completion Plan for Uncompleted ITAAC 3.3.00.07d.iv.b [Index Number 807] :
Vogtle Electric Generating Plant (VEGP) Unit 3 and Unit4 Docket No.: 52-025 & 52-026 Completion Plan for Uncompleted ITAAC 3.3.00.07d.v.b [Index Number810]
MJY/LBP/amw
U.S. Nuclear Regulatory Commission ND-18-0814 Page 3 of 4 To:
Southern Nuclear Operating Company/ Georgia Power Company Mr. D. A. Bost (w/o enclosures)
Mr. M. D. Meier Mr. D. H. Jones (w/o enclosures)
Mr. D. L. McKinney Mr. M. J. Vox Mr. D. L. Fulton Mr. J. B. Klecha Mr. G. Chick Ms. A. L. Pugh Mr. A. 8. Parton Mr. W. A. Sparkman Mr. C. E. Morrow Ms. K. M. Stacy Mr. M. K. Washington Ms. A. C. Chamberlain Mr. T. G. Petrak Document Services RTYPE: VND.LI.L06 File AR.01.02.06 cc:
Nuciear Reoulatorv Commission Mr. W. Jones (w/o enclosures)
Ms. J. M. Heisserer Mr. C. P. Patel Mr. M. E. Ernstes Mr. G. J. Khouri Mr. T. E. Chandler Ms. S. E. Temple Ms. P. Braxton Mr. N. D. Karlovich Mr. A. J. Lerch Mr. C. J. Even Mr. F. D. Brown Mr. B. J. Kemker Ms. A. E. Rivera-Varona Mr. P. B. Donnelly Ms. N. C. Coovert Oalethorpe Power Corporation Mr. R. B. Brinkman Municipal Electric Authoritv of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utiiities Mr. T. Bundros
U.S. Nuclear Regulatory Commission ND-18-0814 Page 4 of 4 Westinqhouse Electric Company. LLC Dr. L. Oriani (w/o enclosures)
Mr. D. C. Durham (w/o enclosures)
Mr. M. M. Corletti Ms. L. G. Iller Mr. D. Hawkins Ms. J. Monahan Mr. J. L. Coward Ms. N. E. Deangelis Other Mr. J. E. Hesler, Bechtel Power Corporation Ms. L. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, inc.
Mr. 8. Roetger, Georgia Public Service Commission Ms. 8. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. 8. Blanton, Baich Bingham