Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15314A581 + (Uprate Calibration Log Scans)
- ML20028G380 + (Uptated LER 82-010/03X-1 on 820212,following Reactor Trip, Element Assembly 19 Discovered Stuck at 8-inch Withdrawn Position.Cause Undetermined.Control Element Assembly & Associated Bundle Inspected)
- ML11297A004 + (Upti - GPI Coordination)
- ML22026A051 + (Ur-Energy USA, Inc., Notice of License Expiration, 05-29252-01)
- ML18101A122 + (Uranerz Energy Corp., Nichols Ranch, Acceptance for Review, Well Plugging Procedure)
- ML18120A136 + (Uranerz Energy Corp., Nichols Ranch, Well Plugging Procedure Verification)
- ML18199A306 + (Uranerz Energy Corporation, Nichols Ranch, NRC Semi-Annual Report Review, Jan-Jun 2016, Jul-Dec 2016, Jan-Jun 2017, Jul-Dec 2017)
- Information Notice 2016-13, Uranium Accumulation in Fuel Cycle Facility Ventilation and Scrubber Systems + (Uranium Accumulation in Fuel Cycle Facility Ventilation and Scrubber Systems)
- ML22271A633 + (Uranium Activity Vs. Mass Concentration)
- ENS 46447 + (Uranium Concentration Greater than Expected in Gas Stripper System Following an Acid Wash)
- ML21335A324 + (Uranium Daughters Evaluation)
- ML20003F650 + (Uranium Dioxide Densification in Loft Fuel)
- ML20032D611 + (Uranium Dioxide Fuel Behavior Under POWER-COOLING-MISMATCH Conditions)
- ML20261D041 + (Uranium Fuel Development Laboratory Exhaust System)
- Information Notice 2016-06, Uranium Hexafluoride Cylinders With Potentially Defective 1-Inch Valves + (Uranium Hexafluoride Cylinders With Potentially Defective 1-Inch Valves)
- Information Notice 2016-06, Uranium Hexafluoride Cylinders with Potentially Defective 1-Inch Valves + (Uranium Hexafluoride Cylinders with Potentially Defective 1-Inch Valves)
- ML20086N292 + (Uranium Holdup Modeling)
- ML20064M236 + (Uranium Mill Appraisal Program)
- ML20260K803 + (Uranium Mill Tailings Burial Sys Layout La Polvadera Canyon. Aperture Card in PDR)
- ML20126J530 + (Uranium Mill Tailings Neutralization:Contaminant Complexation and Tailings Leaching Study)
- ML20202B128 + (Uranium Mill Tailings Remedial Action Project (Umtra) Falls City,Tx, Groundwater & Risk Assessment Calculations)
- ML20203K352 + (Uranium Mill Tailings Remedial Action Project,Ambrosia Lake,Nm, Including Demolition Subcontract & Subcontract Documents AMB-3,final Design for Review)
- ML20198K583 + (Uranium Mill Tailings Remedial Action Project (Umtrap), for Mexican Hat,Ut.Subcontract Documents,Preliminary Design for Review.Bid Schedule,Special Conditions,Specifications & Subcontract Drawings)
- ML20198K593 + (Uranium Mill Tailings Remedial Action Project (Umtrap) for Mexican Hat,Ut. Preliminary Design for Review.Calculations. Volumes I-IV)
- ML20197E178 + (Uranium Mill Tailings Remedial Action Project,Tuba City,Az, Tub-Ph-II Subcontract Documents, Final Design for Review, Including Bid Schedule,Specific Conditions,Specifications & Subcontract Drawings)
- ML20150E649 + (Uranium OXIDE-IRON Oxide Mixed Aerosol Experiments in STEAM-AIR Atmospheres.Nspp Tests 611,612,613 and 631,Data Record Report)
- ML18235A098 + (Uranium One Americas, Inc., Submittal of Monthly Excursion Report Monitor Well for 4MW15)
- PMNS20180158, Uranium One Ludeman Project Amendment + (Uranium One Ludeman Project Amendment)
- PMNS20180068, Uranium One Ludeman Project Amendment + (Uranium One Ludeman Project Amendment)
- PMNS20180069, Uranium One Ludeman Project Amendment + (Uranium One Ludeman Project Amendment)
- PMNS20180067, Uranium One Ludeman Project Amendment + (Uranium One Ludeman Project Amendment)
- ML18078A748 + (Uranium One Public Meeting Feb. 22, 2018)
- ML18081A226 + (Uranium One USA, Letter Ludeman Project Safety Evaluation Report, Rev 1 and License Amendment 6 of Source Material License)
- ML18081A227 + (Uranium One USA, Letter Ludeman Project Safety Evaluation Report, Rev 1 and License Amendment 6 Source Material License SUA-1341 (000092/04008502/L-2017-DEY-0002))
- ML18075A168 + (Uranium One USA, Ludeman Project - Email February 22, 2018 Public Meeting Action Item, Uranium One Acceptance of Revisions to License Conditions 10.2 & 10.24 for Ludeman Project License Amendment to Sua -1341 (000092/04008502/L-2017-DEY-000)
- ML18044A970 + (Uranium One USA, Ludeman Project Ludeman Project Amendment Safety Evaluation Report Table 1.1-1 New or Modified License Conditions for SUA-1341 for the Ludeman Expansion Project (Docket 04008502, EPID L-2017-DEY-0002)
- ML18241A290 + (Uranium One, Willow Creek - Annual Report for Wydeq Permit to Mine No. 478)
- ML20215M879 + (Uranium Oxide Aerosol Experiments in STEAM-AIR Atmospheres. Nspp Tests 401-407,Data Record Report)
- Information Notice 1992-14, Uranium Oxide Fires at Fuel Cycle Facilities + (Uranium Oxide Fires at Fuel Cycle Facilities)
- ML20070B846 + (Uranium Oxide and Sodium Oxide Aerosol Experiments:Nssp MIXED-OXIDE Tests 303-307,DATA Record Report)
- ML19074A114 + (Uranium Recovery License Issuance and Amendment Reviews - Duration and Recommendations to Improve Efficiency and Transparency - a Report for the Senate Committee on Environment and Public Works and the House Committee on Energy and Commerce)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... + (Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ...)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) the Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium in Situ Recovery . + (Uranium Recovery Policy Regarding: (1) the Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium in Situ Recovery .)
- ML25017A229 + (Uranium Recovery Site Remediation Joint Working Group Charter)
- ML20259D170 + (Uranium Shipping Container UCRL-SC-40.5-1.6 Cover)
- ML20259D166 + (Uranium Shipping Container UCRL-SC-68.5-6.6 Cover Assembly)
- ML20259D183 + (Uranium Shipping Containers DOT-55-260,A-1,B-1,D-1 Cask Assembly)
- ML21119A066 + (Uranium Travel Time and Estimated Maximum Concentration in the Cimarron River)
- ML21239A425 + (Uranium in Situ Recovery (ISR) Rulemaking Highlight)
- ML20010H076 + (Uravan Ponds Reclamation Rept, Aug 1981)
- ML19320D672 + (Uravan Tailings Piles Prior to Reclamation)
- ML24046A100 + (Urenco (LES) - Documentation Request - RP (Includes RW))
- ML20203M062 + (Urenco 2021 Inspection Schedule Letter Rev 1)
- ML20099D172 + (Urenco Document Request Final)