Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Uprate (Epu): Update on EPU Commitments". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19350A504  + (Upgrading Emergency Prepardness at Nuclear Power Facilities, Presented at American Nuclear Soc Intl Conference in Washington,Dc on 801118)
  • ML19281A889  + (Upon Review of 790104 Memo from Rk Major,Designated Federal Employee,Acrs Determines Balance of Plant Subcommittee Meeting Adenda Should Be Classified Confidential)
  • ML18348A627  + (Upon Review, in Light of Problem Identified in AO-75-15, Concluded That Procedure in Volume III Would Clarify & Emphasize Corporate Resolve in Area of Operations Inspections & Surveillance)
  • ML17261A180  + (Upper Air Meteorological Study)
  • ML19323A630  + (Upper Bearing Oil Piping:Picture. List of Components Encl)
  • ML20259C277  + (Upper Bladder Bearing Plate Assy. Sheet 1 of 1.Rev Date Illegible)
  • ML20261B242  + (Upper Cable Spreading Room Panel Location)
  • ML20262G356  + (Upper Cylinder Housing)
  • ML20151U990  + (Upper Drywell Analysis)
  • ML20262E958  + (Upper Head Injection CAP Off CAP Details)
  • ML20262E402  + (Upper Internals Structure Design Layout. Sheet 3. Consists of Four Aperture Cards)
  • ML20262E406  + (Upper Internals Structure Design Layout. Sheet 4. Consists of Four Aperture Cards)
  • ML20262E411  + (Upper Internals Structure Design Layout. Sheet 5. Consists of Three Aperture Cards)
  • ML20262E392  + (Upper Internals Structure Design Layout. Sheet 1 of 6. Consists of Four Aperture Cards)
  • ML20262E416  + (Upper Internals Structure Design Layout. Sheet 6. Consists of Two Aperture Cards)
  • ML20262E397  + (Upper Internals Structure Design Layout. Sheet 2. Consists of Two Aperture Cards)
  • ML19340B952  + (Upper Plenum Dump During Reflood)
  • ML17304A189  + (Upper Reactor Head Accelerometer Installation (J-SVN-YE-1 & 2) Elevation 118 FT-11 Inches. W/Change Notices Encl)
  • ML18038A738  + (Upper Shelf Energy Uncertainty Analysis for Nine Mile Point Unit 1 Beltline Welds Final Rept)
  • ML20266H765  + (Upper Shell Vert Welds 45 DEGREES-60 DEGREES-0 DEGREES,45 Degrees T-60 Degrees T)
  • ML20265B070  + (Upper Shielding Block.Sheet 3 of 7)
  • ML20262L658  + (Upper Spreading Room Floor Openings and Junction Boxes Raceway Designations El 240 Ft Lvl 2 Units 1 & 2 Control Building)
  • ML20349G882  + (Upper Surface of the Marl Libson Formation North & East Slopes)
  • ML20349G889  + (Upper Surface of the Marl Libson Formation South & West Slopes)
  • ML20266H761  + (Upper to Intermediate Shell CIRC 45 DEGREES-60 DEGREES-0 DEGREES,45 Degrees T-60 Degrees T)
  • ML15314A581  + (Uprate Calibration Log Scans)
  • ML20028G380  + (Uptated LER 82-010/03X-1 on 820212,following Reactor Trip, Element Assembly 19 Discovered Stuck at 8-inch Withdrawn Position.Cause Undetermined.Control Element Assembly & Associated Bundle Inspected)
  • ML11297A004  + (Upti - GPI Coordination)
  • ML22026A051  + (Ur-Energy USA, Inc., Notice of License Expiration, 05-29252-01)
  • ML18101A122  + (Uranerz Energy Corp., Nichols Ranch, Acceptance for Review, Well Plugging Procedure)
  • ML18120A136  + (Uranerz Energy Corp., Nichols Ranch, Well Plugging Procedure Verification)
  • ML18199A306  + (Uranerz Energy Corporation, Nichols Ranch, NRC Semi-Annual Report Review, Jan-Jun 2016, Jul-Dec 2016, Jan-Jun 2017, Jul-Dec 2017)
  • Information Notice 2016-13, Uranium Accumulation in Fuel Cycle Facility Ventilation and Scrubber Systems  + (Uranium Accumulation in Fuel Cycle Facility Ventilation and Scrubber Systems)
  • ML22271A633  + (Uranium Activity Vs. Mass Concentration)
  • ENS 46447  + (Uranium Concentration Greater than Expected in Gas Stripper System Following an Acid Wash)
  • ML21335A324  + (Uranium Daughters Evaluation)
  • ML20003F650  + (Uranium Dioxide Densification in Loft Fuel)
  • ML20032D611  + (Uranium Dioxide Fuel Behavior Under POWER-COOLING-MISMATCH Conditions)
  • ML20261D041  + (Uranium Fuel Development Laboratory Exhaust System)
  • Information Notice 2016-06, Uranium Hexafluoride Cylinders With Potentially Defective 1-Inch Valves  + (Uranium Hexafluoride Cylinders With Potentially Defective 1-Inch Valves)
  • Information Notice 2016-06, Uranium Hexafluoride Cylinders with Potentially Defective 1-Inch Valves  + (Uranium Hexafluoride Cylinders with Potentially Defective 1-Inch Valves)
  • ML20086N292  + (Uranium Holdup Modeling)
  • ML20064M236  + (Uranium Mill Appraisal Program)
  • ML20260K803  + (Uranium Mill Tailings Burial Sys Layout La Polvadera Canyon. Aperture Card in PDR)
  • ML20126J530  + (Uranium Mill Tailings Neutralization:Contaminant Complexation and Tailings Leaching Study)
  • ML20202B128  + (Uranium Mill Tailings Remedial Action Project (Umtra) Falls City,Tx, Groundwater & Risk Assessment Calculations)
  • ML20203K352  + (Uranium Mill Tailings Remedial Action Project,Ambrosia Lake,Nm, Including Demolition Subcontract & Subcontract Documents AMB-3,final Design for Review)
  • ML20198K583  + (Uranium Mill Tailings Remedial Action Project (Umtrap), for Mexican Hat,Ut.Subcontract Documents,Preliminary Design for Review.Bid Schedule,Special Conditions,Specifications & Subcontract Drawings)
  • ML20198K593  + (Uranium Mill Tailings Remedial Action Project (Umtrap) for Mexican Hat,Ut. Preliminary Design for Review.Calculations. Volumes I-IV)
  • ML20197E178  + (Uranium Mill Tailings Remedial Action Project,Tuba City,Az, Tub-Ph-II Subcontract Documents, Final Design for Review, Including Bid Schedule,Specific Conditions,Specifications & Subcontract Drawings)