Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML030640863 + (TSTF-439, Revision 1, Eliminating Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco)
- TSTF-05-10, TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco + (TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an Lco)
- EPID:L-2020-LLA-0124 + (TSTF-446)
- TSTF-04-16, TSTF-446, Revision 1, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791) + (TSTF-446, Revision 1, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791))
- TSTF-07-04, TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791) + (TSTF-446, Revision 2, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791))
- TSTF-08-04, TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791) + (TSTF-446, Revision 3, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15791))
- ML082940152 + (TSTF-446, Risk Informed Evaluation of Extensions to Containment Isolation Valve Completion Times (WCAP-15971), Schedule Change)
- EPID:L-2019-LLA-0128 + (TSTF-447)
- EPID:L-2023-LLA-0098 + (TSTF-447)
- EPID:L-2020-LLA-0028 + (TSTF-547, TSTF-547)
- EPID:L-2019-LLA-0108 + (TSTF-448)
- EPID:L-2018-LLA-0285 + (TSTF-448)
- EPID:L-2017-LLA-0392 + (TSTF-448)
- EPID:L-2017-LLA-0219 + (TSTF-448)
- EPID:L-2019-LLA-0187 + (TSTF-448)
- EPID:L-2019-LLA-0161 + (TSTF-448)
- EPID:L-2018-LLA-0069 + (TSTF-448)
- EPID:L-2021-LLA-0099 + (TSTF-448)
- EPID:L-2019-PMP-0118 + (TSTF-448)
- EPID:L-2022-LLA-0089 + (TSTF-448)
- EPID:L-2022-LLA-0097 + (TSTF-448)
- EPID:L-2024-LLA-0062 + (TSTF-448)
- ML061310287 + (TSTF-448 Presentation Slides - April 20, 2006)
- EPID:L-2021-LLA-0105 + (TSTF-448, TSTF-448)
- EPID:L-2019-LLA-0140 + (TSTF-448, TSTF-448, TSTF-448)
- EPID:L-2021-LRO-0022 + (TSTF-449)
- TSTF-04-13, TSTF-449, Revision 2, Steam Generator Tube Integrity + (TSTF-449, Revision 2, Steam Generator Tube Integrity)
- EPID:L-2018-LLA-0726 + (TSTF-449, TSTF-513)
- EPID:L-2023-LLA-0078 + (TSTF-505)
- ML12163A159 + (TSTF-454, Extend PCIV Completion Times (NEDC-33046), Acceptance Letter)
- ML12279A134 + (TSTF-454, Rev 2, RAIs)
- TSTF-05-15, TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046) + (TSTF-454, Revision 1, Extend PCIV Completion Times (NEDC-33046))
- EPID:L-2020-LLA-0269 + (TSTF-457)
- TSTF-06-02, TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation + (TSTF-459, Revision 1, Provide an Exception to the Requirement to Have One RHR Shutdown Cooling System in Operation)
- TSTF-04-04, TSTF-467, Revision 0, Add Restriction for Lowest Loop T(Ave) During Mode 2 Physics Testing + (TSTF-467, Revision 0, Add Restriction for Lowest Loop T(Ave) During Mode 2 Physics Testing)
- TSTF-04-05, TSTF-468, Revision 0, Declare Systems Inoperable Due to an Inoperable MCC or Distribution Panel in Lieu of ITS 3.8.9 + (TSTF-468, Revision 0, Declare Systems Inoperable Due to an Inoperable MCC or Distribution Panel in Lieu of ITS 3.8.9)
- EPID:L-2019-LLA-0188 + (TSTF-205)
- EPID:L-2021-LLA-0187 + (TSTF-286)
- EPID:L-2018-LRM-0048 + (TSTF-471)
- EPID:L-2018-LLA-0486 + (TSTF-471)
- ML19101A215 + (TSTF-471, Revision 1, Eliminate Use of Term Core Alterations in Actions and Notes)
- ML062860320 + (TSTF-471-T Deletion of Core Term Limits)
- TSTF-04-07, TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action + (TSTF-475, Revision 0, Control Rod Notch Testing Frequency and SRM Insert Control Rod Action)
- EPID:L-2018-LLA-0260 + (TSTF-476)
- TSTF-04-10, TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091) + (TSTF-476, Revision 0, Improved BPWS Control Rod Insertion Process (NEDO-33091))
- TSTF-07-01, TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091) + (TSTF-476, Revision 1, Improved BPWS Control Rod Insertion Process (NEDO-33091))
- EPID:L-2019-PMP-0118 + (TSTF-448)
- EPID:L-2022-LLA-0174 + (TSTF-477)
- EPID:L-2023-LLA-0009 + (TSTF-426)
- TSTF-04-11, TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems + (TSTF-477, Revision 0, Add Action for Two Inoperable Control Room AC Subsystems)
- TSTF-06-06, TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems + (TSTF-477, Revision 1, Add Action for Two Inoperable Control Room AC Subsystems)