Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TSTF-18-05, TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR + (TSTF Response to NRC Questions on TSTF-564, Safety Limit (Minimum Critical Power Ratio) MCPR)
- TSTF-18-06, TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition + (TSTF Response to NRC Questions on TSTF-569, Revise Response Time Testing Definition)
- TSTF-20-07, TSTF Response to NRC Questions on TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections, and Submittal of Revision 1 + (TSTF Response to NRC Questions on TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections, and Submittal of Revision 1)
- TSTF-17-19, TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program + (TSTF Response to NRC Questions on TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program)
- TSTF-23-07, TSTF Response to NRC Request for Additional Information on TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation Requirements + (TSTF Response to NRC Request for Additional Information on TSTF-592, Revision 1, Revise Automatic Depressurization System (ADS) Instrumentation Requirements)
- TSTF-23-06, TSTF Response to NRC Request for Additional Information on TSTF-576, Revision 2, Revise Safety/Relief Valve Requirements + (TSTF Response to NRC Request for Additional Information on TSTF-576, Revision 2, Revise Safety/Relief Valve Requirements)
- TSTF-24-11, TSTF Response to NRC Request for Additional Information on TSTF-600, Revision 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency + (TSTF Response to NRC Request for Additional Information on TSTF-600, Revision 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
- TSTF-25-06, TSTF Response to NRC Request for Additional Information on TSTF-585, Revision 4, Revise LCO 3.0.3 to Require Managing Risk and Transmittal of Revision 5 + (TSTF Response to NRC Request for Additional Information on TSTF-585, Revision 4, Revise LCO 3.0.3 to Require Managing Risk and Transmittal of Revision 5)
- TSTF-25-01, TSTF Response to NRC Request for Additional Information on TSTF-601, Revision 0, Extend Shield Builidng Completion Time After Refueling + (TSTF Response to NRC Request for Additional Information on TSTF-601, Revision 0, Extend Shield Builidng Completion Time After Refueling)
- TSTF-23-09, TSTF Response to NRC Request for Additional Information on TSTF-596, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) + (TSTF Response to NRC Request for Additional Information on TSTF-596, Expand the Applicability of the Surveillance Frequency Control Program (SFCP))
- TSTF-25-03, TSTF Response to NRC Second Request for Additional Information on TSTF-600, Revision 1, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency + (TSTF Response to NRC Second Request for Additional Information on TSTF-600, Revision 1, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
- ML121210730 + (TSTF Response to NRC Staff Position White Paper on TS 3.8.1 Division III HPCS Note (Item V.F))
- TSTF-23-02, TSTF Response to Request for Additional Information on TSTF-592,Revise Automatic Depressurization System (ADS) Instrumentation Requirements and Submission of Revision 1 + (TSTF Response to Request for Additional Information on TSTF-592,Revise Automatic Depressurization System (ADS) Instrumentation Requirements and Submission of Revision 1)
- ML17068A296 + (TSTF Slides for TSTF-564, Safety Limit MCPR, Pre-Submittal Meeting on 11/1/2016)
- ML24318B831 + (TSTF Slides from 11/13/24 Implementation Workshop TSTF-585, Revise LCO 3.0.3 to Require Managing Risk)
- ML003765449 + (TSTF Status Report - October 2000)
- ML070680120 + (TSTF Status Spreadsheet)
- ML073050294 + (TSTF Status Spreadsheet for 11-01-2007 Meeting)
- ML063200386 + (TSTF Traveler Milestone Schedule (11-16-06 R1 Snapshot))
- ML071140427 + (TSTF Traveler Schedule June 2007)
- ML003775261 + (TSTF Travelers Approved Between July and October 2000 (TSTF-299,TSTF-016,TSTF-169,TSTF-204,TSTF-231,TSTF-248,TSTF-300,TSTF-332,TSTF-334,TSTF-336,TSTF-342,TSTF-355,TSTF-361,TSTF-362,TSTF-366, and TSTF-367))
- EPID:L-2022-LLA-0050 + (TSTF- 359)
- EPID:L-2021-LLA-0040 + (TSTF-002)
- TSTF-05-06, TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities + (TSTF-05-06, Transmit TSTF-484, Revision 0, Use of TS 3.10.1 for Scram Time Testing Activities)
- TSTF-05-12, TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability + (TSTF-05-12, Transmit TSTF-448, Revision 2, Control Room Habitability)
- TSTF-05-20, TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 0 + (TSTF-05-20, Request for Review Fee Billing Change for TSTF-468, Revision 0)
- TSTF-05-21, TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications + (TSTF-05-21, Transmittal of TSTF-491, Revision 1, Removal of Main Steam & Main Feedwater Valve Isolation Times from Technical Specifications)
- EPID:L-2019-LLA-0188 + (TSTF-051)
- EPID:L-2017-LRO-0033 + (TSTF-051)
- EPID:L-2021-LLA-0187 + (TSTF-051)
- EPID:L-2019-LRO-0084 + (TSTF-051)
- EPID:L-2019-LLA-0040 + (TSTF-063)
- TSTF-07-29, TSTF-07-29 Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 2007 + (TSTF-07-29 Revision to Scheduled Response Date for NRC Request for Additional Information Regarding TSTF-498, Revision 0, Risk-Informed Containment Isolation Valve Completion Times (BAW-2461), Dated June 13, 2007)
- EPID:L-2022-LLA-0181 + (TSTF-107)
- EPID:L-2022-LRM-0081 + (TSTF-107)
- EPID:L-2019-LLA-0160 + (TSTF-439)
- EPID:L-2017-LLA-0287 + (TSTF-411)
- EPID:L-2018-LLA-0161 + (TSTF-111)
- ML15028A128 + (TSTF-14-13 TSTF Concerns with Proposed RIS on Pressure Boundary Leakage)
- EPID:L-2020-LLA-0104 + (TSTF-306)
- EPID:L-2022-LRM-0038 + (TSTF-163)
- EPID:L-2024-LLA-0031 + (TSTF-163)
- EPID:L-2019-LLA-0188 + (TSTF-205)
- EPID:L-2023-LLA-0101 + (TSTF-205)
- EPID:L-2021-LLA-0217 + (TSTF-563)
- EPID:L-2019-LLA-0131 + (TSTF-563)
- EPID:L-2021-LLA-0219 + (TSTF-207)
- EPID:L-2021-LLA-0129 + (TSTF-207)
- EPID:L-2018-LLA-0010 + (TSTF-208)
- EPID:L-2022-LLA-0004 + (TSTF-208)
- EPID:L-2022-LLA-0045 + (TSTF-208)
- ML040680712 + (TSTF-21-A, Rev 0, Make RHR - Low Water Level Surveillances Consistent Between PWR NUREGs)
- EPID:L-2022-LLA-0076 + (TSTF-230)
- EPID:L-2023-LLA-0128 + (TSTF-230)