Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Site Rough Grading & Drainage Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19308C935  + (Site Problem Rept 386:on 771013,electromatic Relief Valve Tested After Completion of Repairs Outlined in Site Problem Rept 369.Pilot Valve Failed to Close on Seventh Test Cycle. Caused by Close Tolerance of Pilot Valve Stem & Nozzle)
  • ML19322D225  + (Site Problem Rept 41:on 721010,RS Rand Contacted Bailey Meter Co Re Inability of Pressurizer Level Compensation Circuit to Be Calibr to Match Revised Pressurizer Compensation Data Transmitted Apr 1972 by Siegel)
  • ML19322A364  + (Site Problem Rept 444,on 730122:reactor Coolant Valve Steam Leak.Valve Had Excessive Travel & Yoke Bushing Threads Were Cut by Stem.During Replacement of Yoke Bushing,Steam Leaked Past Reactor Coolant Valve 3.Supporting Matl Encl)
  • ML19322A353  + (Site Problem Rept 445 Re once-through Steam Generator Boiled Dry on Three Occasions on 770422-3.Post Trip Reviews & Relevant Strip Chart Recordings Encl)
  • ML19322A355  + (Site Problem Rept 446 Re Upgrading of Core Flood Valves Documentation on 780815.Supporting Matl Including Ja Lauer 780109 Memos to CA Armontrout & Fr Faist & Manufacturers Data Rept for Nuclear Pumps & Valves Encl)
  • ML19322A356  + (Site Problem Rept 456 Re Confusing 855 Pressurizer Level Indication on 730901.Recommends Output for Pressurizer Inputs Be Temp & Pressure Compensated Pressurizer Level. Supporting Matl Including Ha Baker 740114 Memo Encl)
  • ML19322A365  + (Site Problem Rept 533 on 730518 Re Loss of Feedwater.Caused by Failure of Emergency Feedwater Pump to Start & Main Turbine to Trip Upon Loss of Feedwater Pumps.Supporting Matl Encl)
  • ML19322A357  + (Site Problem Rept 546 Re Erratic Operation of Reactor coolant-valve 1 on 730706.Caused by Galled Shaft.Shaft Dressed W/Emery Cloth & Valve Repacked on 730707.Sheared Key Found During 730708 Checkout.Supporting Matl Encl)
  • ML19322A362  + (Site Problem Rept 560 Re Reactor Coolant Valve (RC-V2) Motor Burnout on 731005.Caused by Failure of Valve to Open During Dropped Rod Incident & Operator Error.Valve Actuator Replaced on 731007 & Returned to Svc W/Overloads Bypassed)
  • ML19322A358  + (Site Problem Rept 571 Re Loss of Feedwater to once-through Steam Generators on 741011.Supporting Matl Including Ja Bailey 741112 & 13 Ltrs to Util Encl)
  • ML19322D197  + (Site Problem Rept 679:on 770403,facility Started Following once-through Steam Generator Tube Leak Repairs.High Pressure Rx Tripped Due to Bad Summer Module in Ics.Recommenced Startup Following Module Repair)
  • ML20024C726  + (Site Problem Rept Resolution transmittal,13-6-183-0)
  • ML20024C814  + (Site Problem Rept SPR-108:on 750613,during Shutdown to Replace Reactor Coolant Pump Seals,Rcs Rapid Depressurization Transient Experienced.Caused by Pressure Spike)
  • ML19322A366  + (Site Problem Rept on 790320 Re Rapid Cooldown Transient. Caused by Loss of Power to non-nuclear Instrumentation Sys & Subsequent Loss of Input Signals to Control Room,Computer & Intercommunicatin Sys Due to Short.Supporting Matl Encl)
  • ML19308B766  + (Site Problem on 771129,reactor Tripped on Reactor Protection Sys Channel 2 & 4 High Flux.Caused by Not Removing Jumpers in Startup Reactimeter Patch Board.B&W Will Evaluate Transient Data & Recommend follow-up Action)
  • ML18194A052  + (Site Property)
  • ML20262A835  + (Site Radiation Zones Normal Operation Shutdown)
  • ML20262A851  + (Site Radiation Zones Post Accident)
  • ML20262A727  + (Site Radiological Access Controls Normal Operation Shutdown)
  • ML20086T469  + (Site Redress Plan)
  • ML032721611  + (Site Redress Plan for the Exelon Generation Company, LLC Early Site Permit)
  • ML19350C339  + (Site Regulatory Compliance Manual for Nuclear Fuel Div,At AL Nuclear Fuel Fabrication Plant)
  • ML20262A166  + (Site Related Main Control Board RL013 and RL014)
  • ML20262A055  + (Site Related Main Control Board RL013 and RL014)
  • ML21272A001  + (Site Response SSHAC Level 2 Workshop Presentations - January 28-29, 2020)
  • ML20261A284  + (Site Rough Grading Area Plan. Sheet 1)
  • ML20261A221  + (Site Rough Grading Area Plan. Sheet 10)
  • ML20261A147  + (Site Rough Grading Area Plan. Sheet 11)
  • ML20261A149  + (Site Rough Grading Area Plan. Sheet 12)
  • ML20261A160  + (Site Rough Grading Area Plan. Sheet 13)
  • ML20261A166  + (Site Rough Grading Area Plan. Sheet 14)
  • ML20261A069  + (Site Rough Grading Area Plan. Sheet 15)
  • ML20261A288  + (Site Rough Grading Area Plan. Sheet 2)
  • ML20261A233  + (Site Rough Grading Area Plan. Sheet 3)
  • ML20261A179  + (Site Rough Grading Area Plan. Sheet 4)
  • ML20261A190  + (Site Rough Grading Area Plan. Sheet 5)
  • ML20261A194  + (Site Rough Grading Area Plan. Sheet 6)
  • ML20261A203  + (Site Rough Grading Area Plan. Sheet 7)
  • ML20261A207  + (Site Rough Grading Area Plan. Sheet 8)
  • ML20261A211  + (Site Rough Grading Area Plan. Sheet 9)
  • ML20261A116  + (Site Rough Grading Area Sections. Sheet 1)
  • ML20261A103  + (Site Rough Grading Area Sections. Sheet 2)
  • ML20261A101  + (Site Rough Grading Area Sections. Sheet 3)
  • ML20261A095  + (Site Rough Grading Area Sections. Sheet 4)
  • ML20261A083  + (Site Rough Grading Area Sections. Sheet 5)
  • ML20261A079  + (Site Rough Grading Area Sections. Sheet 6)
  • ML20261A170  + (Site Rough Grading Misc Sections & Details. Sheet 1)
  • ML20261A174  + (Site Rough Grading Misc Sections & Details. Sheet 2)
  • ML20261A142  + (Site Rough Grading Misc Sections & Details. Sheet 3)
  • ML20261A131  + (Site Rough Grading Misc Sections & Details. Sheet 4)