Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064N325 + (Seismic Margin Review Midland Energy Ctr Project,Vol VII: Electrical,Control,Instrumentation & Mechanical Equipment Margins)
- ML20206B293 + (Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 3.Fragility Analysis)
- ML20206B318 + (Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 2.Systems Analysis)
- ML20206B249 + (Seismic Margin Review of the Maine Yankee Atomic Power Station.Volume 1.Summary Report)
- ML20073C611 + (Seismic Margin Review,Midland Energy Ctr Project,Vol II: Reactor Containment Bldg)
- ML20028G692 + (Seismic Margin Review,Midland Energy Ctr Project- Methodology & Criteria, Vol 1)
- ML20081C373 + (Seismic Margin Review,Miscellaneous Subsystems & Components)
- ML20085D809 + (Seismic Margin Review,Vol Iii,Auxiliary Bldg)
- NLS2017070, Seismic Mitigating Strategies Assessment Report for the Reevaluated Seismic Hazard Information + (Seismic Mitigating Strategies Assessment Report for the Reevaluated Seismic Hazard Information)
- L-MT-17-055, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4, Path 4 + (Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4, Path 4)
- ENS 51184 + (Seismic Monitor Declared Non Functional)
- ENS 50001 + (Seismic Monitor Declared Non-Functional Due to Spurious Alarm)
- ENS 51205 + (Seismic Monitor Inoperable)
- ENS 51247 + (Seismic Monitor Inoperable)
- ENS 51530 + (Seismic Monitor Inoperable)
- ST-HL-AE-5143, Seismic Monitor Inoperable for Greater than 30 Days & Subsequent Failure to Submit Special Rept as Required by TS + (Seismic Monitor Inoperable for Greater than 30 Days & Subsequent Failure to Submit Special Rept as Required by TS)
- ENS 50926 + (Seismic Monitor Not Available for Emergency Plan Assessment)
- ENS 50932 + (Seismic Monitor Not Available for Emergency Plan Assessment)
- ENS 50933 + (Seismic Monitor Not Available for Emergency Plan Assessment)
- ENS 50948 + (Seismic Monitor Not Available for Emergency Plan Assessment)
- ENS 52698 + (Seismic Monitor Panel Non-Functional)
- ENS 52989 + (Seismic Monitoring Computer Out-Of-Service)
- ML19261D546 + (Seismic Monitoring Network, Quarterly Rept 15 for Dec1978-Feb 1979.Prepared by Woodward-Clyde Consultants,Inc)
- ENS 53700 + (Seismic Monitoring Panel System Inoperable)
- ML18018A517 + (Seismic Monitoring Program Quarterly Data Rept Jan-Mar 1983)
- ML18018B908 + (Seismic Monitoring Program Quarterly Data Rept, Jan-Mar 1985)
- ML18003A581 + (Seismic Monitoring Program,First Data Rept, 770930-790331)
- ML18018A840 + (Seismic Monitoring Program.Quarterly Data Rept,Jul-Sept 1983)
- ML18017B313 + (Seismic Monitoring Rept,Oct-Dec 1980)
- ENS 48588 + (Seismic Monitoring System Inoperable for Pre-Planned Maintenance)
- ENS 43292 + (Seismic Monitoring System Out of Service)
- ENS 51041 + (Seismic Monitoring System Out of Service)
- ENS 55213 + (Seismic Monitoring System Out of Service for Planned Maintenance)
- ENS 51932 + (Seismic Monitoring System Out of Service for Planned Upgrade)
- 05000305/FIN-2009002-06 + (Seismic Monitoring System Repeatedly Fails Surveillance)
- 05000305/FIN-2009003-04 + (Seismic Monitoring System Repeatedly Fails Surveillance)
- ML19308A357 + (Seismic Network Annual Rept, Nov 1977-Oct 1978, by Tera Corp)
- ML20093D186 + (Seismic OBE & SSE Required Response Spectra for Auxiliary, Control,Diesel Generator,Fuel,Turbine,Pipe Tunnels 1 & 2 & Standby Svc Water Pumphouse & Cooling Tower Bldg)
- ML20093D217 + (Seismic OBE & SSE Required Response Spectra for Reactor Bldg)
- ML20044G170 + (Seismic Occurrence of 930330, Engineering Evaluation)
- ML18017A963 + (Seismic PRA Code Case Letter)
- ML13311A241 + (Seismic Performance of Piping in Past Earthquakes, Submitted for Presentation & Publication at 800915-17 Speciality Conference on Civil Engineering & Nuclear Power in Knoxville,Tn)
- ML20133M743 + (Seismic Pipe-Stress Calculation Techniques & Reanalysis Effort)
- ML17300B307 + (Seismic Portion of Submittal-Only Screening Review of Palo Verde Nuclear Generating Station Units Ipeee)
- ML20151P748 + (Seismic Potential of Gorda Segment of Cascadia Subduction Zone, Presented at 880506-08 Meeting in Seattle,Wa)
- RA-19-0452, Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident + (Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012, Request for Information Regarding Recommendation 2.1: Seismic, of the Near-Term Task Force Related to the Fukushima Dai-ichi Accident)
- RA-18-0252, Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012 Request for Information Regarding Recommendation 2.1 Seismic of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident + (Seismic Probabilistic Risk Assessment (Spra), Response to March 12, 2012 Request for Information Regarding Recommendation 2.1 Seismic of the Near-Term Task Force Related to the Fukushima Dai-ichi Nuclear Power Plant Accident)
- RNP-RA/16-0037, Seismic Probabilistic Risk Assessment Plans in Response to Request for Information Per Near-Term Task Force Recommendation 2.1 + (Seismic Probabilistic Risk Assessment Plans in Response to Request for Information Per Near-Term Task Force Recommendation 2.1)
- CNL-19-122, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights + (Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights)
- GO2-19-136, Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi + (Seismic Probabilistic Risk Assessment Response to NRC Request for Information Pursuant to 10 CFR 50.54(F)Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukushima Dai-Ichi)
- RS-19-101, Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From. + (Seismic Probabilistic Risk Assessment Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights From.)