Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087L059 + (Second Petition for Leave to Intervene in Proceedings. Certificate of Svc Encl)
- ML090880002 + (Second Portion of Draft RAI from the Mechanical and Civil Engineering Branch Regarding the Proposed Extended Power Uprate Amendment)
- ML20189A639 + (Second Postponement Letter for Vendor Inspection at Framatome Fuel Fabrication Facility)
- PMNS20210216, Second Pre-Submittal Call on Changes to the La Crosse ISFSI-Only Emergency Plan + (Second Pre-Submittal Call on Changes to the La Crosse ISFSI-Only Emergency Plan)
- PMNS20220522, Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety + (Second Pre-Submittal Meeting for License Renewal Application for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 (CPNPP) - Safety)
- ML19310F050 + (Second Pre-application Meeting with Holtec International to Discuss Holtec Internationals Plans to Submit a Thermal Topical Report for Allowance of Candidate Heat Load Patterns Without an Amendment Request)
- ML20058E047 + (Second Prehearing Conference Order (Proposed Contentions; Summary Disposition).* Environmental & Resources Conservation Organization Bases 1,5,11,13,2 & 14 Accepted for Litigation.W/Certificate of Svc.Served on 931201)
- ML20150E192 + (Second Prehearing Conference Order (Rulings on Temporary Stay Order & on Schedules).* Temporary Stay of License Amend 104 Denied,Further Discovery in Supra Authorized & NRC Requested to Provide Status Rept by 880801.Served on 880713)
- ML17138B232 + (Second Prehearing Conference Order Denying Applicants Motions to Restrict Susquehanna Environ Advocates & Environ Coalition on Nuclear Power Participation.Citizens Against Nuclear Dangers Environ Contentions Limited to Own Filing)
- ML19329G113 + (Second Prehearing Conference Order Outlining Matters Discussed Re New Policy for Procedural Assistance to Intervenors,Special Circumstances in Severe Accidents & Coulee Region Energy Coalition Presentation on full-term OL)
- ML19340D384 + (Second Prehearing Conference Order Setting Forth Issues Accepted for Consideration at Expedited Qa/Qc Hearing. Hearings Will Be Held in Bay City,Tx.List of Qa/Qc Issues Encl)
- ML19326D546 + (Second Prehearing Conference Ordering Discovery by Parties Completed by 720216.Objections to Request for Info Made by Any Party Must Be in Writing within Five Working Days.Third Prehearing Conference on 730312.Certificate of Svc Encl)
- ML20032C764 + (Second Prehearing Memorandum & Order.Nrdc Filings Will Be Accepted & Considered as Part of Record.Consolidates Participants Into Listed Groups)
- ND-19-1314, Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2) + (Second Preliminary Amendment Request (Par): Reinforcement Changes for Wall L (PAR-19-016-2))
- PMNS20200065, Second Presubmittal Meeting with STP Nuclear Operating Company Regarding a Proposed License Amendment Request to Rebaseline the South Texas Project, Units 1 and 2 Emergency Plan + (Second Presubmittal Meeting with STP Nuclear Operating Company Regarding a Proposed License Amendment Request to Rebaseline the South Texas Project, Units 1 and 2 Emergency Plan)
- ML19322C032 + (Second Presubmittal Public Teleconference with Vistra Operations Company LLC Proposed Changes to Technical Specification 3.8.1, AC Sources -- Operating, for Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2)
- ML20211G591 + (Second Progress Rept & Annotated Bibliography in Response to Board 860606 Memorandum & Order.Revised Portions of Comanche Peak Response Team Program Plan & Review of Isap Results Rept Discussed.Related Info Encl.W/Certificate of Svc)
- ML20039B115 + (Second Progress Rept Re Discovery Activities Per ASLB 810909 Order.Certificate of Svc Encl)
- ML19340B361 + (Second Proposed Revision 3 to Reg Guide 1.33,QA Program Requirements for Nuclear Power Plants)
- PMNS20240356, Second Public Meeting on SMR Holtec Quality Assurance Program Description (QAPD) Topical Report Review, NRC Staffs Information Needs + (Second Public Meeting on SMR Holtec Quality Assurance Program Description (QAPD) Topical Report Review, NRC Staffs Information Needs)
- ML21111A194 + (Second Quarter (Fy 2021) Licensing Activities and Regulatory Duties Report)
- ML20030E049 + (Second Quarter 1981 NPDES Monitoring Rept for NPDES Permit AR0001392)
- ML20078Q277 + (Second Quarter 1982 ALARA Rept)
- ML20217L756 + (Second Quarter 1988 Radon-222 Rept)
- ML20211N789 + (Second Quarter 1994 Industrial Hygiene & Safety Audit Envirocare of UT South Clive Operations)
- DCL-2004-562, Second Quarter 2004 Report on Discharge Monitoring + (Second Quarter 2004 Report on Discharge Monitoring)
- DCL-2005-533, Second Quarter 2005 Report on Discharge Monitoring at Diablo Canyon Power Plant + (Second Quarter 2005 Report on Discharge Monitoring at Diablo Canyon Power Plant)
- DCL-2007-523, Second Quarter 2007 Report on Discharge Monitoring at Diablo Canyon Power Plant + (Second Quarter 2007 Report on Discharge Monitoring at Diablo Canyon Power Plant)
- ML072080486 + (Second Quarter 2007 Report on Discharge Monitoring at Diablo Canyon Power Plant)
- ML25141A024 + (Second Quarter 2025 Emergency Plan Changes In-Office Inspection - Closure Basis)
- ML18227A103 + (Second Quarter Davis-Besse Report and Errata)
- ML19321B088 + (Second Quarter FY79 Progress Rept on Refill Effects Program, Quarterly Progress Rept for Jan-Mar 1979)
- ML20196F147 + (Second Quarter,1998 Sampling Results of Groundwater Monitoring Program at Shallow Land Disposal Area. with)
- ML19309H523 + (Second Quarterly Progress Rept for 791210-800309 Re Transportation Contract Between State of Wa & NRC)
- ML20079J105 + (Second Quarterly Progress Rept,Crystal River Studies)
- ML20245A679 + (Second Quarterly Rept Cleveland Electric Illuminating Co, Seismic Monitoring Network,870115-0415)
- ML17331A708 + (Second Quarterly Rept on Hydrogen Mitigation & Control)
- ML13276A050 + (Second Quarterly Status Report to the Flooding Hazard Reevaluation Report Extension Request and Response to the Request for Additional Information Related to the Review of Potential Breaches of Hesco Flood Barriers and Earthen Embankments a)
- ML043240401 + (Second RAI, Proposed License Amendment, WCAP-9272, Reload Methodology and Implementing 30 Percent Steam Generator Tube Plugging Limit)
- ML030370079 + (Second RAI, Risk-Informed Inservice Inspection Program Plans Inservice Inspection Program Relief Request L-02-066, (TAC Nos. MB5687 & MB5688))
- DCL-15-061, Second Radiation Release Response to NRC Request for Additional Information - National Fire Protection Association Standard 805 + (Second Radiation Release Response to NRC Request for Additional Information - National Fire Protection Association Standard 805)
- Information Notice 1989-15, Second Reactor Coolant Pump Shaft Failure at Crystal River + (Second Reactor Coolant Pump Shaft Failure at Crystal River)
- ML18320A221 + (Second Referral Memorandum from the Secretary to the Atomic Safety Licensing Board Panel)
- ML19154A469 + (Second Regulatory Audit Plan for June 17-20, 2019, in Support of Framatome High Thermal Performance Fuel License Amendment Request and Exemption)
- ML17054C464 + (Second Regulatory Audit Plan for March 8, 2017, Audit at Excel Facility in Rockville, Maryland, in Support of Next Generation Fuel License Amendment Request and Exemption)
- ML17252B197 + (Second Reload License Submittal)
- ML20090M505 + (Second Reload Submittal)
- ML101460062 + (Second Report Regarding Lead Test Assembly)
- ML20248D733 + (Second Rept of Parties & Request for Dismissal of Graterford Inmates Contention & Termination of Proceeding.* Requests Board to Enter Order to Terminate Proceeding Based on Parties Agreeing to Dismissal of Remaining Contention)
- ML20077C487 + (Second Rept on Significant Const Deficiency 81 Re Shelf Life Exceeded on Cable Splice & Termination Tape.Completion of Corrective Action Delayed Due to Testing of Volt Terminations.Final Rept Will Be Provided by 830830)
- ML19211D137 + (Second Request by CA Energy Commission (CEC) for Production of Documents Identified in Smud Responses to 791221 Second Set of Interrogatories.Cec 791115 First Request for Production Incorporated by Ref)