Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094B828 + (SRP Section 6.5.1, ESF Filter Sys)
- ML20094B830 + (SRP Section 6.5.3, Fission Product Control Sys)
- ML20094B832 + (SRP Section 6.5.4, Ice Condenser as Fission Product Cleanup Sys)
- ML20094B837 + (SRP Section 6.7, MSIV Leakage Control Sys (Bwr))
- ML20094B928 + (SRP Section 7,App 7-A, Branch Technical Positions (Eicsb))
- ML20094B929 + (SRP Section 7,App 7-B, General Agenda,Station Site Visits)
- ML20094B853 + (SRP Section 7.1, Introduction. Table 7-1, Acceptance Criteria for Controls Also Encl)
- ML20094B868 + (SRP Section 7.2, Reactor Trip Sys)
- ML20094B875 + (SRP Section 7.3, ESF Sys)
- ML20094B885 + (SRP Section 7.4, Sys Required for Safe Shutdown)
- ML20094B889 + (SRP Section 7.5, Safety-Related Display Instrumentation)
- ML20094B895 + (SRP Section 7.6, All Other Instrumentation Sys Required for Safety)
- ML20094B904 + (SRP Section 7.7, Control Sys Not Required for Safety)
- ML20094B941 + (SRP Section 8.1, Introduction. Table 8-1, Acceptance Criteria for Electric Power Also Encl)
- ML20094B946 + (SRP Section 8.2, Offsite Power Sys)
- ML20094B959 + (SRP Section 8.3.1, AC Power Sys (Onsite))
- ML20094B960 + (SRP Section 8.3.2, DC Power Sys (Onsite))
- ML20094B967 + (SRP Section 9.1.1, New Fuel Storage)
- ML20094B973 + (SRP Section 9.1.2, Spent Fuel Storage)
- ML20094B981 + (SRP Section 9.1.3, Spent Fuel Pool Cooling & Cleanup Sys)
- ML20094B988 + (SRP Section 9.1.4, Fuel Handling Sys)
- ML20094B990 + (SRP Section 9.2.1, Station Svc Water Sys)
- ML20094B997 + (SRP Section 9.2.3, Demineralized Water Makeup Sys)
- ML20094B999 + (SRP Section 9.2.4, Portable & Sanitary Water Sys)
- ML20094C005 + (SRP Section 9.2.5, Ultimate Heat Sink)
- ML20094C100 + (SRP Section 9.2.6, Review Responsibilities)
- ML20094C106 + (SRP Section 9.3.2, Process Sampling Sys)
- ML20094C114 + (SRP Section 9.3.3, Equipment & Floor Drainage Sys)
- ML20094C118 + (SRP Section 9.3.4, Chemical & Vol Control Sys (PWR) (Including Boron Recovery Sys))
- ML20094C123 + (SRP Section 9.3.5, Standby Liquid Control Sys (Bwr))
- ML20094C126 + (SRP Section 9.4.1, Control Room Area Ventilation Sys)
- ML20094C129 + (SRP Section 9.4.2, Spent Fuel Pool Area Ventilation Sys)
- ML20094C133 + (SRP Section 9.4.3, Auxiliary & Radwaste Area Ventilation Sys)
- ML20094C138 + (SRP Section 9.4.4, Turbine Area Ventilation Sys)
- ML20094C145 + (SRP Section 9.4.5, ESF Ventilation Sys)
- ML20094C180 + (SRP Section 9.5.1, Fire Protection Sys)
- ML20094C182 + (SRP Section 9.5.2, Communication Sys)
- ML20094C185 + (SRP Section 9.5.3, Lighting Sys)
- ML20094C191 + (SRP Section 9.5.4, Emergency Diesel Engine Fuel Oil Storage & Transfer Sys)
- ML20094C201 + (SRP Section 9.5.5, Emergency Diesel Engine Cooling Water Sys)
- ML20094C208 + (SRP Section 9.5.6, Emergency Diesel Engine Starting Sys)
- ML20094C215 + (SRP Section 9.5.7, Emergency Diesel Engine Lubrication Sys)
- ML20094C218 + (SRP Section 9.5.8, Emergency Diesel Engine Combustion Air Intake & Exhaust Sys)
- ML20094C563 + (SRP Sections 15.3.3 & 15.3.4, Reactor Coolant Pump Rotor Seizure & Reactor Coolant Pump Shaft Break)
- ML20094B424 + (SRP Sections 2.2.1 & 2.2.2, Locations & Routes, Descriptions)
- ML20151T232 + (SRP for Evaluating Power Reactor License Termination Plans)
- ML20216E140 + (SRP for Review of Decommissioning Plans & Other Info Submitted to Support Release of Nuclear Facilities, Draft for Review & Comment Only)
- ML20202E401 + (SRP for Umtrap Remedial Actions Plans,Cahpter 4:Water Resources Protection)
- ML19323E705 + (SRP, Revision to Section 5.4.7, RHR Sys)
- ML19221B159 + (SRP,Section15.8, Anticipated Transients W/O Scan)
- ML19179A033 + (SRR-CWDA 2018-00085 Rev. 0 Saltstone Disposal Facility (Z Area)Performance Assessment)