Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031D655 + (SRO Written Examination Performance Trend)
- ML22056A518 + (SRO Written Examination Performance Trend (2021))
- ML060060281 + (SRO Written Examination and Answer Key)
- L-2003-317, SRO Written License Examination Comments + (SRO Written License Examination Comments)
- ML030710299 + (SRO and RO Reference List for the Perry Initial Examination - Jan/Feb 2003)
- ML24309A049 + (SRO as Given Catawba 2024)
- 05000361/FIN-2011012-01 + (SRO performed licensed activities (core alterations) as Refueling SRO Supervisor while license was INACTIVE)
- 05000317/FIN-2016301-01 + (SRO upgrade candidates performing RO duties without completing the requalification program)
- ML073240718 + (SRO-NERP-12, the Fishes of the Savannah River Plant: National Environmental Research Park)
- ML18060A134 + (SRO-ONLY-written Examination Average grades_FY2017)
- ML18060A124 + (SRO-ONLY-written Examination Pass rates_FY2017)
- ML20031D651 + (SRO-Only Written Examination Average Grades)
- ML22060A206 + (SRO-Only Written Examination Average Grades)
- ML20031D652 + (SRO-Only Written Examination Pass-Rates)
- ML22060A207 + (SRO-Only Written Examination Pass-Rates)
- ML18060A122 + (SRO-Written Exam Historical Performance_FY2017)
- ML18060A123 + (SRO-operating Test Pass rates_FY2017)
- ML18060A128 + (SRO-overall Pass rates_FY2017)
- ML18060A125 + (SRO-written Examination Average grades_FY2017)
- ML18060A127 + (SRO-written Examination Pass rates_FY2017)
- ML18143B713 + (SRP 13.4, Rev 4, Operational Programs Redline/Strikeout)
- ML18163A203 + (SRP 13.6, Physical Security (New))
- ML18200A053 + (SRP 13.6, Physical Security Redline/Strikeout Revision 4)
- ML18092A046 + (SRP 14.3.3 Redline 3-30-18)
- ML18183A446 + (SRP 2.3.3, On-site Meteorological Measurements Program)
- ML18190A201 + (SRP 2.4.9, Channel Migration or Diversion)
- ML18183A044 + (SRP 2.5.3 Surface Faulting)
- ML18186A630 + (SRP 2.5.3 Surface Faulting)
- ML18145A019 + (SRP 7 BTP HICB-19 R4 W Comments)
- ML19323G862 + (SRP Proposed Revision 2 to Section 3.9.6, Inservice Testing of Pumps & Valves)
- ML20094B996 + (SRP Rev 0 to Section 9.2.2, Reactor Auxiliary Cooling Water Sys)
- ML20032D827 + (SRP Revision 2 to Section 13.1.1, Mgt & Technical Support Organization)
- ML20032D829 + (SRP Revision 2 to Section 13.1.2-13.1.3, Operating Organization)
- ML20031D715 + (SRP Revision 2 to Section 4.2, Fuel Sys Design)
- ML20094C700 + (SRP Section 1.8, Interfaces for Std Designs)
- ML20094C224 + (SRP Section 10.2, Turbine Generator)
- ML20094C238 + (SRP Section 10.3, Main Steam Supply Sys)
- ML20094C241 + (SRP Section 10.3.6, Steam & Feedwater Sys Matls)
- ML20094C245 + (SRP Section 10.4.1, Main Condensers)
- ML20094C254 + (SRP Section 10.4.2, Main Condenser Evacuation Sys)
- ML20094C269 + (SRP Section 10.4.3, Turbine Gland Sealing Sys)
- ML20094C276 + (SRP Section 10.4.4, Turbine Bypass Sys)
- ML20094C288 + (SRP Section 10.4.5, Circulating Water Sys)
- ML20094C355 + (SRP Section 10.4.6, Condensate Cleanup Sys)
- ML20094C362 + (SRP Section 10.4.7, Condensate & Feedwater Sys)
- ML20094C367 + (SRP Section 10.4.8, Steam Generator Blowdown Sys (Pwr))
- ML20094C370 + (SRP Section 10.4.9, Auxiliary Feedwater Sys (Pwr))
- ML20094C375 + (SRP Section 11.1, Source Terms)
- ML20094C384 + (SRP Section 11.2, Liquid Waste Mgt Sys)
- ML20094C388 + (SRP Section 11.4, Solid Waste Mgt Sys)
- ML20094C399 + (SRP Section 11.5, Process & Effluent Radiological Monitoring & Sampling Sys)
- ML20094C407 + (SRP Section 12.1, Assuring That Occupational Radiation Exposures Alara)