Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20053D237 + (SPTH3:Subroutine for Finding Shortest Sabotage Paths)
- ML102430446 + (SQN 2 SG ISI Report Clarification)
- ML13298A034 + (SQN Air Quality Permit, Expire on 7-17-2017, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.A.II.3)
- ML13298A029 + (SQN Annual Air Inspection Report 2007, Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.ii.4)
- ML13289A199 + (SQN Annual Water Withdrawal Updates for January 2011)
- ML13289A201 + (SQN Annual Water Withdrawal Updates for January 2012)
- ML13289A198 + (SQN Annual Water Withdrawal Updates for July 2010)
- ML13289A200 + (SQN Annual Water Withdrawal Updates for July 2011)
- ML15103A585 + (SQN Continued Storage Note to File - OGC Comments)
- ML13298A031 + (SQN Femp Energy and Ghg Reporting Tool: Results Summary Fy 2008 - Fy 2012 Listed in Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.9 (7 Pages))
- ML13298A030 + (SQN List of Potential Sources of Ghg Emissions Due to Refrigerant Leaks Submitted on Cd Attached to Letter from TVA, Dated Sep 20, 2013, in Response to RAI 6.a.i.3)
- ML20080G858 + (SQN NIS-1 Owners Data Rept Unit 2,Cycle 6, Vols 1 & 2)
- ML15104A689 + (SQN Record of Decision)
- ML15100A046 + (SQN U1 Renewed License v2)
- ML15100A049 + (SQN U2 Renewed License v2)
- ML030920453 + (SQUG Outlier Resolution - Revision of Commitment)
- L-87-002, SQUG Outlier Resolution - Revision of Commitment + (SQUG Outlier Resolution - Revision of Commitment)
- ML022680122 + (SQUG Resolution of USI A-46 (Generic Letter 87-02) SQUG Outlier Resolution Completion Notice)
- ML020990133 + (SQUG Resolution of USI A-46 (Generic Letter 87-02) Expected Completion of SQUG Outliers)
- ML20265B569 + (SR & Tp Flow Chart)
- ML12334A443 + (SR 12-002-00 for Virgil C. Summer, Unit 1 Regarding Meteorological Monitoring Channels Being Inoperable for More than Seven Days)
- NL-18-1391, SR 2018-002-00 for Joseph M. Farley Plant, Unit 2, Nonfunctional Radiation Monitor R-29B + (SR 2018-002-00 for Joseph M. Farley Plant, Unit 2, Nonfunctional Radiation Monitor R-29B)
- ULNRC-06441, SR 2018-02-00 for Callaway Plant, Unit 1, Non-Functionality of an Accident Monitoring Instrument for Greater than 30 Days + (SR 2018-02-00 for Callaway Plant, Unit 1, Non-Functionality of an Accident Monitoring Instrument for Greater than 30 Days)
- ML20160A023 + (SR 2020-001-00 for Browns Ferry Nuclear Plant (Bfn),Inoperable Oscillating Power Range Monitor (OPRM) Instrumentation)
- W3F1-2023-0002, SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days + (SR 2023-001-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 30 Days)
- ML20265B587 + (SR Actuating & Source Mount Assembly)
- ML20265B582 + (SR Actuating Assembly)
- ML20265C249 + (SR O Actuating Assembly.Actual Drawing number:C236171)
- ML20265C065 + (SR O Actuating Source Mount Assy)
- ML20265C574 + (SR O Center Plate)
- ML20265C265 + (SR O Center Plate)
- ML20265C585 + (SR O Cover)
- ML20265C082 + (SR O Cover)
- ML20265C591 + (SR O Source Mount Assy)
- ULNRC-06142, SR-14-002 Callaway, Unit 1 - Special Report 2014-02-PAM Report Inoperability of Post Accident Monitoring (PAM) Instrument + (SR-14-002 Callaway, Unit 1 - Special Report 2014-02-PAM Report Inoperability of Post Accident Monitoring (PAM) Instrument)
- ML19116A246 + (SR-2019-001-00 for Palo Verde Nuclear Generating Station (PVNGS) Unit 1, Fuel Building Ventilation System High Range Radioactive Gaseous Effluent Monitor Nonfunctional)
- W3F1-2019-0042, SR-2019-001-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3), Condenser Vacuum Pump High Range Instrument Inoperable for Greater than 7 Days + (SR-2019-001-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3), Condenser Vacuum Pump High Range Instrument Inoperable for Greater than 7 Days)
- ULNRC-06542, SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days + (SR-2019-003 for Callaway Plant, Unit 1, Inoperability of Loose Parts Detection System Channel 3 for Greater than 30 Days)
- RA-20-0042, SR-2020-001 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Non-Functional for Greater than 7 Days + (SR-2020-001 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Non-Functional for Greater than 7 Days)
- W3F1-2022-0044, SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days + (SR-2022-004-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days)
- W3F1-2025-0011, SR-2025-001-00 for Waterford Steam Electric Station, Unit 3, Primary Met Tower Inoperable Greater than 7 Days + (SR-2025-001-00 for Waterford Steam Electric Station, Unit 3, Primary Met Tower Inoperable Greater than 7 Days)
- W3F1-2021-0005, SR-21-002-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3), Log Power Channel D Inoperable for Greater than 30 Days + (SR-21-002-00 for Waterford Steam Electric Station, Unit 3 (Waterford 3), Log Power Channel D Inoperable for Greater than 30 Days)
- W3F1-2022-0008, SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days + (SR-22-001-00, Waterford Steam Electric Station, Unit 3, Radiation Monitors Inoperable Greater than 7 Days)
- W3F1-2022-0042, SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days + (SR-22-003-00 for Waterford Steam Electric Station, Unit 3, Radiation Monitor Inoperable Greater than 7 Days)
- RA-23-0243, SR-370-2023-001 for McGuire Nuclear Station + (SR-370-2023-001 for McGuire Nuclear Station)
- ML20266J171 + (SR-90 Beta Irradiator Model 3MIA Details)
- ML20086S972 + (SR-S1-74-01:on 740526,reactor Vessel Leakoff High Temp Alarm Received.Caused by Inadequacy of Packing Mfg by J Crane Co. Packing Will Be Replaced W/Grafoil Packing)
- ML20086S586 + (SR-S1-74-03:on 740403,safety Injection Experienced Due to Spurious High Steam Flow Signals in Conjunction W/Low Temp Average or Low Steam Line Pressure Signals.Caused by Fluctuations of Steam Flow Signals Above Setpoint)
- ML20086S412 + (SR-S1-74-04:on 740904,sampling of Ventilation Vent Activity Revealed I-131 Activity of 5.8% of Tech Spec Limit.Caused by High Activity of Steam Generator a Blowdown Vent.Primary to Secondary Tube Leak Repaired)
- ML20086S280 + (SR-S1-74-05:deterioration of Steam Generator Tubes Noted. Caused Not Determined.Sludge Deposits & Deleterious Effect of Sodium Phosphate Chemistry Control Contributed to Magnitude & Rate of Deterioration)