Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-6832, Revised Response to NRC Re Violations Noted in Insp Repts 50-445/85-16 & 50-446/85-13,per . Corrective Actions:Nonconformance Repts NCR XI-708,issued on 851114,transferred to NCR M-25650 on 860311 + (Revised Response to NRC Re Violations Noted in Insp Repts 50-445/85-16 & 50-446/85-13,per . Corrective Actions:Nonconformance Repts NCR XI-708,issued on 851114,transferred to NCR M-25650 on 860311)
- ML20065T185 + (Revised Response to NRC Re Violations Noted in IE Insp Rept 50-410/82-08.Submittal Includes Oath of Affirmation)
- ML20196L615 + (Revised Response to NRC Re Violations Noted in Insp Repts 50-327/87-66 & 50-328/87-66.Corrective Actions: Operation Section Ltr Administrative 58 Converted to Administrative Instruction 58)
- 3F0285-09, Revised Response to NRC Re Violations Noted in Insp Rept 50-302/84-29.Corrective actions:SP-317 Data Sheets Corrected to Reflect Appropriate Data & Leakage Recalculated + (Revised Response to NRC Re Violations Noted in Insp Rept 50-302/84-29.Corrective actions:SP-317 Data Sheets Corrected to Reflect Appropriate Data & Leakage Recalculated)
- ML20203K868 + (Revised Response to NRC Re Violations in Insp Rept 70-7002/97-12.CAs:daily Operating Instruction Was Issued to PPSs Directing to Rept Ncsa Violations Unless Demonstrated NCS Controls Specified in Ncsa Were Met)
- RS-06-032, Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations)
- SVPLTR 06-0035, Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to NRC Regulatory Issue Summary 2005-19, Preparation and Scheduling of Operator Licensing Examinations)
- RS-04-150, Revised Response to NRC Regulatory Issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to NRC Regulatory Issue Summary 2004-10 Preparation and Scheduling of Operator Licensing Examinations)
- ML110250263 + (Revised Response to NRC Regulatory Issue Summary 2010-08, Preparation and Scheduling of Operator Licensing Examinations)
- ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations + (Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations)
- WO 13-0065, Revised Response to NRC Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to NRC Regulatory Issue Summary (RIS) 2013-06, Preparation and Scheduling of Operator Licensing Examinations)
- RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations)
- ONS-2016-096, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations)
- PLA-7434, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations)
- ML19163A222 + (Revised Response to NRC Request for Additional Information, Buried Pipe, Related to the Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application)
- RNP-RA/12-0079, Revised Response to NRC Request for Additional Information Related to Relief Request (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan + (Revised Response to NRC Request for Additional Information Related to Relief Request (RR)-2 for the Fifth Ten-Year Interval Inservice Testing Program Plan)
- ML031250421 + (Revised Response to NRC Request for Additional Information 5-1 for Diablo Canyon Independent Spent Fuel Storage Installation Application)
- ML13213A014 + (Revised Response to NRC Request for Additional Information Regarding the Review of the License Renewal Application, Sets 1 and 3)
- LIC-15-0013, Revised Response to NRC Request for Additional Information Regarding License Amendment Request (LAR) 13-03, Revising Method for Controlling Raw Water Intake Cell Level, Dated August 13, 2014 (ML14226A738)(LIC-14-0092) + (Revised Response to NRC Request for Additional Information Regarding License Amendment Request (LAR) 13-03, Revising Method for Controlling Raw Water Intake Cell Level, Dated August 13, 2014 (ML14226A738)(LIC-14-0092))
- ML19163A223 + (Revised Response to NRC Request for Additional Information, Core Shroud Support Fatigue Analysis Reevaluation, Related to the Subsequent License Renewal Application)
- 3F0505-12, Revised Response to NRC Request for Additional Information Regarding Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13 + (Revised Response to NRC Request for Additional Information Regarding Once-Through Steam Generator Tube Inservice Inspection Conducted During Refueling Outage 13)
- CNL-15-236, Revised Response to NRC Request for Additional Information Regarding American Society of Mechanical Engineers Section XI, Inservice Inspection and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-27 + (Revised Response to NRC Request for Additional Information Regarding American Society of Mechanical Engineers Section XI, Inservice Inspection and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-27)
- CNL-17-098, Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels + (Revised Response to NRC Request for Additional Information Related to TVA Fleet License Amendment Request to Adopt NEI 99-01 Revision 6 Emergency Action Levels)
- ML20151U461 + (Revised Response to NUREG-0737,Suppl 1,Section 6.0,Review of Reg Guide 1.97 Application to Emergency Response Facilities,Calvert Cliffs Nuclear Power Plant)
- ML20236L466 + (Revised Response to Notice of Violation from Insp Rept 50-285/87-05,per 870924 Response.Rev Re Response to Violation B(4).Corrective Actions:Util Reviewed Areas of Concern Re Quantitative Vs Qualitative Acceptance Criteria)
- ML031950196 + (Revised Response to Notice of Violation EA-03-058)
- ML20238D931 + (Revised Response to Notice of Violation 50-328/87-37-01 Noted in Insp Repts 50-327/87-37 & 50-328/87-37. Corrective Actions:Meetings Held W/Craft & Mgt Personnel to Ascertain Reason for Noncompliance)
- B18998, Revised Response to Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel Dated April 29, 2003 + (Revised Response to Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel Dated April 29, 2003)
- LIC-19-0003, Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation R + (Revised Response to Orders for Interim Safeguards and Security Compensatory Measures and Implementation of Additional Security Measures Associated with Access Authorization for Fort Calhoun Station Dated 9 November, 2004 and Relaxation Requ)
- LIC-03-0051, Revised Response to Potential Open Items for Review of License Renewal Application for Fort Calhoun, Unit 1 + (Revised Response to Potential Open Items for Review of License Renewal Application for Fort Calhoun, Unit 1)
- ML22293A431 + (Revised Response to RAI 1-g)
- ML17290B268 + (Revised Response to RAI 271-8290 for the Question 19-15 (Rev.3))
- ML17290B270 + (Revised Response to RAI 271-8290 for the Question 19-15 (Rev.3))
- ML18131A113 + (Revised Response to RAI 412-8525 for Question 08.04-15 (Rev. 1))
- SBK-L-13084, Revised Response to RAI B.2.1.3-5 and RAI 4.7.2-1 for License Renewal Application + (Revised Response to RAI B.2.1.3-5 and RAI 4.7.2-1 for License Renewal Application)
- ML20149D919 + (Revised Response to Re Violations Noted in Insp Rept 50-285/97-07 on 970505-09.Corrective Actions:Control Room Operators in Compliance W/License Requirements Were Assigned as Incident Commanders)
- ML18016A439 + (Revised Response to Re Violations Noted in Insp Rept 50-400/98-01.Corrective Actions:Inking Problem W/Chart Recorder LR-477 Was Recognized & Corrected on 971130)
- ML18278A289 + (Revised Response to Regulatory Issue Summary (RIS) 2018-02, Preparation and Scheduling of Operator Licensing Examinations - Update)
- RNP-RA/12-0060, Revised Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations)
- RNP-RA/12-0015, Revised Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations)
- RS-02-141, Revised Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations + (Revised Response to Regulatory Issue Summary 2002-09, Preparation and Scheduling of Operator Licensing Examinations)
- ML12159A122 + (Revised Response to Regulatory Issues Summary (RIS) 2011-04, Preparation and Scheduling of Operator Licensing Examinations)
- PNP 2014-035, Revised Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors + (Revised Response to Request for Additional Information - License Amendment Request to Adopt NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactors)
- ONS-2015-053, Revised Response to Request for Additional Information (RAI) Associated with License Amendment Request (LAR) Regarding Keowee Hydro Unit (Khu) Steady State Frequency Requirements + (Revised Response to Request for Additional Information (RAI) Associated with License Amendment Request (LAR) Regarding Keowee Hydro Unit (Khu) Steady State Frequency Requirements)
- ML11145A163 + (Revised Response to Request for Additional Information Question 3 Regarding Final Safety Analysis Report Section 2.4)
- ML11312A243 + (Revised Response to Request for Additional Information (RAI) Long-Term Actions to Address Seismic Analysis Considering the August 23, 2011 Earthquake)
- NOC-AE-03001618, Revised Response to Request for Additional Information Regarding a Proposed Amendment to Technical Specification 3.4.2.2 + (Revised Response to Request for Additional Information Regarding a Proposed Amendment to Technical Specification 3.4.2.2)
- ML032760236 + (Revised Response to Request for Additional Information Regarding a Proposed Amendment to Technical Specification 3.4.2.2)
- SBK-L-06132, Revised Response to Request for Additional Information Regarding Emergency License Amendment Request 06-07, Containment Enclosure Emergency Air Cleanup System Allowed Outage Time One Time Change + (Revised Response to Request for Additional Information Regarding Emergency License Amendment Request 06-07, Containment Enclosure Emergency Air Cleanup System Allowed Outage Time One Time Change)
- RA-18-0246, Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature + (Revised Response to Request for Additional Information: Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure- Temperature Limit Curves to a Pressure & Temperature)
- CNL-17-093, Revised Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (ABGTS) + (Revised Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (ABGTS))