Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18227D284 + (Request to Grant Approval for Continued Operation Beyond Time Limit Specified in Amendment 20)
- NLS2018061, Request to Grant Emergent Relief from, and Authorize Alternative to Inservice Inspection Code Requirement + (Request to Grant Emergent Relief from, and Authorize Alternative to Inservice Inspection Code Requirement)
- ML19339A774 + (Request to Honor Encl Ma Chinnery 801023 Desire to Be Called as ASLB Witness.Board Should Provide Assistance to Trifunac Re Points of Testimony.Responds to Applicant & NRC Procedural Points)
- ML051260210 + (Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval)
- ML043350363 + (Request to Implement 2ISI-29 Addressing ASME Section XI, IWA-5213, Test Condition Holding Times, for the Second Inservice Inspection Interval)
- ML043350364 + (Request to Implement 2ISI-30 Addressing Use of Subsequent ASME Section XI Edition and Addenda for Code Category B-P)
- GO2-05-020, Request to Implement 2ISI-31 Addressing Use of Subsequent ASME Section XI Edition and Addenda for Code Category C-H + (Request to Implement 2ISI-31 Addressing Use of Subsequent ASME Section XI Edition and Addenda for Code Category C-H)
- ML031880829 + (Request to Implement CR-38 Addressing Boiling Water Reactor Shelf Weld Inspection Recommendations of Boiling Water Reactor Vessel & Internals Project Report BWRVIP-05)
- NG-04-0103, Request to Implement NDE-R047 Addressing Boiling Water Reactor Shell Weld Inspection Recommendations of the Boiling Water Reactor Vessel & Internals Project (BWRVIP) Report BWRVIP-05 + (Request to Implement NDE-R047 Addressing Boiling Water Reactor Shell Weld Inspection Recommendations of the Boiling Water Reactor Vessel & Internals Project (BWRVIP) Report BWRVIP-05)
- B18987, Request to Implement a Risk-Informed Inservice Inspection Program Plan as an Alternative to ASME Code Section XI Requirements + (Request to Implement a Risk-Informed Inservice Inspection Program Plan as an Alternative to ASME Code Section XI Requirements)
- NL-06-2496, Request to Implement an Alternative Source Term Atmospheric Dispersion Factor Information + (Request to Implement an Alternative Source Term Atmospheric Dispersion Factor Information)
- NL-08-1269, Request to Implement an Alternative Source Term Response to Requests for Additional Information Regarding Turbine Building Ventilation Exhaust Systems and Operating License Changes + (Request to Implement an Alternative Source Term Response to Requests for Additional Information Regarding Turbine Building Ventilation Exhaust Systems and Operating License Changes)
- NL-08-0634, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Radiological Consequences Analyses + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Radiological Consequences Analyses)
- NL-07-1389, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Radiological Consequences Analyses + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Radiological Consequences Analyses)
- NL-07-1532, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Turbine Building Ventilation and Standby Liquid Control Systems + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Turbine Building Ventilation and Standby Liquid Control Systems)
- NL-08-0903, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Turbine Building Ventilation Exhaust System Fans + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Turbine Building Ventilation Exhaust System Fans)
- NL-08-0035, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Unit 1 Main Steam Isolation Valve Alternate Leakage Treatment Seismic Evaluation + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Unit 1 Main Steam Isolation Valve Alternate Leakage Treatment Seismic Evaluation)
- NL-07-1308, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Unit 1 Main Steam Isolation Valve Alternate Leakage Treatment Path Seismic Evaluation + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Unit 1 Main Steam Isolation Valve Alternate Leakage Treatment Path Seismic Evaluation)
- NL-07-1200, Request to Implement an Alternative Source Term, Response to Request for Additional Information Regarding the Unit 1 Main Steam Isolation Valve Alternate Leakage Treatment Path Evaluation + (Request to Implement an Alternative Source Term, Response to Request for Additional Information Regarding the Unit 1 Main Steam Isolation Valve Alternate Leakage Treatment Path Evaluation)
- NL-07-1949, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Turbine Building Ventilation and Leakage Treatment Piping Seismic Evaluations + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Turbine Building Ventilation and Leakage Treatment Piping Seismic Evaluations)
- NL-08-0031, Request to Implement an Alternative Source Term Response for Additional Information Regarding Atmospheric Dispersion Factors + (Request to Implement an Alternative Source Term Response for Additional Information Regarding Atmospheric Dispersion Factors)
- NL-06-2750, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Suppression Pool Ph Control Analysis + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Suppression Pool Ph Control Analysis)
- NL-08-0351, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Power Sources for the Turbine Building Ventilation System + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Power Sources for the Turbine Building Ventilation System)
- NL-07-0894, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Power Sources for the Turbine Building Ventilation System + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding the Power Sources for the Turbine Building Ventilation System)
- NL-07-1354, Request to Implement an Alternative Source Term Response to Request for Additional Information Re the Development of Atmospheric Dispersion Factors + (Request to Implement an Alternative Source Term Response to Request for Additional Information Re the Development of Atmospheric Dispersion Factors)
- NL-06-1637, Request to Implement an Alternative Source Term + (Request to Implement an Alternative Source Term)
- NL-06-2550, Request to Implement an Alternative Source Term Radtrad Input Files + (Request to Implement an Alternative Source Term Radtrad Input Files)
- NL-08-0524, Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding Atmospheric Dispersion Factors + (Request to Implement an Alternative Source Term Response to Request for Additional Information Regarding Atmospheric Dispersion Factors)
- ML12047A119 + (Request to Include Atlantic Sturgeon in Ongoing Informal Section 7 Consultation for Pilgrim Nuclear Power Station)
- ML12060A121 + (Request to Include Atlantic Sturgeon in Ongoing Formal Section 7 Consultation at the Salem Nuclear Generating Station, Units 1 and 2)
- GO2-04-065, Request to Incorporate ASME Code Case N-663 in Columbias Second Ten-Year Interval Inservice Inspection Program Plan + (Request to Incorporate ASME Code Case N-663 in Columbias Second Ten-Year Interval Inservice Inspection Program Plan)
- ML11151A202 + (Request to Incorporate Later Editions and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI, Into the Fourth 10-Year Inservice Inspection Program Interval)
- RNP-RA/11-0042, Request to Incorporate Later Editions and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI Into the Fourth Ten-Year Inservice Inspection Program Interval + (Request to Incorporate Later Editions and Addenda of the ASME Boiler and Pressure Vessel Code, Section XI Into the Fourth Ten-Year Inservice Inspection Program Interval)
- TSTF-17-06, Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications + (Request to Incorporate TSTF-565, Clarify the Term Operational Convenience in the LCO 3.0.2 Bases, Into the Standard Technical Specifications)
- ML20199E444 + (Request to Indefinitely Continue Temporary Automatic Stay as to ASLB Authorization of Full Power Operations Until Commission Resolves Issue Raised in Encl Comments on Immediate Effectiveness Review)
- ML12053A345 + (Request to Initiate Abbreviated EFH Consultation for Proposed Extended Power Uprate at St. Lucie Plant, Units 1 and 2)
- ML12075A022 + (Request to Initiate Formal Section 7 Consultation at the St. Lucie Plant, Units 1 and 2)
- ML112280292 + (Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate)
- ML112280501 + (Request to Initiate Informal Section 7 Consultation for the Proposed Turkey Point Plant Units 3 and 4 Extended Power Uprate (ME4907 and ME4908) Encl)
- ML12060A131 + (Request to Initiate Informal Section 7 Consultation for Atlantic Sturgeon at Surry Power Station, Units 1 and 2)
- ML24012A036 + (Request to Initiate Section 106 Consultation and Scoping Process for the Environmental Review License Renewal Application)
- ML23009B607 + (Request to Initiate Section 106 Consultation for Abilene Christian University Molten Salt Research Reactor Construction Permit Application (Docket No. 05000610))
- ML24009A179 + (Request to Initiate Section 106 Consultation for Kairos Power Proposed Non-Power Test Reactors (Hermes 2) Construction Permit Review in Roane County, Tennessee)
- ML24008A147 + (Request to Initiate Section 106 Consultation for Kairos Power Proposed Non-Power Test Reactors (Hermes 2) Construction Permit Review in Roane County, Tennessee)
- ML24008A113 + (Request to Initiate Section 106 Consultation for Kairos Power Proposed Non-Power Test Reactors (Hermes 2) Construction Permit Review in Roane County, Tennessee)
- ML24054A061 + (Request to Initiate Section 106 Consultation Regarding the License Termination Plan for Crystal River Unit 3 in Citrus County, Florida)
- ML22031A289 + (Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review)
- ML22031A288 + (Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review)
- ML22031A287 + (Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review)
- ML22031A286 + (Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review)
- ML24114A090 + (Request to Initiate Section 106 Consultation and Scoping Process for Terrapower Kemmerer Power Station Unit 1 Construction Permit Review in Lincoln County, Wyoming)