|
---|
Category:Letter
MONTHYEARML23338A2542023-12-14014 December 2023 Letter - Kairos Power LLC - Issuance of Construction Permit for Hermes Test Reactor ML23328A3972023-11-24024 November 2023 Request for Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power, LLC Hermes Non-Power Reactor Facility ML23328A3982023-11-24024 November 2023 Request for Withholding Information from Public Disclosure Kairos Power LLC Postulated Event Analysis Methodology Technical Report, Kp TR 018 P ML23317A1672023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Salt Spills from Chapters 4 and 13 on Hermes Preliminary Safety Analysis Report ML23317A4202023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Question on Decay Heat Removal Testing from Audit on Hermes PSAR Section 6.3 ML23317A4212023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Response to NRC Request for Additional Information 350 on Hermes Preliminary Safety Analysis Report ML23317A4232023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Response to NRC Question on Fluidic Diode Testing and PSAR Chapter 4 Changes ML23321A2442023-11-17017 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to Hermes Construction Permit Application Financial Information ML23313A1232023-11-16016 November 2023 Request from Withholding Information from Public Disclosure - Enclosures of the Construction Permit Application for the Kairos Power LLC Non-Power Reactor Facility ML23313A1972023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23313A2072023-11-16016 November 2023 Request for Withholding Information from Public Disclosure - Kairos Power LLC, Changes to KP-FHR Core Design and Analysis Methodology Technical Report KP-TR-017-P ML23268A0092023-11-0303 November 2023 Kairos Power, LLC - Approval of Kairos Power Safeguards Information Protection Plan ML23310A0742023-11-0202 November 2023 Letter to THC NHPA Section 106 Consultation Summary for the Hermes CP Review Redacted ML23304A2502023-10-25025 October 2023 NHPA Section 106 Consultation Summary for the Kairos Hermes CP Review - Redacted ML23268A3272023-09-25025 September 2023 Letter from EPA Regarding Kairos Hermes CP Feis ML23230A7092023-08-21021 August 2023 Ltr to Alabama-Quassarte Tribal Town, Notification of Issuance of the Feis for the Construction Permit ML23195A0762023-08-17017 August 2023 Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor ML23199A0062023-08-17017 August 2023 Letter to USFW Mary Jennings Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0132023-08-17017 August 2023 Letter to NPS Niki S. Nicholas Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0292023-08-17017 August 2023 Letter to Achp Blythe Semmer Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23199A0352023-08-17017 August 2023 Letter to THC E. Patrick Mcintyre Kairos Hermes CP Review-Notice of Issuance of Final Environmental Impact Statement ML23201A1372023-08-17017 August 2023 Letter to Absentee Shawnee Tribe, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit ML23214A1382023-08-17017 August 2023 Ltr to Alabama-Coushatta Tribe of Texas, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tennessee ML23214A1402023-08-17017 August 2023 Ltr to Cherokee Nation, Notification of Issuance of Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1412023-08-17017 August 2023 Letter to Coushatta Tribe of Louisiana, Notification of Issuance of the Final Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1422023-08-17017 August 2023 Ltr to Eastern Band of Cherokee Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1492023-08-17017 August 2023 Ltr to Eastern Shawnee Tribe of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1502023-08-17017 August 2023 Ltr to Jena Band of Choctaw Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1512023-08-17017 August 2023 Ltr to Kialegee Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1532023-08-17017 August 2023 Ltr to Muscogee Creek Nation, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1592023-08-17017 August 2023 Ltr to Poarch Band of Creek Indians, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1602023-08-17017 August 2023 Ltr to Seminole Nation of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1612023-08-17017 August 2023 Ltr to Seminole Tribe of Florida, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1622023-08-17017 August 2023 Ltr to Shawnee Tribe, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1632023-08-17017 August 2023 Ltr to Thlopthlocco Tribal Town, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23214A1692023-08-17017 August 2023 Ltr to United Keetoowah Band of Cherokee Indians of Oklahoma, Notification of Issuance of the Feis for the Construction Permit for the Kairos Hermes Test Reactor in Oak Ridge, Tn ML23195A0152023-08-17017 August 2023 Letter to Environmental Protection Agency, Notification of the Issuance of the Final EIS for the Construction Permit for Kairos Hermes Test Reactor ML23178A0962023-06-23023 June 2023 Kairos Power, LLC - Supplemental Information for Environmental Report ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application ML23151A7442023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 ML23139A2272023-05-19019 May 2023 Kairos Power LLC, Presentation Materials for the May 22, 2023 Pre?Submittal Meeting on Kairos Power Fuel Qualification Supporting the Hermes Operating License Application ML23117A0482023-04-27027 April 2023 Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards on Hermes Preliminary Safety Analysis Report ML23118A3232023-04-27027 April 2023 Kairos Power LLC, Submittal of Safeguards Information Protection Plan ML23115A3942023-04-25025 April 2023 Kairos Power, LLC - Transmittal of Changes to Preliminary Safety Analysis Report ML23102A2392023-04-11011 April 2023 Kairos Power LLC, Presentation Materials for Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Section 12.9 and Chapter 13 ML23089A3872023-03-30030 March 2023 Kairos Power LLC, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 ML23088A0682023-03-28028 March 2023 Kairos Power LLC, Transmitatl of Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 5, 7, 8, and 11 ML23076A2182023-03-15015 March 2023 Kairos Power, LLC, Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes Preliminary Safety Analysis Report Chapters 1, 2, 3, 4, 6, and 9 ML23062A7342023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Graphite Material Qualification for the KP-FHR ML23062A7302023-03-13013 March 2023 Transmittal Letter for Final Safety Evaluation of Metallic Material Qualification for the KP-FHR 2023-09-25
[Table view] Category:Map
MONTHYEARML22169A0092022-04-12012 April 2022 NPS Scoping Comments on Kairos Test Reactor ML22031A2882022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review ML22031A2862022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review ML22031A2872022-03-0404 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review ML22157A4712021-06-21021 June 2021 Oak Ridge Zoning Map: Reference for Kairos CP Application 2022-04-12
[Table view] Category:Photograph
MONTHYEARML22117A2172022-04-22022 April 2022 Kairos Power LLC, Supplemental Information for HCUL-10 for the Hermes Environmental Review ML22031A2882022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review ML22031A2862022-03-10010 March 2022 Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review 2022-04-22
[Table view] |
Text
March 4, 2022 E. Patrick McIntyre, Jr.
Executive Director and State Historic Preservation Officer State Historic Preservation Office 2941 Lebanon Pike Nashville, TN 37214
SUBJECT:
REQUEST TO INITIATE SECTION 106 CONSULTATION AND SCOPING PROCESS FOR KAIROS POWER HERMES NON-POWER TEST REACTOR CONSTRUCTION PERMIT REVIEW IN ROANE COUNTY, TENNESSEE (DOCKET NUMBER: 50-7513)
Dear E. Patrick McIntyre,
Jr.:
The U.S. Nuclear Regulatory Commission (NRC) is conducting an environmental review for a construction permit application submitted by Kairos Power, LLC (Kairos) for the proposed Hermes non-power demonstration reactor. The application was submitted by Kairos in a letter dated September 29, 2021, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Domestic Licensing of Production and Utilization Facilities.
Additionally, by letter dated October 31, 2021, Kairos submitted an environmental report in support of its Hermes construction permit application. The facility, if licensed, would be constructed on a site within the East Tennessee Technology Park (ETTP) in Oak Ridge, Roane County, Tennessee (See Enclosure 1).
The application is available through the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible at http://www.nrc.gov/readingrm/adams.html. The environmental report portion of the application is listed under ADAMS Accession No. ML21306A131. The environmental report is also available on the Internet at https://www.nrc.gov/docs/ML2130/ML21306A131.html.
As part of the review, the NRC staff is preparing an environmental impact statement (EIS) as required by 10 CFR Part 51, Environmental Protection Regulations for Domestic Licensing and Related Regulatory Functions, the NRCs regulations that implement the National Environmental Policy Act (NEPA) of 1969, as amended. In accordance with 36 CFR 800 Protection of Historic Properties Section 800.8(c), the NRC is using the NEPA process to comply with Section 106 of the National Historic Preservation Act of 1966, as amended (NHPA), in lieu of the procedures set forth in 36 CFR 800.3 through 800.6. The EIS will include identification of historic and cultural resources and historic properties, an analysis of potential effects of the proposed action, including potential effects on historic and cultural resources and historic properties as well as the NRC staffs preliminary determination. The purpose of this letter is to initiate NHPA Section 106 consultation with your office and to invite you to participate in the environmental scoping process pursuant to 10 CFR 51.28(a).
E.P. McIntyre, Jr. 2 The proposed Kairos Hermes site is located within the ETTP in the northwest quadrant of the Oak Ridge Reservation, is adjacent to the Clinch River arm of Watts Bar Reservoir in Roane County and is approximately 13 miles west of downtown Oak Ridge Tennessee (see Enclosure 2). The site comprises approximately 185 acres and is located on a parcel that previously housed buildings K-31 and K-33, which were part of the K-25 complex and operated as the Oak Ridge Gaseous Diffusion Plant. Uranium enrichment operations at the K-25 site ceased in 1986, and restoration, decontamination, and decommissioning activities began soon thereafter. Reindustrialization of the ETTP began in 1996 by U.S.
Department of Energy in cooperation with the Community Reuse Organization of East Tennessee in preparation for conversion of the site to a private sector industrial park, to be called the Heritage Center. The ETTP has been transformed into a multi-use industrial park and conservation area. The proposed Hermes site is located across Poplar Creek and west of the Manhattan Project National Historic Park (see Enclosure 3). The NRC has defined the direct and indirect area of potential effects for this construction permit review as the area at the Hermes reactor site and its immediate environs, which may be directly or indirectly impacted by land-disturbing and building activities associated with the construction and operation of the proposed facility.
The NRC invites you to submit any comments on the scope of the environmental review by April 19, 2022. Comments may be submitted by any of the following methods:
Email comments to: KairosHermes-CPEIS@nrc.gov; or Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S.
Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff; or Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2021-0193.
The NRC expects to publish the draft EIS in November 2022. A copy of the draft EIS will be made available for your review and comment. After consideration of public comments, the NRC will prepare a final EIS, which is scheduled to be published in September 2023.
The NRC staff also plans to conduct a public outreach and environmental scoping meeting.
The meeting is currently expected to be held on March 23, 2022. Meeting details will be available by March 11, 2022 at https://www.nrc.gov/reactors/non-power/kairos-hermes.html or at the NRCs Public Meeting Schedule website at https://www.nrc.gov/pmns/mtg.
E.P. McIntyre, Jr. 3 If you have any questions concerning the NRCs Section 106 consultation and associated historic and cultural resources review, please contact Ms. Jennifer Davis, staff archaeologist at 301-415-3835 or by e-mail at Jennifer.Davis@nrc.gov; or Mr. Peyton Doub, Ecologist at 301-415-6703 or by e-mail at Peyton.Doub@nrc.gov.
Sincerely, Folk, Kevin signing on behalf of Erwin, Kenneth on 03/04/22 Kenneth Erwin, Chief, Environmental Review New Reactor Branch Division of Rulemaking, Environment, and Financial Support, Office of Nuclear Material Safety and Safeguards Docket No. 50-7513
Enclosures:
- 1. Figure 1.1-1: Site Location
- 2. Figure 2.2-1: Hermes Reactor Site
- 3. Figure 3.6-1: Manhattan Project National Historical Park cc w/encls:
Ms. Kelley Reid Section 106 Review State Historic Preservation Office 2941 Lebanon Pike Nashville, TN 37214 Jennifer Barnett, Federal Programs Archaeologist Tennessee Division of Archaeology 1216 Foster Ave Cole Building 3 Nashville, TN 37243
ML22031A288 *via email OFFICE NMSS/REFS NMSS/REFS NMSS/REFS NMSS/REFS OGC NAME JDavis AWalker-Smith PDoub KErwin RHarper DATE 02/07/2022 02/08/2022 02/09/2022 02/09/2022 02/23/2022 OFFICE NMSS/REFS NMSS/REFS NAME JDavis KErwin (KFolk for)
DATE 03/04/2022 03/04/2022 Figure 1.1-1: Site Location ENCLOSURE 1
Figure 2.2-1: Hermes Reactor Site ENCLOSURE 2
Figure 3.6-1: Manhattan Project National Historical Park ENCLOSURE 3