Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20364A040 + (Request for Relief Request N1-I4-LMT-003 Inservice Inspection Limitations)
- ML20350B806 + (Request for Relief Request N1-I5-NDE-002 Inservice Inspection Alternative)
- ML24163A300 + (Request for Relief Request N1-I5-NDE-007 Inservice Inspection Alternative)
- ML22196A197 + (Request for Relief Request N2-I4-LMT-004 Inservice Inspection Limitations)
- ML060890203 + (Request for Relief Request No. VRR-15 for Regarding Check Valves Related to the Third 10-Year Inservice Testing Program)
- ML20031E784 + (Request for Relief Request P-9 to Defer Performance of Comprehensive Pump Test)
- ML19142A307 + (Request for Relief Request RR-ENG-3-23 to Extend Volumetric Examination Interval for Reactor Vessel Closure Head Nozzles)
- LR-N19-0083, Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval + (Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval)
- EPID:L-2019-LLR-0091 + (Request for Relief S1-I4R-191 from Alloy 690 PWR Reactor Vessel Head Inspection Interval, Fourth 10-year Interval)
- ML063450407 + (Request for Relief Use of Later Edition and Addenda of ASME Code for Examination of Cast Austenitic Stainless Steel Piping)
- ML040860161 + (Request for Relief VRR 03-01 on a One Time Basis for Performing Inservice Testing of Relief Valve 1RH-861C)
- 2CAN080803, Request for Relief VRR-ANO2-2008-1 Frequency of Leak Rate Testing of the Service Water Boundary Isolation Valves + (Request for Relief VRR-ANO2-2008-1 Frequency of Leak Rate Testing of the Service Water Boundary Isolation Valves)
- 2CAN100901, Request for Relief VRR-ANO2-2009-1, Frequency of Leak Rate Testing of the Service Water Boundary Isolation Valves + (Request for Relief VRR-ANO2-2009-1, Frequency of Leak Rate Testing of the Service Water Boundary Isolation Valves)
- ML080510161 + (Request for Relief W3-ISI-004, Alternative to Requirements to Allow Extension to Second 10-Year Inservice Inspection Interval Beyond That Currently Allowed by ASME Code, Paragraph IWA-2340(d))
- CNL-15-119, Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2 + (Request for Relief WBN-2/PSI-3 for Inaccessible Steam Generator Lower Shell-to-Cone Weld SG-4B-5-2)
- ML24191A456 + (Request for Relief and Alternative Requirements for Squib (Explosively Actuated) Valves First Test Interval)
- NL-24-0060, Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03) + (Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03))
- EPID:L-2024-LLR-0016 + (Request for Relief and Alternative Requirements for Squib Valves First Test Interval (V34-IST-ALT-03))
- ML18352A746 + (Request for Relief and Rescission of Commission Order Modifying Licenses with Regard to Requirements for Beyond-Design-Basis External Events (Order EA-12-049))
- RA-18-059, Request for Relief and Rescission of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (Request for Relief and Rescission of Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events)
- ML19148A694 + (Request for Relief for Coverage of Nozzle-To-Vessel Weld Examinations)
- RS-16-249, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy + (Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy)
- RS-17-168, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1) + (Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1))
- ML17360A128 + (Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1))
- RS-17-080, Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 1 O CFR 50.55a(z)(1) + (Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 1 O CFR 50.55a(z)(1))
- ULNRC-05024, Request for Relief for Plant Inservice Inspection Program + (Request for Relief for Plant Inservice Inspection Program)
- CNL-15-057, Request for Relief for Reactor Pressure Vessel Flange Seal Leak-Off Piping + (Request for Relief for Reactor Pressure Vessel Flange Seal Leak-Off Piping)
- ML072820108 + (Request for Relief for Snubber Visual Examination and Functional Testing Related to the Third 10-year Interval Inservice Inspection Program)
- ML062850096 + (Request for Relief for the In-Service Inspection Program and Approval to Use the Alternative Requirements of ASME Code Case N-513-2)
- NOC-AE-03001468, Request for Relief from ASME Boiler & Pressure Vessel Code, Section XI Requirements for Essential Cooling Water System (Relief Request RR-ENG-2-29) + (Request for Relief from ASME Boiler & Pressure Vessel Code, Section XI Requirements for Essential Cooling Water System (Relief Request RR-ENG-2-29))
- ML030690380 + (Request for Relief from ASME Boiler & Pressure Vessel Code, Section XI Requirements for Essential Cooling Water System (Relief Request RR-ENG-2-29))
- RBG-47284, Request for Relief from ASME Boiler & Pressure Vessel Code Section III + (Request for Relief from ASME Boiler & Pressure Vessel Code Section III)
- RBG-47197, Request for Relief from ASME Boiler & Pressure Vessel Code Section III + (Request for Relief from ASME Boiler & Pressure Vessel Code Section III)
- ML13239A074 + (Request for Relief from ASME Boiler & Pressure Vessel Code Section III)
- NOC-AE-01001181, Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for Weld Examinations (Relief Request RR-ENG-38) + (Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for Weld Examinations (Relief Request RR-ENG-38))
- ML012690265 + (Request for Relief from ASME Boiler and Pressure Vessel Code Section XI Requirements for Weld Examinations (Relief Request RR-ENG-38))
- NOC-AE-05001899, Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40) + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40))
- ML052130207 + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section Xl Requirements for the Essential Cooling Water System (Ecw Train 1 C) (Relief Request RR-ENG-2-40))
- NOC-AE-05001919, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A) + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A))
- ML052590158 + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Ecw Train 1A))
- NOC-AE-07002189, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-49) + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-49))
- ML072600151 + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-49))
- ML070790035 + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, System Leakage Test Prior to Plant Startup Following a Reactor Refueling Outage, Relief Request No. RR 4-5 (TAC 2408))
- RNP-RA/08-0018, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, Subsections IWE and Iwl Requirements for Containment Inspections + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, Subsections IWE and Iwl Requirements for Containment Inspections)
- NOC-AE-05001936, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-42) + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-42))
- ML053110270 + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-42))
- NOC-AE-03001644, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-38) + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-38))
- ML033580012 + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-38))
- NOC-AE-06002070, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-47) + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-47))
- ML063250344 + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI Requirements for the Essential Cooling Water System (Relief Request RR-ENG-2-47))
- RA-11-002, Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Program Interval (Relief Request No. RR-23) + (Request for Relief from ASME Boiler and Pressure Vessel Code, Section XI, for the Fourth Ten-Year Inservice Inspection Program Program Interval (Relief Request No. RR-23))