ML17360A128

From kanterella
Jump to navigation Jump to search
Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)
Date released: 01/04/2018 Download: ML17360A128


Attachment 6: Areva Document 51-9263014-000, PWSCC Evaluation of Uhp Cavitation Peening for Byron and Braidwood Reactor Vessel Head Penetrations (Non-Proprietary)
ML17360A174
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/07/2016
From:
AREVA
To:
Office of Nuclear Reactor Regulation
References
RS-17-168
Download: ML17360A174 (19)
Request for Relief for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles with Mitigated Alloy 600/82/182 Peened Surfaces in Accordance with 10 CFR 50.55a(z)(1)
ML17360A173
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 12/20/2017
From: Gullott D
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RS-17-168
Download: ML17360A173 (42)