Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031E130 + (Request for Order Postponing Effectiveness of 810930 Amend Until NFS Has Nad Opportunity for Hearing.Section 204 of 10CFR2 Requires Hearing Be Granted to Licensee Before Amend Is Issued.Certificate of Svc Encl)
- ML19350D241 + (Request for Order Rejecting 810330 Eia on TMI-1 Restart.Eia Incomplete & Superficial & Recants NUREG-0552 Conclusions. in Alternative,Question Should Be Certified to Commission.Fr Policy Statements Encl)
- ML19350D242 + (Request for Order Rejecting 810330 Eia on TMI-1 Restart.Eia Incomplete & Superficial & Recants NUREG-0552 Conclusions. in Alternative,Question Should Be Certified to Commission.Fr Policy Statements Encl)
- ML20004B723 + (Request for Order Requiring NRC to Answer Porter County Chapter Intervenors First Set of Interrogatories.Related Correspondence)
- ML18192A670 + (Request for Order Requiring Petitioner to Cure Petition Defects as Respects NRC Rules of Practice)
- ML19347B456 + (Request for Order Requiring Renotice of Significantly Increased & Modified Spent Fuel Pool Compaction & Storage Scheme.Certification of Svc Encl)
- ML19344B181 + (Request for Order Requiring State of Il Answer 800715 Interrogatories.Il 800804 Responses Were Evasive & Vague. Mhb Rept,Upon Which Answers Based,Irrelevant to Existing Spent Fuel Pool.Certificate of Svc Encl)
- ML20003D186 + (Request for Order Setting Time Period for Filing Brief in Opposition to Exceptions to Partial Initial Decision.Date Should Run from Filing of Last Brief in Support of Exceptions.Granted for ASLAB,810309)
- ML20003D218 + (Request for Order That Time Frame for Applicants to File Brief Opposing Exceptions from Partial Initial Decision Will Run from Date Last Supporting Brief Was Filed.One Brief Will Respond to All Exceptions.W/Certificate of Svc)
- ML100490068 + (Request for Order for Indirect Transfer of License)
- ML19350C835 + (Request for Order to Compel & to Require Supplementation to Util 810309 Response to Intervenor Citizens Association for Sound Energy 810217 Fourth Set of Interrogatories. Certificate of Svc Encl.Related Correspondence)
- ML19345A728 + (Request for Order to Compel Applicant,Nuclear Engineering Co,To Answer 801010 Request for Designation of Witnesses to Be Used at Hearing.Certificate of Svc Encl)
- ML19338F566 + (Request for Order to Compel Production of Documents from Util.Util Must Produce Documents Over Which Util Has Control Even If Not in Util Possession.Cause for Protective Order Not Shown.W/Cerfificate of Svc.Related Correspondence)
- ML19351F745 + (Request for Order to Immediately Produce Matls Withheld by Pg&E.Northern CA Power Agency Will Voluntarily Produce Like Documents Withheld by Any Specified Date.Documents Not Subj to Privilege.Certificate of Svc Encl)
- ML19224D134 + (Request for Order to Show Cause Why CP for Proposed Nuclear Power Plant at Seabrook Should Not Be Suspended or Revoked)
- ML20040F846 + (Request for Order to Show Cause Why CPs for Proposed Nuclear Power Plants Should Not Be Suspended or Revoked)
- RA-19-057, Request for Oyster Creek Nuclear Generating Station 10 CFR Part 71 Quality Assurance Program Approval - Radioactive Material Packages + (Request for Oyster Creek Nuclear Generating Station 10 CFR Part 71 Quality Assurance Program Approval - Radioactive Material Packages)
- ML21243A543 + (Request for Partial Exemption from 10 CFR 50.62(c)(1) Risk-Informed Process for Evaluations (RIPE))
- ZS-2013-0207, Request for Partial Exemption from 10 CFR 50.82(a)(8)(i)(A) and Request for Notice of Enforcement Discretion + (Request for Partial Exemption from 10 CFR 50.82(a)(8)(i)(A) and Request for Notice of Enforcement Discretion)
- ML043310155 + (Request for Partial Exemption from 10 CFR 50.71(c) Recordkeeping Requirements (TAC No. L52635))
- NL-19-043, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 + (Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12)
- PNP 2021-020, Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12 + (Request for Partial Exemption from Record Retention Requirements in 10 CFR 50.12)
- NG-19-0141, Request for Partial Exemption from Record Retention Requirements for Duane Arnold Energy Center + (Request for Partial Exemption from Record Retention Requirements for Duane Arnold Energy Center)
- EPID:L-2020-LLE-0007 + (Request for Partial Exemption from Record Retention Requirements for Duane Arnold Energy Center)
- ML19044A374 + (Request for Partial Exemption from Record Retention Requirements)
- BVY 15-006, Request for Partial Exemption from Record Retention Requirements + (Request for Partial Exemption from Record Retention Requirements)
- 3F0916-01, Request for Partial Exemption from Record Retention Requirements + (Request for Partial Exemption from Record Retention Requirements)
- EPID:L-2019-LLE-0002 + (Request for Partial Exemption from Record Retention Requirements)
- SBK-L-10102, Request for Partial Exemption from Search Requirements for Entry Into Dry Fuel Storage Area + (Request for Partial Exemption from Search Requirements for Entry Into Dry Fuel Storage Area)
- HBL-16-008, Request for Partial Release of Humboldt Bay Power Plant Unit 3 Property from the Part 50 Site + (Request for Partial Release of Humboldt Bay Power Plant Unit 3 Property from the Part 50 Site)
- ML18215A187 + (Request for Partial Site Release)
- ML18215A218 + (Request for Partial Site Release)
- ML071430210 + (Request for Partial Site Release)
- U-604034, Request for Partial Site Release + (Request for Partial Site Release)
- ZS-2015-0134, Request for Partial Site Release + (Request for Partial Site Release)
- RS-23-073, Request for Partial Site Release + (Request for Partial Site Release)
- ML20052D015 + (Request for Partial Site Release)
- ML18183A468 + (Request for Partial Site Release)
- ML16181A068 + (Request for Partial Site Release)
- ML25245A104 + (Request for Partial Site Release)
- ML25245A104 + (Request for Partial Site Release)
- LIC-18-0030, Request for Partial Site Release Phase 2 + (Request for Partial Site Release Phase 2)
- EPID:L-2018-DSR-0000 + (Request for Partial Site Release Phase 2)
- ML17115A108 + (Request for Partial Site Release from Part 50 License (CAC L53153))
- ML072400139 + (Request for Partial Site Release in Accordance with 10 CFR 50.83)
- ML20097C984 + (Request for Partial Waiver of 811113 Confidentiality Order, Except for Individuals O,W & Yy.Granted by Iw Smith.Served on 840914)
- ML20097E324 + (Request for Partial Waiver of Confidentiality Order. Certificate of Svc Encl)
- ML20097C664 + (Request for Partial Waiver of Confidentiality Order.Licensee Agrees to Screen Documents to Avoid Disclosure of Identities of O,W & Yy.Certificate of Svc Encl)
- RNP-RA/06-0104, Request for Partial Withdrawal of Technical Specifications Change to Core Operating Limits Report References + (Request for Partial Withdrawal of Technical Specifications Change to Core Operating Limits Report References)
- ML19209B867 + (Request for Participant Status in Public Hearing)
- ML110670403 + (Request for Participation in the Environmental Review of the Proposed 40-Year License Renewal for Calvert Cliffs Independent Spent Fuel Storage Installation)
- ML22033A246 + (Request for Participation in the Environmental Scoping Process for the Proposed Kairos Hermes Test Reactor Site, Construction Permit Application Review)
- ML22033A241 + (Request for Participation in the Environmental Scoping Process, and a List of Protected Species within the Area Under Evaluation for, the Proposed Kairos Hermes Test Reactor Site)
- ML040790721 + (Request for Party Status and Designation of Representative, Per Millstone, Units 2 and 3, Applications for Renewed Operating Licenses)
- ML050210284 + (Request for Peer Review of Draft Report, Entitled Station Blackout Risk for Nuclear Power Plants)
- ML13254A153 + (Request for Permanent Exemption from 10 CFR 50.54(m))
- L-MT-18-001, Request for Permanent Exemption from 10 CFR 50 Appendix R III.G.2.a Requirements for Exposed Structural Steel + (Request for Permanent Exemption from 10 CFR 50 Appendix R III.G.2.a Requirements for Exposed Structural Steel)
- EPID:L-2018-LLE-0001 + (Request for Permanent Exemption from 10 CFR 50 Appendix R III.G.2.a Requirements for Exposed Structural Steel)
- GO2-04-125, Request for Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55(g) for the Volumetric Examination of Circumferential Reactor Pressure Vessel Welds + (Request for Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55(g) for the Volumetric Examination of Circumferential Reactor Pressure Vessel Welds)
- ML063320461 + (Request for Permanent Relief from Inservice Inspection Requirements of 10 CFR 50.55a(g) for the Volumetric Examination of Circumferential Reactor Pressure Vessel Welds)
- ML20195C809 + (Request for Permission to Apply LBB Methodology to Pressurizer Surge Piping, Plant Specific Info Fo Pressurizer Surge Piping)