Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-19-0963, Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process + (Removal of the Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications Using Consolidated Line Item Improvement Process)
- RBG-47918, Removal of the Table of Contents from the Technical Specifications + (Removal of the Table of Contents from the Technical Specifications)
- EPID:L-2018-LLA-0489 + (Removal of the Table of Contents from the Technical Specifications)
- ET 22-0001, Removal of the Table of Contents from the Technical Specifications + (Removal of the Table of Contents from the Technical Specifications)
- EPID:L-2022-LLA-0008 + (Removal of the Table of Contents from the Technical Specifications)
- RA-21-0183, Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer) + (Remove 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 (Automatic Transfer Capability from Unit Auxiliary Transformer to Startup Transformer))
- TSTF-279 + (Remove Applicable Supports from Inservice Testing Program)
- TSTF-405 + (Remove Bases Reference to Hydrotest Requirement to Gag Srvs)
- TSTF-533 + (Remove Colr and PTLR Revision and Date Relocation Provisions Added by TSTF-363, -408, and -419)
- TSTF-188 + (Remove Incorrect Reference from the PAM Table)
- TSTF-516 + (Remove Incorrect Sentence in ATWS-RPT Bases)
- TSTF-029 + (Remove Mode 4 When S/Gs Are Relied Upon from the Modes of Applicability)
- TSTF-132 + (Remove Note B from Table 3.3.1-1)
- TSTF-131 + (Remove Note C from CEOG Digital Table 3.3.1-1)
- TSTF-094 + (Remove Number of Required Pressurizer Heater Groups from Pressurizer LCO)
- TSTF-190 + (Remove Reference to Inadvertently Bypassing a Redundant Channel)
- TSTF-076 + (Remove References to the Onsite Review Function)
- TSTF-121 + (Remove Regulatory Duplication from Shift Manning Requirements)
- TSTF-069 + (Remove SR 3.3.1.6 from Function 14 and 15 in Table 3.3.1-1 - Digital)
- TSTF-178 + (Remove Trip or Bypass Removal from RPS and ESFAS Action Note)
- TSTF-189 + (Remove Uncertainty Discussion from the Bases)
- TSTF-105 + (Remove the Details of Performing an RCS Flow Measurement)
- ML12311A162 + (Removed FCS Flooding Recovery Action Plan - 3.4 I&C Power Supply Service Life Assessment, Page 131 - 239)
- TSTF-458 + (Removing Restart of Shutdown Clock for Increasing Suppression Pool Temperature)
- ML091270443 + (Rename Owner - Operator of Seabrook Station)
- ML19186A278 + (Rendezvous Engineering, Pc Notice of Expiration of License 49-27627-01)
- ML15015A626 + (Renew Quality Assurance Program Approval for Radioactive Material Package)
- AEP-NRC-2023-33, Renewable Operating Permit + (Renewable Operating Permit)
- ML20012G472 + (Renewal Application BCL-1081,Rev 4,consisting of Revised Organization Info)
- ML24121A212 + (Renewal Application Request for USA/9297/AF-96 for Model No. Traveller Std, Xl, and Vver Packages)
- ML063260338 + (Renewal Application Review)
- ML072920359 + (Renewal Application Review (M. Clancy Shippingport Borough))
- ML072920415 + (Renewal Application Review (M. Hough, PA Game Commission))
- ML072920385 + (Renewal Application Review (P. Lampe, Shippingport Borough))
- ML072920398 + (Renewal Application Review (R. Janati, Environmental Protection Agency))
- ML072920402 + (Renewal Application Review (S. Hans, U.S. Army Corps of Engineers))
- ML072920260 + (Renewal Application Review - Ltr. to Pennsylvania Department of Conservation and National Resources Beaver Valley Power Station Renewal Application Review - Ltr. to Pennsylvania Department of Conservation and National Resource)
- L-06-109, Renewal Application for Beaver Valley Power Station NPDES Permit No. PA0025615 + (Renewal Application for Beaver Valley Power Station NPDES Permit No. PA0025615)
- ML20090H986 + (Renewal Application for Issuance of Subpoenas Requiring Attendance & Testimony of Witnesses & Production of Evidence Supporting Emergency Planning Contentions.W/Subpoena Schedule & Certificate of Svc.Related Correspondence)
- ML040350287 + (Renewal Application for Louisiana Pollutant Discharge Elimination System (LPDES) Permit No. LA0007374)
- L-07-110, Renewal Application for Outfall 012 NPDES Permit No. PA0025615 + (Renewal Application for Outfall 012 NPDES Permit No. PA0025615)
- ML040350289 + (Renewal Application for Permit LA0007374, Waterford 3 Steam Electric Station, Index of Application Through Revision 0 to Technical Procedure CE-002-036)
- W3F1-2004-0006, Renewal Application for Permit LA0007374, Waterford 3 Steam Electric Station, Appendix G (MSDS) Through Material Data Sheet + (Renewal Application for Permit LA0007374, Waterford 3 Steam Electric Station, Appendix G (MSDS) Through Material Data Sheet)
- ML040480446 + (Renewal Application for Permit LA0007374, Waterford 3 Steam Electric Station, Appendix G (MSDS) Through Material Data Sheet)
- NOC-AE-19003665, Renewal Application for the South Texas Project Texas Pollutant Discharge Elimination System (Tpdes) Permit No. 01908 + (Renewal Application for the South Texas Project Texas Pollutant Discharge Elimination System (Tpdes) Permit No. 01908)
- ML19154A509 + (Renewal Application for the South Texas Project Texas Pollutant Discharge Elimination System (Tpdes) Permit No. 01908)
- ML22026A113 + (Renewal Application to Certificate of Compliance No. 1026 for the Fuelsolutions Spent Fuel Management System Request for Additional Information)
- ML102880370 + (Renewal Hearing -)
- ML103050196 + (Renewal Hearing - 2010 Annual Update for Pilgrim License Renewal)
- ML072530019 + (Renewal Hearing - 8?23 and 8/27 Conference Call Record)
- ML102650536 + (Renewal Hearing - Action Request: Draft Conference Call Summaries for Comment)