November 2, 2007 Ms. Pat Lampe Shippingport Borough Council President P.O. Box 76, Shippingport, PA 15077

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

Dear Ms. Lampe:

The U.S. Nuclear Regulatory Commission (NRC) is reviewing an application, submitted by FirstEnergy Nuclear Operating Company (FENOC), for the renewal of the operating licenses for Beaver Valley Power Station (BVPS), Units 1 & 2, located near the town of Shippingport, Beaver County, Pennsylvania. As part of the review of the license renewal application (LRA),

the NRC is preparing a Supplemental Environmental Impact Statement (SEIS) under the provisions of Title 10 of the Code of Federal Regulations Part 51 (10 CFR Part 51), the NRCs regulation that implements the National Environmental Policy Act (NEPA) of 1969.

BVPS is requesting the renewal of its operating licenses for Units 1 and 2 for a period of 20 years beyond the expiration of the current license term, renewing the licenses until July 2036 and March 2047, respectively. The proposed action would include the use and continued maintenance of existing plant facilities and transmission lines; BVPS does not plan to construct or alter any facilities associated with the plant during the period of extended operation.

The NRC staff plans to hold two identical public meetings covering the license renewal review process and NEPA scoping on November 27, 2007, at the Embassy Suites Pittsburgh -

International Airport, 550 Cherrington Parkway, Pittsburgh, PA 15108. The first meeting will convene at 1:30 p.m., and will continue until 4:30 p.m., as necessary. The second meeting will convene at 7:00 p.m., and will continue until 10:00 p.m., as necessary. From November 13-16, 2007, the NRC plans to conduct a site audit. You and your staff are invited to attend the public meetings. Your office will receive a copy of the draft SEIS along with a request for comments.

The anticipated publication date for the draft SEIS is September 2008.

P. Lampe If you have any questions concerning the NRC staffs review of this LRA, please contact the Safety/Environmental Project Manager, Mr. Kent Howard, at 301-415-2989 or by e-mail at KLH1@nrc.gov.

Sincerely,

/RA by Bo Pham for/

Rani Franovich, Branch Chief Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50-412 cc: See next page

ML072920385 OFFICE: LA:DLR PM:DLR:RPB2 PM:DLR:RPB2 BC:DLR:RPB2 NAME: SFigueroa ESayoc KHoward R. Franovich (BPham for)

DATE: 11/02/07 11/02/07 11/02/07 11/02/07 Letter to P. Lampe From R. Franovich Dated November 2, 2007 DISTRIBUTION:

SUBJECT:

BEAVER VALLEY POWER STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW HARD COPY DLR RF E-MAIL:

PUBLIC SSmith (srs3)

SDuraiswamy RidsNrrDlr RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDlrRlrc RidsNrrDlrReba RidsNrrDlrRebb RidsNrrDciCvib RidsNrrDciCpnb RidsNrrDraAfpb RidsNrrDeEmcb RidsNrrDeEeeb RidsNrrDssSbwb RidsNrrDssSbpb RidsNrrDssScvb RidsOgcMailCenter ESayoc KHoward PBuckberg NMorgan MModes, RI PCataldo, RI DWerkheiser, RI RBellamy, RI

Beaver Valley Power Station, Units 1 and 2 cc:

Mr. William Jiuliante James H. Lash Council Member Senior Vice President of Operations Shippingport Borough and Chief Operating Officer P.O. Box 83, FirstEnergy Nuclear Operating Company Shippingport, PA 15077 Mail Stop A-GO-14 76 South Main Street Mr. William Morrow III Akron, OH 44308 Council Member Shippingport Borough Danny L. Pace P.O. Box 55, Senior Vice President, Fleet Engineering Shippingport, PA 15077 FirstEnergy Nuclear Operating Company Mail Stop A-GO-14 Mr. Terry Ordich 76 South Main Street Council Member Akron, OH 44308 Shippingport Borough P.O. Box 230, Jeannie M. Rinckel Shippingport, PA 15077 Vice President, Fleet Oversight FirstEnergy Nuclear Operating Company Ms. Helen Scott Mail Stop A-GO-14 Council Member 76 South Main Street Shippingport Borough Akron, OH 44308 P.O. Box 3, Shippingport, PA 15077 David W. Jenkins, Attorney FirstEnergy Nuclear Operating Company Mr. Brittan R. Williams Mail Stop A-GO-15 Council Member 76 South Main Street Shippingport Borough Akron, OH 44308 P.O. Box 3, Shippingport, PA 15077 Manager, Fleet Licensing FirstEnergy Nuclear Operating Company Ms. Lisa Miller Mail Stop A-GO-2 Council Member 76 South Main Street Shippingport Borough Akron, OH 44308 Box 181A Chestnut St., Ohio EPA-DERR Shippingport, PA 15077 ATTN: Zack A. Clayton P.O. Box 1049 Mr. Lennon, Smith Columbus, OH 43266-0149 Souleret Engineering Inc.

Coraopolis , PA 15108 Peter P. Sena III Site Vice President Joseph J. Hagan FirstEnergy Nuclear Operating Company President and Chief Nuclear Officer Beaver Valley Power Station FirstEnergy Nuclear Operating Company Mail Stop A-BV-SEB-1 Mail Stop A-GO-19 P.O. Box 4, Route 168 76 South Main Street Shippingport, PA 15077 Akron, OH 44308

Beaver Valley Power Station, Units 1 and 2 cc:

Director, Fleet Regulatory Affairs Director FirstEnergy Nuclear Operating Company Bureau of Radiation Protection Mail Stop A-GO-2 Pennsylvania Department of 76 South Main Street Environmental Protection Akron, Ohio 44308 Rachel Carson State Office Building P.O. Box 8469 Manager, Site Regulatory Compliance Harrisburg, PA 17105-8469 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mayor of the Borough of Shippingport Mail Stop A-BV-A P.O. Box 3 P.O. Box 4, Route 168 Shippingport, PA 15077 Shippingport, PA 15077 Regional Administrator, Region I Richard Anderson U.S. Nuclear Regulatory Commission Vice President, Nuclear Support 475 Allendale Road FirstEnergy Nuclear Operating Company King of Prussia, PA 19406 Mail Stop A-GO-14 76 South Main Street Resident Inspector Akron, OH 44308 U.S. Nuclear Regulatory Commission P.O. Box 298 Commissioner James R. Lewis Shippingport, PA 15077 West Virginia Division of Labor 749-B, Building No. 6 Cliff Custer Capitol Complex FirstEnergy Nuclear Operating Company Charleston, WV 25305 Beaver Valley Power Station P.O. Box 4, Route 168 Director, Utilities Department Shippingport, PA 15077 Public Utilities Commission 180 East Broad Street Mike Banko Columbus, OH 43266-0573 FirstEnergy Nuclear Operating Company Beaver Valley Power Station Director, Pennsylvania Emergency P.O. Box 4, Route 168 Management Agency Shippingport, PA 15077 2605 Interstate Dr.

Harrisburg, PA 17110-9364 Julie Firestone FirstEnergy Nuclear Operating Company Dr. Judith Johnsrud Beaver Valley Power Station Environmental Coalition on Nuclear P.O. Box 4, Route 168 Power Sierra Club 433 Orlando Avenue State College, PA 16803