- 05000306/LER-2010-001, Regarding Unit 2 Turbine Trip During Reactor Shutdown Resulting in a Reactor Scram + (Regarding Unit 2 Turbine Trip During Reactor Shutdown Resulting in a Reactor Scram)
- 05000388/LER-2012-003, Regarding Unit 2, Automatic Reactor Scram While Performing Turbine Control Value Surveillance Testing + (Regarding Unit 2, Automatic Reactor Scram While Performing Turbine Control Value Surveillance Testing)
- 05000237/LER-1976-073, Regarding Unit 2/3 Nitrogen Storage Tank Level Dropping to 58 Inches Which Is Below Technical Specification + (Regarding Unit 2/3 Nitrogen Storage Tank Level Dropping to 58 Inches Which Is Below Technical Specification)
- 05000237/LER-2007-001, Regarding Unit 2s Standby Liquid Control System Tank Inoperable Due to a Small Linear Crack + (Regarding Unit 2s Standby Liquid Control System Tank Inoperable Due to a Small Linear Crack)
- 05000249/LER-2008-001, Regarding Unit 3 Drywell Floor Drain Sump Monitoring System Declared Inoperable + (Regarding Unit 3 Drywell Floor Drain Sump Monitoring System Declared Inoperable)
- 05000249/LER-2006-001, Regarding Unit 3 Main Steam Safety Valves Exceed Surveillance Setpoint + (Regarding Unit 3 Main Steam Safety Valves Exceed Surveillance Setpoint)
- 05000362/LER-2006-002, Regarding Unit 3 Shutdown to Inspect Safety Injection Tank Spiral Wound Gaskets + (Regarding Unit 3 Shutdown to Inspect Safety Injection Tank Spiral Wound Gaskets)
- 05000333/LER-2012-001, Regarding Unit Cooler Fan Motor Contractor Low Voltage Test Failure Results in Loss of Safety Function and Condition Prohibited by the Technical Specifications + (Regarding Unit Cooler Fan Motor Contractor Low Voltage Test Failure Results in Loss of Safety Function and Condition Prohibited by the Technical Specifications)
- 05000373/LER-2011-002, Regarding Unit Shutdown Required by Plant Technical Specifications Due to Pressure Boundary Leakage + (Regarding Unit Shutdown Required by Plant Technical Specifications Due to Pressure Boundary Leakage)
- 05000423/LER-2015-001, Regarding Unlatched Dual Train HELB Door Results in Potential Loss of Safety Function + (Regarding Unlatched Dual Train HELB Door Results in Potential Loss of Safety Function)
- 05000423/LER-2014-004, Regarding Unlatched Dual Train HELB Door Results in Potential Loss of Safety Function + (Regarding Unlatched Dual Train HELB Door Results in Potential Loss of Safety Function)
- 05000458/LER-2011-001, Regarding Unplanned Actuation of Standby Service Water System Due to Procedure Inadequacy + (Regarding Unplanned Actuation of Standby Service Water System Due to Procedure Inadequacy)
- 05000412/LER-2008-001, Regarding Unplanned Actuation of the Auxiliary Feedwater System During Plant Startup + (Regarding Unplanned Actuation of the Auxiliary Feedwater System During Plant Startup)
- 05000316/LER-2004-002, Regarding Unplanned Automatic Reactor Protection System Actuation Due to Feedwater Transient During a Power Reduction + (Regarding Unplanned Automatic Reactor Protection System Actuation Due to Feedwater Transient During a Power Reduction)
- 05000260/LER-2012-006, Regarding Unplanned Automatic Reactor Scram Due to Loss of Power to the Reactor Protection System + (Regarding Unplanned Automatic Reactor Scram Due to Loss of Power to the Reactor Protection System)
- 05000331/LER-2009-004, Regarding Unplanned Automatic Reactor Scram Due to an Invalid Reactor Protection Signal + (Regarding Unplanned Automatic Reactor Scram Due to an Invalid Reactor Protection Signal)
- 05000389/LER-2011-002, Regarding Unplanned Automatic Reactor Trip During Reactor Protection System Testing + (Regarding Unplanned Automatic Reactor Trip During Reactor Protection System Testing)
- 05000458/LER-2004-005, Regarding Unplanned Automatic Scram Due to Loss of Non-vital 120 Volt Instrument Bus + (Regarding Unplanned Automatic Scram Due to Loss of Non-vital 120 Volt Instrument Bus)
- 05000458/LER-2004-003, Regarding Unplanned Automatic Start of Standby Diesel Generator Due to Loss of Division I Switchgear + (Regarding Unplanned Automatic Start of Standby Diesel Generator Due to Loss of Division I Switchgear)
- 05000458/LER-2004-004, Regarding Unplanned Automatic Start of Standby Diesel Generator Due to Loss of Division 2 Switchgear + (Regarding Unplanned Automatic Start of Standby Diesel Generator Due to Loss of Division 2 Switchgear)
- 05000424/LER-2012-004, Regarding Unplanned Auxiliary Feedwater Actuation + (Regarding Unplanned Auxiliary Feedwater Actuation)
- 05000348/LER-2012-004, Regarding Unplanned B Train LOSP During Switchyard Breaker Testing + (Regarding Unplanned B Train LOSP During Switchyard Breaker Testing)
- 05000249/LER-2008-003, Regarding Unplanned Control Rod Withdrawals + (Regarding Unplanned Control Rod Withdrawals)
- 05000391/LER-1917-005, Regarding Unplanned Emergency Core Cooling System Injection Into the Reactor Coolant System Due to Personnel Error + (Regarding Unplanned Emergency Core Cooling System Injection Into the Reactor Coolant System Due to Personnel Error)
- EPID:L-2018-LLA-0003 + (Regarding Unplanned Emergency Core Cooling System Injection Into the Reactor Coolant System Due to Personnel Error)
- 05000251/LER-2010-007, Regarding Unplanned Entry Into TS 3.0.3 Due to Misalignment of Unit 3 HHSI Pump Discharge Valves + (Regarding Unplanned Entry Into TS 3.0.3 Due to Misalignment of Unit 3 HHSI Pump Discharge Valves)
- 05000331/LER-2012-006-01, Regarding Unplanned Inoperability of 2 Average Power Range Monitors + (Regarding Unplanned Inoperability of 2 Average Power Range Monitors)
- 05000331/LER-2012-006, Regarding Unplanned Inoperability of 2 Average Power Range Monitors + (Regarding Unplanned Inoperability of 2 Average Power Range Monitors)
- 05000220/LER-2003-004, Regarding Unplanned Inoperability of Emergency Cooling System Caused by Inadequate Review of Clearance for Replacement of Instrumentation Relay + (Regarding Unplanned Inoperability of Emergency Cooling System Caused by Inadequate Review of Clearance for Replacement of Instrumentation Relay)
- 05000331/LER-2014-004, Regarding Unplanned Inoperability of High Pressure Coolant Injection + (Regarding Unplanned Inoperability of High Pressure Coolant Injection)
- 05000296/LER-2007-002, Regarding Unplanned Inoperability of the Unit 3 High Pressure Coolant Injection System Due to Loss of 120 Vac Instrument Power + (Regarding Unplanned Inoperability of the Unit 3 High Pressure Coolant Injection System Due to Loss of 120 Vac Instrument Power)
- 05000261/LER-2012-002, Regarding Unplanned LCO 3.5.4 Entry Due to RWST Alignment to Purification + (Regarding Unplanned LCO 3.5.4 Entry Due to RWST Alignment to Purification)
- 05000263/LER-2006-002, Regarding Unplanned LCO Due to Loss of Cooling in the Upper 4KV Room + (Regarding Unplanned LCO Due to Loss of Cooling in the Upper 4KV Room)
- 05000336/LER-2008-002, Regarding Unplanned LCO Entry - Three Charging Pumps Aligned for Injection with the Reactor Coolant System Temperature Less than 300 Degrees F + (Regarding Unplanned LCO Entry - Three Charging Pumps Aligned for Injection with the Reactor Coolant System Temperature Less than 300 Degrees F)
- 05000364/LER-2010-001, Regarding Unplanned LOSP During SI with LOSP Testing + (Regarding Unplanned LOSP During SI with LOSP Testing)
- 05000457/LER-2010-004, Regarding Unplanned Limiting Condition for Operation Entry Due to Low Header Pressure on the 2B Essential Service Water Pump + (Regarding Unplanned Limiting Condition for Operation Entry Due to Low Header Pressure on the 2B Essential Service Water Pump)
- 05000331/LER-2003-005, Regarding Unplanned Manual Reactor Scram Due to High Reactor Coolant Conductivity + (Regarding Unplanned Manual Reactor Scram Due to High Reactor Coolant Conductivity)
- 05000331/LER-2010-003, Regarding Unplanned Manual Reactor Scram Due to Increasing Turbine Vibrations + (Regarding Unplanned Manual Reactor Scram Due to Increasing Turbine Vibrations)
- 05000458/LER-2007-002, Regarding Unplanned Manual Reactor Scram Due to Loss of Cooling on No. 2 Main Transformer + (Regarding Unplanned Manual Reactor Scram Due to Loss of Cooling on No. 2 Main Transformer)
- 05000458/LER-2009-002, Regarding Unplanned Manual Reactor Scram Following Trip of Both Reactor Recirculation Pumps + (Regarding Unplanned Manual Reactor Scram Following Trip of Both Reactor Recirculation Pumps)
- 05000389/LER-2013-001, Regarding Unplanned Manual Reactor Trip Due to Algae + (Regarding Unplanned Manual Reactor Trip Due to Algae)
- 05000335/LER-2013-002, Regarding Unplanned Manual Reactor Trip Due to Digital-Electro-Hydraulic (DEH) System Leak + (Regarding Unplanned Manual Reactor Trip Due to Digital-Electro-Hydraulic (DEH) System Leak)
- 05000278/LER-2009-006, Regarding Unplanned Manual Scram Due to Shortening Reactor Period During Scheduled Shutdown + (Regarding Unplanned Manual Scram Due to Shortening Reactor Period During Scheduled Shutdown)
- 05000331/LER-2009-003, Regarding Unplanned Manual Scram Due to Increasing Reactor Water Level + (Regarding Unplanned Manual Scram Due to Increasing Reactor Water Level)
- 05000219/LER-2006-001, Regarding Unplanned Manual Scram Inserted During Planned Reactor Shutdown to Expedite Plant Cooldown + (Regarding Unplanned Manual Scram Inserted During Planned Reactor Shutdown to Expedite Plant Cooldown)
- 05000331/LER-2016-002, Regarding Unplanned RCIC Inoperability Results in Safety Functional Failure + (Regarding Unplanned RCIC Inoperability Results in Safety Functional Failure)
- 05000388/LER-2002-004, Regarding Unplanned RPS Actuation - Loss of Condenser Vacuum & Reactor Scram + (Regarding Unplanned RPS Actuation - Loss of Condenser Vacuum & Reactor Scram)
- 05000366/LER-2013-001, Regarding Unplanned RPS Actuation Due to Scram Discharge Volume High Level During Surveillance Test + (Regarding Unplanned RPS Actuation Due to Scram Discharge Volume High Level During Surveillance Test)
- 05000321/LER-2013-001, Regarding Unplanned RPS Actuation in Response to Reactor Coolant Chemistry Event Caused by a Condenser Tube Leak + (Regarding Unplanned RPS Actuation in Response to Reactor Coolant Chemistry Event Caused by a Condenser Tube Leak)
- 05000458/LER-2007-006, Regarding Unplanned Reactor Scram Due to Transformer Fault + (Regarding Unplanned Reactor Scram Due to Transformer Fault)
- 05000282/LER-2009-002, Regarding Unplanned Safety Related Actuation of 121 Cooling Water Pump + (Regarding Unplanned Safety Related Actuation of 121 Cooling Water Pump)
- 05000387/LER-2012-007, Regarding Unplanned Shutdown Due to Unidentified Drywell Leakage + (Regarding Unplanned Shutdown Due to Unidentified Drywell Leakage)