Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML031270607 + (Reactor Vessel Closure Head Replacement Project)
- Information Notice 2012-21, Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup + (Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup)
- ML032110382 + (Reactor Vessel Closure Head Welding Data Sheets)
- ML20070M080 + (Reactor Vessel Core Support Cone Structural Integrity)
- 05000455/FIN-2013005-05 + (Reactor Vessel Design Documents Not Updated to Reflect Unit 2 Missing Head Stud)
- ML20262D862 + (Reactor Vessel Design Layout. Sheet 1 of 9)
- ML20262D867 + (Reactor Vessel Design Layout. Sheet 2 of 9)
- ML20262D879 + (Reactor Vessel Design Layout. Sheet 3)
- ML20262D882 + (Reactor Vessel Design Layout. Sheet 4)
- ML20262D884 + (Reactor Vessel Design Layout. Sheet 5)
- ML20262D888 + (Reactor Vessel Design Layout. Sheet 6)
- ML20262D889 + (Reactor Vessel Design Layout. Sheet 7)
- ML20262D892 + (Reactor Vessel Design Layout. Sheet 8)
- ML20262D894 + (Reactor Vessel Design Layout. Sheet 9)
- ML20265B008 + (Reactor Vessel Details.Sheet 1)
- ML22097A130 + (Reactor Vessel Embrittlement Presentation on March 22, 2022)
- ML20076H285 + (Reactor Vessel Exam Program)
- ML20260E870 + (Reactor Vessel Flange LEAK-OFF Valve Logic Diagram System:Rc. Actual Drawing NUMBER:6R-14-9-Z-42161 1)
- ML20261M023 + (Reactor Vessel Flange Leak-Off Valve Logic Diagram System: Rc)
- PMNS20190007, Reactor Vessel Flange Tool (Rft) Fuel Seismic Aspect + (Reactor Vessel Flange Tool (Rft) Fuel Seismic Aspect)
- ML20137L791 + (Reactor Vessel Fluence & RT Pressurized Thermal Shock (PTS) Evaluations)
- ML20055D859 + (Reactor Vessel Fluence & Ref Temp PTS Evaluations)
- ML20140A682 + (Reactor Vessel Fluence & Ref Temp for Pressurized Thermal Shock Evaluations)
- ML20237C058 + (Reactor Vessel Fluence & Rt/Pts Evaluations)
- ML20207B523 + (Reactor Vessel Fluence & Rt/Pts Evaluations Suppl to WCAP 11016)
- ML20249C001 + (Reactor Vessel Fluence Analysis Methodology)
- ML13316A547 + (Reactor Vessel Fluence Calculation,Pts Evaluation & Flux Reduction Factor Curves)
- ML023570220 + (Reactor Vessel Head (to: Commissioner Assistants; from: J W Craig))
- ML20064N274 + (Reactor Vessel Head Cooldown During Natural Circulation Cooldown Transients)
- ML030870370 + (Reactor Vessel Head Damage, NRC Update)
- ML023430543 + (Reactor Vessel Head Damage, NRC Update, December 2002)
- ML030420091 + (Reactor Vessel Head Damage, NRC Update, February 2003)
- ML021370684 + (Reactor Vessel Head Degradation - Lessons-Learned Task Force and Charter - Memo to Arthur T. Howell, III, Region IV, from William Travers, EDO)
- ML022120581 + (Reactor Vessel Head Degradation - Lessons-Learned Charter, Revision 3 - Memo to Howell from Travers)
- ML022030209 + (Reactor Vessel Head Degradation Lessons Learned Task Force Public Meeting Summaries - June 12 and June 19 Meetings; Memo to William F. Kane, Deputy. Memo to William F. Kane, Deputy Executive Director for Reactor Programs)
- ML030280708 + (Reactor Vessel Head Degradation Lessons Learned Task Force: Transcript of Public Meeting Held on Nov 20, 2002 in Oak Harbor, Oh)
- ML030280448 + (Reactor Vessel Head Degradation Lessons-Learned Task Force Report Executive Summary - Handout Provided at Public Meeting on November 20, 2002)
- ML030280481 + (Reactor Vessel Head Degradation Lessons-Learned Task Force - Public Meeting, November 20, 2002 (Presentation Slides))
- ML022810466 + (Reactor Vessel Head Degradation Lessons-Learned Task Force - Meeting Notice)
- RNP-RA/02-0122, Reactor Vessel Head Inspection Plan for Refueling Outage 21 + (Reactor Vessel Head Inspection Plan for Refueling Outage 21)
- NL-03-098, Reactor Vessel Head Inspection Results, Spring 2003 Refueling Outage + (Reactor Vessel Head Inspection Results, Spring 2003 Refueling Outage)
- NL-02-162, Reactor Vessel Head Inspection Results; Indian Point 2, Fall 2002 Refueling Outage + (Reactor Vessel Head Inspection Results; Indian Point 2, Fall 2002 Refueling Outage)
- ML030510264 + (Reactor Vessel Head Inspection Status, San Onofre Nuclear Generating Station Unit 3)
- ML040550033 + (Reactor Vessel Head Inspections, Calvert Cliffs Nuclear Power Plant, Inc)
- 05000335/FIN-2007003-01 + (Reactor Vessel Head Lift Practices)
- 05000369/FIN-2007003-02 + (Reactor Vessel Head Lift Practices Related to Design and Licensing Basis)
- ENS 41128 + (Reactor Vessel Head Nozzle Cracking)
- 05000339/LER-2001-003, Reactor Vessel Head Nozzle Through-Wall Leakage Due to Lack of Weld Fusion During Original Fabrication + (Reactor Vessel Head Nozzle Through-Wall Leakage Due to Lack of Weld Fusion During Original Fabrication)
- ENS 40728 + (Reactor Vessel Head Nozzle Weld Area Flaw)
- ENS 42917 + (Reactor Vessel Head Nozzle Weld Area Flaw)
- ENS 50962 + (Reactor Vessel Head Penetration Flaw Identified During Inservice Inspection)