List of results

  • ML052370401  + (RAI, 15-Day and 90-Day SG Tube ISI Report for End-of-Cycle 6 Refueling Outage in 2005 (Tac No. MC7485))
  • ML050970118  + (RAI, 1C Loop Stop Isolation Valve)
  • ML032550146  + (RAI, 2002 Steam Generator Inspection Results)
  • ML042050355  + (RAI, 2003 Refueling Outage Steam Generator Inspection Reports)
  • ML062840715  + (RAI, 2005 SG Tube Inspections)
  • ML090890593  + (RAI, 2008 Steam Generator Tube Inservice Inspections)
  • ML052280392  + (RAI, 24-Month Fuel Cycle (Tac No. MC4161) (TS-433))
  • ML041200785  + (RAI, 60-Day Response to Nuclear Regulatory Commission Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors)
  • ML050960422  + (RAI, ASME Section XI ISI Program Partial Examination RR)
  • ML051570059  + (RAI, ASME XI ISI Program End of Intervals System Pressure Testing RR)
  • ML080390162  + (RAI, Additional Engineering Evaluation of Two Reactor Pressure Vessel Weld Flaws)
  • ML042570212  + (RAI, Allowable Value for Reactor Vessel Water Level)
  • ML032130047  + (RAI, Alternate Source Term Submittal)
  • ML042120194  + (RAI, Alternative Source Term Amendment Request)
  • ML061040179  + (RAI, Alternative Source Term Implementation Review)
  • ML042330130  + (RAI, Alternative Source Term Main Steam Line Indications)
  • ML040560454  + (RAI, Alternative Visual Examination of Inaccessible Insulated Components During System Pressure Tests)
  • ML021120379  + (RAI, Amendment Application Inservice Testing and Inspection Requirements)
  • ML043410185  + (RAI, Amendment Application for Alternate Source Term (TAC No. M3351))
  • ML061500024  + (RAI, Amendment Application to Revise Technical Specifications on DC Electrical System Requirements)
  • ML053260303  + (RAI, Amendment Request)
  • ML051390182  + (RAI, Amendment Request Modify Auxiliary Feedwater Pump Suction Protection Requirements)
  • ML032120107  + (RAI, Amendment Request Re Allowing Entry Into Mode 3 Operation During the Current Outage)
  • ML032750700  + (RAI, Amendment Request Regarding Application for Stretch Power Uprate)
  • ML051650190  + (RAI, Amendment Request That Propose to Revise the Pressure and Temperature Limit Curves for 54 Effective full-power Years to Support the 20 Year License Extension)
  • ML043070175  + (RAI, Amendment Request for Fire Protection Changes)
  • ML023250506  + (RAI, Amendment Request to Allow Plant Operation with Associated Containment at Atmospheric Pressure (TAC Nos. MB5303 & MB5304))
  • ML043270142  + (RAI, Amendment Request to Modify TS Definition of Operable (Tac MC3857 and MC3858))
  • ML051330277  + (RAI, Amendment Request to Revise Technical Specification: Emergency Core Cooling Systems Tavg<350 Degrees)
  • ML100350668  + (RAI, Amendment Request to Revise the Degraded Voltage Function in the TS Table 3.3.8.1-1, ME1477)
  • ML051440190  + (RAI, Amendment Request, Revises Technical Specification (TS) 1.0, Definitions, Table TS 3.5-2, Instrument Operation Conditions for Reactor Trip, & Table TS 4.1-1, Minimum Frequencies for Checks, Calibrations & Test of Instrument Channels)
  • ML051080341  + (RAI, Amendment to Implement Alternative Source Term)
  • ML050400412  + (RAI, Amendment to Reflect Addition of the Chilled Water System to Provide Cooling to the Containment Fan Cooling Units)
  • ML043080276  + (RAI, Amendment to Reflect Addition of the Chilled Water System to Provide Cooling to the Containment Fan Cooling Units)
  • ML022790009  + (RAI, Annual Steam Generator Inservice Inspection Summary Report)
  • ML023570386  + (RAI, Appendix K Measurement Uncertainty Recovery - Power Uprate Request)
  • ML042790205  + (RAI, Application of Alternative Source Term)
  • ML043270122  + (RAI, Approval to Extend Risk-Informed Inservice Inspection Program)
  • ML093220807  + (RAI, Battery Resistance Surveillance Requirements)
  • ML023250516  + (RAI, Bulletin 2002-01 60-Day Responses)
  • ML023260148  + (RAI, Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15-Day & 60-Day Responses)
  • ML023220476  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity)
  • ML023220542  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity)
  • ML023260067  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity)
  • ML023180649  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity 60 Day Response Tacs. MB4575 & MB4576)
  • ML023250108  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity, 60-Day Response)
  • ML023290215  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-day Response (TAC MB4537 & TAC MB4538))
  • ML023260180  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 15-Day & 60-Day Responses)
  • ML023220659  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degration & Reactor Coolant Pressure Boundary Integrity, 60-Day Response)
  • ML023260124  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-Day Response)
  • ML023260110  + (RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity, 60-Day Response)