Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML050030061 + (Psat 3056CT.QA.04, Calculation Component Effect of Indian Point 3 Engineered Safety Feature Leakage Iodine Release with Boundary Layer, Revision 1)
- ML25314A117 + (Psbr Emergency Preparedness Plan)
- ML042750380 + (Psbr TS 4.1.1 Change Request)
- ML20155A230 + (Pse&G 1985 Annual Rept)
- ML18089A333 + (Pse&G Response to NUREG-0737,Item II.B.3,NRC Evaluation Criteria Guidelines for Post-Accident Sampling Sys)
- ML20134K083 + (Pse&G/Nuclear Business Unit Organizational Effectiveness Assessment Plan,)
- LR-N10-0355, Pseg Nuclear L.L.C., Maintenance, S2.IC-CC.RCP-0070(Q), Rev. 18, 2PT-403 Reactor Coolant System Hot Leg Pressure Channel Ii. + (Pseg Nuclear L.L.C., Maintenance, S2.IC-CC.RCP-0070(Q), Rev. 18, 2PT-403 Reactor Coolant System Hot Leg Pressure Channel Ii.)
- LR-N10-0355, Pseg Nuclear LLC Maintenance, Salem Common Procedure, SC.IC-CC.NIS-0012(Q), Rev. 7, N32 Source Range. + (Pseg Nuclear LLC Maintenance, Salem Common Procedure, SC.IC-CC.NIS-0012(Q), Rev. 7, N32 Source Range.)
- LR-N10-0355, Pseg Nuclear LLC Maintenance, Salem Common Procedure SC.IC-CC.NIS-0011(Q), Rev. 6, N31 Source Range. + (Pseg Nuclear LLC Maintenance, Salem Common Procedure SC.IC-CC.NIS-0011(Q), Rev. 6, N31 Source Range.)
- ML062160194 + (Pseg/Allegation Project Plan)
- ML052490451 + (Pseg/Allegation Project Plan)
- ML20195A396 + (Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020)
- EPID:L-2020-LRM-0063 + (Pseg/Nrc Pre-Submittal Meeting - Salem Pressurizer Weld Interval Extension Request for Alternative (Presentation Slides) - July 20, 2020)
- ML20104C035 + (Pseg/Nrc Pre-Submittal Meeting, Salem Expanded Scope Leak-Before-Break Amendment Request - April 15, 2020)
- ML19220C323 + (Pseudo Rod Worth Test Procedure Should Not Be Accepted W/O Analysis by Licensee of Consequences of Possible Ejection Accident)
- ML20115E353 + (Psl 2020 Exam Corporate Notification Letter Aka 210-day Letter NUREG Rev 111)
- ML17213A936 + (Psl Emergency Operations Facility:Floor Plan & Details. Sheet 5)
- ML17213A934 + (Psl Emergency Operations Facility:Site Plan. Sheet 1 of 19)
- ML21153A052 + (Psl SLRA Preapplication Meeting 06-03-21)
- ML17229A061 + (Psl Self-Assessment)
- ML072050175 + (Pss: Search for Private Schools)
- ML22124A035 + (Psu Afr Approval)
- ML23193A780 + (Psu Cover Letter 2022 SG)
- ML19365A059 + (Psu DFP Reviewer Work Request (Harwell Shawn))
- ML20022A072 + (Psu DFP Reviewer Work Request (Harwell Shawn))
- ML21141A005 + (Psu Project Manager Change 05202021)
- ML22060A060 + (Psu RSO Change Amendment 3)
- ML21014A099 + (Psu Review 2020 Annual SG Acceptance Review 01112021)
- ML19365A057 + (Psu Reviewer Work Request for DFA_KR_12232019)
- ML19343B384 + (Psychological Stress for Alternatives of Decontamination of the TMI-2 Reactor Building Atmosphere)
- ML20076H160 + (Pt 21 Rept Re Potential Defect in Transmitter Mfg by Rosemount,Inc Used in Control Sys Components Furnished to Listed Plants.All Components Involved Retrofitted W/New Circuit Boards.Matter Closed)
- ML063060040 + (Pt. Beach Branch Chief Letter)
- ML020530557 + (Pt. Beach, Units 1 & 2 - Emergency Response Capability - Conformance to Regulatory Guide 1.97, Revision 2)
- ML17257A445 + (Ptbh Public Meeting for OL Workshop (CMS))
- ML12240A267 + (Ptn 95001 Document Request Letter Rev 1, Turkey Point)
- ML18228A492 + (Ptp - Units 3 & 4, Component Cooling System - SH.1, Outside Containment, Rev. 1)
- ML18228A493 + (Ptp - Units 3 & 4, Primary Water and Demineralized Water Systems, Rev. 1)
- ML18228A490 + (Ptp - Units 3 & 4, Sampling System and Spent Fuel Pit Cooling System, Rev. 2)
- ML18228A491 + (Ptp - Units 3 & 4, Waste Disposal System - - Liquids, Rev. 1)
- ML19211A067 + (Pu Accident Resistant Container Project)
- ML20058B399 + (Pu Air Transport Certification Program Phase 1 Final Rept, Development of Criteria for Controlled Tests for Air Transport Packages)
- ML092730263 + (Pu Plant Boiler Room)
- ML092730255 + (Pu Plant Chem. Make-Up)
- ML092730257 + (Pu Plant Exhaust Fanroom)
- ML092720435 + (Pu Plant Final Release Survey Non Production Area-Office Area)
- ML092720434 + (Pu Plant Laboratory Drain System)
- ML092730266 + (Pu Plant Non Production Office Area Piping (Tagged Lines Only))
- ML092730258 + (Pu Plant Production Hall Attic Conduit Lines and Piping)
- ML092730260 + (Pu Plant Septic Tank Drainage System)
- ML092720439 + (Pu Plant Solvent Extraction)
- ML092730259 + (Pu Plant Vault Room 126)