Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207J393 + (Preliminary Review of Mass Transfer and Flow Visualization Studies and Techniques Relevant to the Study of EROSION- Corrosion of Reactor Piping Systems)
- ML040410438 + (Preliminary Review of Nuclear Energy Institutes (Neis) First Draft of PWR (Pressurized Water Reactor) Containment Sump Evaluation Methodology)
- ML18087A878 + (Preliminary Review of Pse&G Co Corrective Action Program Re Reactor Trip Breaker Failures at Salem Generating Station Unit 1)
- ML20203F540 + (Preliminary Review of Reactor Coolant Pump Trip Criteria for South Texas Project,Units 1 & 2)
- ML21333A009 + (Preliminary Review of the U.S. DOE Draft Waste Incidental to Reprocessing (Wir) Evaluation for the Test Bed Initiative Demonstration for Detailed Technical Review)
- ML20254A003 + (Preliminary Review of the U.S. Department of Energys Submittal of the 2020 Savannah River Site Saltstone Disposal Facility Performance Assessment)
- ML19347A860 + (Preliminary Review,Soil Parameters Used in USGS Rept 78-138,Effects of Seepage from Fly-Ash Settling Ponds & Const Dewatering on Groundwater Levels in Cowles Unit,In Dunes Natl Lakeshore,In)
- ML20058J583 + (Preliminary Revision 1 to QA Program Description for Operational Nuclear Power Plants)
- ML062220496 + (Preliminary Risk Screening for Cooper Service Water Issues)
- ML020950191 + (Preliminary Root Cause Investigation Form Con-Ed SL1 Investigation & LER)
- ML20289A534 + (Preliminary Rule Language Documents for the Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors (Part 53) Rulemaking)
- ML22040A361 + (Preliminary Rule Language for10 CFR Part 53, Subpart F, Requirements for Operations, Interim Report)
- ML22053A092 + (Preliminary Rule Language for10 CFR Part 53, Subpart F, Requirements for Operations, Interim Report)
- ML20003A345 + (Preliminary SAR for Fuel Reload 2 (Cycle 3))
- ML20161A092 + (Preliminary SER - CoC 1040 A4)
- ML23027A217 + (Preliminary SER - CoC 1042 Amd 3)
- ML21127A082 + (Preliminary SER - Renewed CoC 1021)
- ML052380159 + (Preliminary SER Appendix - Title 10 Code of Federal Regulations Applicable to the Hb ISFSI)
- ML052380039 + (Preliminary SER Chapter 1 - General Description)
- ML052380139 + (Preliminary SER Chapter 10 - Conduct of Operations Evaluation)
- ML052380140 + (Preliminary SER Chapter 11 - Radiation Protection Evaluation)
- ML052380142 + (Preliminary SER Chapter 12 - Quality Assurance Evaluation)
- ML052380145 + (Preliminary SER Chapter 13 - Financial Qualifications and Decommissioning Evaluation)
- ML052380148 + (Preliminary SER Chapter 14 - Waste Confinement and Management Evaluation)
- ML052380152 + (Preliminary SER Chapter 15 - Accident Analysis)
- ML052380155 + (Preliminary SER Chapter 16 - Technical Specifications)
- ML052380040 + (Preliminary SER Chapter 2 - Site Characteristics)
- ML052380042 + (Preliminary SER Chapter 3 - Operation Systems)
- ML052380045 + (Preliminary SER Chapter 4 - Systems, Structures, and Components (Sscs) and Design Criteria Evaluation)
- ML052380062 + (Preliminary SER Chapter 5 - Installation and Structural Evaluation)
- ML052380075 + (Preliminary SER Chapter 6 - Thermal Evaluation)
- ML052380129 + (Preliminary SER Chapter 7 - Shielding Evaluation)
- ML052380136 + (Preliminary SER Chapter 8 - Criticality Evaluation)
- ML052380137 + (Preliminary SER Chapter 9 - Confinement Evaluation)
- ML052380037 + (Preliminary SER Table of Contents - Executive Summary)
- ML19228A238 + (Preliminary SER for CoC 1031 Amendment 8)
- ML20212J389 + (Preliminary Safety Analysis Report - Summit Power Station)
- ML19325D422 + (Preliminary Safety Evaluation & Request for Addl Info Re Defueling.Proposed Tech Specs,Including 6.1 Require Mod)
- ML20126G091 + (Preliminary Safety Evaluation Providing Staff Conclusions Re Consistency of Containment Performance Goals of ABWR Rccv Under Severe Accident Loadings W/Deterministic Containment Performance Goals of SECY-90-016)
- ML20052A816 + (Preliminary Safety Evaluation Re Geologic & Seismologic Environ.Request for Addl Info Encl)
- ML20214U013 + (Preliminary Safety Evaluation Re LER 50-267/86-017. Recommends That Licensee Provide Details of Evaluation & Response to 860403 Event Involving Short Periods of Loss of Forced Circulation)
- ML20052A806 + (Preliminary Safety Evaluation Re Relationship of Latest Geologic & Seismic Info to Continued Operation of Vallecitos Nuclear Ctr)
- ML19262E161 + (Preliminary Safety Evaluation Report Amend. 16)
- ML22026A524 + (Preliminary Safety Evaluation Report for NAC International, Inc. Magnastor Storage System, Certificate of Compliance No. 1031, Amendment No. 10)
- ML22297A270 + (Preliminary Safety Evaluation Report for NAC International Multipurpose Canister (NAC-MPC) Storage System Certificate of Compliance No. 1025)
- ML22175A086 + (Preliminary Safety Evaluation Report for the HI-STORM 100 Cask System, Certificate of Compliance No. 1014, Amendment No. 17)
- ML22098A303 + (Preliminary Safety Evaluation Report for the HI-STORM 100 Cask System, Certificate of Compliance No. 1014 Renewal, Docket No. 72-1014)
- ML21168A365 + (Preliminary Safety Evaluation Report for Renewed CoC No. 1008, Amendment Nos. 0, 1, 2, and 3)
- L-2013-283, Preliminary Schedule for GSI-191 Resolution + (Preliminary Schedule for GSI-191 Resolution)
- L-2013-281, Preliminary Schedule for GSI-191 Resolution + (Preliminary Schedule for GSI-191 Resolution)
- SBK-L-13179, Preliminary Schedule for GSI-191 Resolution + (Preliminary Schedule for GSI-191 Resolution)