Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PMNS20230850, Pre-application Meeting with Urenco USA Regarding Forthcoming IROFS Related License Amendment Request + (Pre-application Meeting with Urenco USA Regarding Forthcoming IROFS Related License Amendment Request)
- PMNS20230876, Pre-application Meeting with Urenco USA (Uusa) Regarding a Forthcoming License Amendment Request to Increase the Allowable Enrichment Level + (Pre-application Meeting with Urenco USA (Uusa) Regarding a Forthcoming License Amendment Request to Increase the Allowable Enrichment Level)
- PMNS20241173, Pre-application Meeting with Westinghouse on AP300 White Paper Safety Analysis Codes & Methods + (Pre-application Meeting with Westinghouse on AP300 White Paper Safety Analysis Codes & Methods)
- PMNS20230865, Pre-application Meeting with Westinghouse to Discuss the Radiation Protection and Contamination Control White Paper Related to the Evinci Microreactor Design + (Pre-application Meeting with Westinghouse to Discuss the Radiation Protection and Contamination Control White Paper Related to the Evinci Microreactor Design)
- PMNS20241148, Pre-application Meeting with Westinghouse on AP300 White Paper Codes & Standards + (Pre-application Meeting with Westinghouse on AP300 White Paper Codes & Standards)
- PMNS20241287, Pre-application Meeting with Westinghouse on AP300 SMR White Paper Probabilistic Risk Assessment (PRA) + (Pre-application Meeting with Westinghouse on AP300 SMR White Paper Probabilistic Risk Assessment (PRA))
- PMNS20241455, Pre-application Meeting with Westinghouse on AP300 SMR White Paper Licensing Application Approach + (Pre-application Meeting with Westinghouse on AP300 SMR White Paper Licensing Application Approach)
- ML23159A254 + (Pre-application Meeting with Xcel Energy to Discuss the Amendment Application for the Prairie Island ISFSI)
- PMNS20250229, Pre-application Meeting with the NCNR for a License Amendment to Convert the Nbsr from a Test Reactor to a Research Reactor + (Pre-application Meeting with the NCNR for a License Amendment to Convert the Nbsr from a Test Reactor to a Research Reactor)
- ML20197A269 + (Pre-application Presentation Slides for Amendment to NEDO-11209-A Revision 15, GE Hitachi Nuclear Energy Quality Assurance Program Description)
- PMNS20241288, Pre-application Proprietary Meeting with Westinghouse on AP300 SMR White Paper Probabilistic Risk Assessment (PRA) + (Pre-application Proprietary Meeting with Westinghouse on AP300 SMR White Paper Probabilistic Risk Assessment (PRA))
- ML22068A122 + (Pre-application Public Meeting 3/15/22 Slides - Applicant)
- ML22067A067 + (Pre-application Public Meeting 3/15/22 Slides-NRC)
- ML22024A372 + (Pre-application Public Meeting Slides for Potential Relief Request Related to Excess Flow Check Valves at Monticello Nuclear Generating Plant)
- PMNS20240987, Pre-application Public Meeting on SMR, LLCs (Holtec) SMR-300 Cyber Security Plan + (Pre-application Public Meeting on SMR, LLCs (Holtec) SMR-300 Cyber Security Plan)
- ML19212A741 + (Pre-application Public Teleconference with NextEra Energy Point Beach, LLC (NextEra) to Discuss a Relief Request for Point Beach Nuclear Plant, Unit 2)
- PMNS20201022, Pre-application Review Meeting with Louisiana Energy Services D.B.A. Urenco USA (Uusa) + (Pre-application Review Meeting with Louisiana Energy Services D.B.A. Urenco USA (Uusa))
- ML030290387 + (Pre-application Site Visit to North Anna Nuclear Station to Observe Early Site Permit (ESP) Pre-application Subsurface Investigation Activities (Project No. 719))
- ML18304A271 + (Pre-application Teleconference with NextEra Energy Point Beach to Discuss High Winds Probabilistic Risk Assessment (PRA) License Amendment)
- ML19309E969 + (Pre-application Teleconference with NextEra Energy Point Beach, LLC (NextEra) to Discuss License Amendment Request (LAR) to Address Tornado Missile Protection (TMP) at Point Beach Nuclear Plant (Pbnp), Units 1 and 2)
- PMNS20241128, Pre-application Westinghouse AP300 White Paper EPZ Definition + (Pre-application Westinghouse AP300 White Paper EPZ Definition)
- 05000369/FIN-2008003-03 + (Pre-conditoning of Unit 2 MSIVs Prior to Surveillance Testing)
- ML22276A149 + (Pre-decisional DG Seismic Design Ver 7)
- ML22276A154 + (Pre-decisional DG Seismic Isolation Ver 7)
- ML25339A142 + (Pre-decisional Enforcement Conference (Pec) Public Meeting on September 3, 2025 Official Transcript)
- ML20236P106 + (Pre-decisional Enforcement Conference Repts 50-317/98-05 & 50-318/98-05.Major Areas Discussed:Radiological Controls Deficiencies Experienced During Replacement of Nuclear Instrumentation Detectors in Unit 1 Annulus on 980409)
- ML19087A097 + (Pre-decisional Enforcement Conference Summary Holtec International)
- NL-20-0037, Pre-decisional Reply to EA-19-112, NRC Inspection Report 05000424/2019090 and 05000425/2019090 and Preliminary White Finding and Apparent Violation + (Pre-decisional Reply to EA-19-112, NRC Inspection Report 05000424/2019090 and 05000425/2019090 and Preliminary White Finding and Apparent Violation)
- ML072120490 + (Pre-filed Direct Testimony of Dr. Rudolf H. Hausler)
- ML12181A365 + (Pre-filed Written Rebuttal Testimony of Stephen C. Sheppard Regarding Contention NYS-17B)
- ML17353A762 + (Pre-fire Plan Guidelines & Safe Shutdown Manual Actions)
- PMNS20180153, Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment + (Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment)
- PMNS20171208, Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment + (Pre-licensing Meeting with Southern Nuclear Operating Company, Inc., (SNC) to Discuss the Joseph M. Farley Nuclear Plant, Units 1 and 2, Risk-Informed Completion Times Amendment)
- ML19252A334 + (Pre-licensing Teleconference with Dominion Energy to Discuss Its Proposed License Amendments to Adopt a Risk-informed 10 CFR 50.69 Categorization Program for the Surry Power Station, Units 1 and 2)
- ML19240B712 + (Pre-licensing Teleconference with Dominion Energy to Discuss Its Proposed License Amendments to Adapt a Risk-informed 10 CFR 50.69 Categorization Program for the Surry Power Station, Units 1 and 2)
- PMNS20240996, Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate + (Pre-planning Meeting to Discuss the Various Future License Amendment Requests for the Salem Power Uprate)
- PMNS20231157, Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig + (Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig)
- EPID:L-2023-LRM-0080 + (Pre-planning Meeting with PSEG Nuclear LLC to Discuss Future Amendments Regarding Integrated Technical Specification Conversion, 24-Month Fuel Cycle and Revise Safety Release Valve Setpoint to 1130 Psig)
- ML20148A461 + (Pre-publication Copy of Solidification of High-Level Radioactive Wastes. Study of Scientific & Tech Problems W/ Conversion of Liquid & Semiliquid high-level Radioactive Wastes Into Stable Form Suitable for Transp)
- ML24283A027 + (Pre-publication Draft to Proposed Rule: Risk-Informed, Technology-Inclusive Regulatory Framework for Advanced Reactors)
- ML101730121 + (Pre-release Inspection Results)
- PMNS20250690, Pre-submittal Closed Hybrid Meeting Between U. S. Nuclear Regulatory Commission and Westinghouse Electric Company for Topical Report WCAP-19042 + (Pre-submittal Closed Hybrid Meeting Between U. S. Nuclear Regulatory Commission and Westinghouse Electric Company for Topical Report WCAP-19042)
- ML11140A099 + (Pre-submittal Consideration of Steam Generator Alternative Repair Criteria Requirements - Request for Additional Information)
- PMNS20190398, Pre-submittal Discussion of Proposed License Amendment Request to Replace Buried Electrical Cable + (Pre-submittal Discussion of Proposed License Amendment Request to Replace Buried Electrical Cable)
- PMNS20230444, Pre-submittal Discussion of X-energy Topical Report, Atmospheric Dispersion and Dose Consequences Methods + (Pre-submittal Discussion of X-energy Topical Report, Atmospheric Dispersion and Dose Consequences Methods)
- ML24138A128 + (Pre-submittal May 15, 2024 Meeting Presentation License Amendment Request: Public Slides)
- PMNS20221161, Pre-submittal Meeting - Meeting Between NRC and SNC Regarding Proposed Vogtle TS 5.5.11, Ventilation Filter Testing Program, License Amendment Request + (Pre-submittal Meeting - Meeting Between NRC and SNC Regarding Proposed Vogtle TS 5.5.11, Ventilation Filter Testing Program, License Amendment Request)
- ML22046A295 + (Pre-submittal Meeting - Request for Alternative to ASME OM Code ISTC-3630 - PIV Leakage (L-2022-LRM-0010))
- EPID:L-2022-LRM-0110 + (Pre-submittal Meeting - Request for Alternative to ASME OM Code ISTC-3630 - PIV Leakage (L-2022-LRM-0010))